08/0056 - Operational Works - Landscaping (Road Reserve) [As Published] · 142008.56
INTEGRATED PLANNING ACT 1997 iDAS Assessment Checklist, Version 21.0, 3 September 2007
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
45 Nn of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
Yes - (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application, the agency hes jurisdiction as Concurrence Agency.
IPA, schedule 8 part 1 table 4. tem 3(b). IP Regulation schedu'e 2. t2ble 2 lem 3, {P Regulation schedule | gait 2 table 4 tem 3, Wild Rivers code (Note the code does not currently
contain applicabie provisions for taking of snlerfenng sath artesian water}
4.6 [Js any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
No (1 Yes - Answer (a) and (b) below
(a) Are the operations mentioned as assessable development in the following?
« — Awater resource plan under the Water Act 2000 Jno [Yes
¢ — Aregulation under the IPA or another Act [no Dyes
If yes to either or both - (Complete Form 1, Part Ks). This application requires assessment by the Department of Natural Resources. and Water
(NRW). If NRW is not the Assessment Manager: for the application, the agency has jurisdiction as Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessabie in a wild river dectaration and to be carried out in a wild
river area declared under the Wild Rivers Act 20057
OINo (71 Yes - Depending on the purpose of the operational work and its propased location in the wild river area, assessment may be required for
the purposes of the Wild Rivers Act 2005. Also, in certain circumstances an appication for operational work is taken: to be not
properly made and the Assessment Manager must refuse to receive t. (Complete Form 1, Part Kaif an application is made.)
IPA schedule 8. part f, table 4 tei 3¢cy(i). P Regulation schedule 2. table 2 tem 8 IP Reguliton schedule | part 3 table 4. tem 3: Water Act 2009 section 966A {wild aver sea), Wild
Rivers Act 2005, section 43A
4.7 |\s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
No O01 Yes
If yes, are the operations mentioned as assessable development in the following?
« — Awater resource plan under the Water Act 2000 (No Yes
¢ — Aregulation under the IPA or another Act LNo O Yes
If yes to either or both- (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule 8 pat | labe 4 tem Xchs), ‘P Regulation schedule 2 table 2 dem 3 1P Regulabon schedule } pat 3 table 4 tem 3 Water Act 2000 secion 968A (iid aver area, Hole no curant Wild
Paver declaration identifies talong or inter‘enng with subartesian water as assessable) Wild River code (/.0te the code does nct currently contain appicable provisions for subartesian water)
4.8 | \s any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water
No Yes - Answer both (a) and (b) below
{a) Is the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
Y@s - Depending on the purpose of the operationat work and its proposed location in the wild river area, assessment may be required for the
purposes of the Wild Rivers Act 2005. Aiso, in certain circumstances an application for operational work is taken to be not properly made
and the Assessment Manager must refuse to receive it. (Complete Form 1, Part Kioif an application is made.)
LNo
{f no, are the operations mentioned as assessable development in the following?
« Awater resource plan under the Water Act 2000 LINo O Yes
e Aregulation under the IPA or another Act (No CJ Yes
If yes to either or both - (Complete Form 1. Part K1o) This application requires assessment by the Department of Naturat Resources
and Water (NRW). if NRW is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
(b) {s the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodptain management area} and declared to be assessable under that Act?
CJ No Oo Yes - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
{NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule 8, part }, table 4, tems 34c)1y) and Hd), iP Regutauan scnadule 2, table 2. item 9, iP Regulatinn schedu'e |. part 3. lable 4 nem 3A Water Act 2000. section 9668 {wild river area).
4.9 | \s the proposed operational work for the following?
© — For the construction of a referable dam as defined under the Water Act 2000 RlNo OD Yes
« — Toincrease the storage capacity of a referable dam by more than 10% he CO Yes
If yes to either or both - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule 8 part 1 table 4, tem 4 IP Regulation schec.’e 2 ‘abie 2 dem 10.
Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.