INTEGRATED PLANNING ACT 1997

Part E, Version 3.0, 3 September 2007
Table B

 

(i) What is the nature of the operational work?

1 Roadworks 1] Stormwater CD Water infrastructure

x Landscaping (Clearing vegetation under the planning scheme
2 Orainage works [) Signage

—

(ii) Is the application for operationat work involving the creation of new lots?
No

C1 Yes - Specify number below

fT

(iii) What type of approval is being sought?
St Development Permit
{iv) Is there a current Preliminary Approval for this operational work on the premises?
No
(Yes - Complete Table B(a)
Table Bia)

C1 Sewerage infrastructure

1 Earthworks
(1 Other - Specify below

(Preliminary Approval

 

List of approval references
[4

 

Date approved | Date approval lapses

 

 

 

 

 

(v) werte works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
No
YY Yes - Complete Table 80)

 

 

 

 

 

 

 

 

 

 

 

 

 

Table Bib)
List of approval references Dateapproved | Date approval lapses
[ 1. Foéveropmenr pppeova. [REF go07 Jot | O2]OB]O 02/08 [oy
(OP WALKS = LANDSCAPING Lot 4 SPT SO0EH)
| GENERATE ANOTHER FABLE B
e@ Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of Method of lodgement
lodgement

Plans, and specifications if applicable, showing the nature and location of the proposed works
{including the extent of any cut and fil)

 

 

 

C]_ Confirmed DELIVELED

 

 

 

 

OFFICE USE ONLY

[Date received | ]__ [Reference numbers

Advice for completing Part &

General advice
« — Part A must also be completed for all IDAS development applications.
All questions must be answered unless, following a response, there is a statement to go directly to a particular question.

 

Q1&2

 

 

 

A development permit authorises development to occur, while a preliminary approvat is a step in the approval process and does not authorise
development to occur.

 

 

-2-

Used in these records

About this file

File size
4.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0056 - Operational Works - Landscaping (Road Reserve) [As Published].pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.