Council archive · source document
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published] · 142008.56
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
Applicant details (continued)
Individual contact person details
Title Me [First name [SHARON |Last name | Gittpepa
Postal address FO BOX (423, NOOSA HEADS QuD, 4SG7
Contact telephone number (07) Suyus OBE
Mobile phone number o4uOS 752. 254
Facsimile number (07) S44D 0286
e-mail address shannen. q lard @ Cape ouvard .caw
Owner’s consent and resource entitlement
10. Does the application involve a State-owned resource prescribed by schedule 10 of the Integrated Planning Regulation 1998(IP Reg) or
any other regulation?
No ao Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource-allocation or
entitlement
Table J
Nature of State-owned resource
Nature of evidence required
Allocation/entitement sel ie at State Government ‘i Date of
reference number Name of authorising officer | Position of authorising officer Department Date of issue. expiry
(1.
11. Dogs the application involve land other than State-owned land (ie. privately owned fand) and require owner's consent?
No O Yes - Complete Table K and submit, with the application, written documentation of all owner's consent
Table K
Owner name/s E Street address of lot on plan description Date written consent was obtained
{1.
Mandatory attachments and supporting information
12. What are the other parts of IDAS Application Form 4 submitted with this application, and the other mandatory attachments. and
supporting information accompanying this application, not identified in those other form parts?
Description of attachment or information Title (if appicable) a .
(9.9. Part C of Form 1, owner's consent, evidence of (e.g. General Authority, James Street Date Method of delivery ess
resource allocation/entitlememt, plans, drawings, reports) Traffic Report) managt
[1.
Portable Long Service Leave (PLSL) levy for building and construction work
13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for they
appiication can be given?
No - Complete Q13(a)
13(a) Indicate the reason PLSL is not applicable.
CJ The application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g, the application is only for a change of use or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests); OF
All costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.