Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU21-0134 - Approved Bushfire Management Plan

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Bushfire Management Plan v1                                                                  NCES REF: J000953
Lot 189 on MCH1261 – 64 Reserve St, Pomona




4.3 Water Supply
The availability of a reliable water supply for firefighting purposes is a vital tool in the defence of
bushfire impact. Reticulated water supply is currently not available within the site. The proposed
development will therefore require provision of a readily accessible on-site emergency static water
supply in accordance with Assessment Benchmark 4 of the SPP Bushfire 2019. Assessment
Benchmark 4 references the QFES 2019 Bushfire resilient communities document for information
regarding appropriate static water supply. Section 9.1 of Bushfire resilient communities’ states:
An appropriate static water supply (in bushfire prone areas where reticulated supply is not provided)
to support effective emergency services response includes a water tank that is available solely for
firefighting purposes and can be accessed by firefighting appliances. The water tank is to be provided
within 10 metres of each building (other than a class 10 building), which:
a) is either below ground level or of non-flammable construction;
b) has a take-off connection at a level that allows the following dedicated, static water supply to be
left available for access by firefighters:
i.10,000 litres for residential buildings;
It is therefore recommended that a dedicated 10,000 litres should be made available to the proposed
new dwelling.
Note that the above recommended water supply volumes should be a static water supply. The
volume should be reserved for fire fighting purposes only. Plate 10 outlines an example of how this
can be achieved.




Plate 10 – Example Static Water Supply tank design for fire fighting purposes (Source: Kingspan Group 2021)

4.4 Fire Breaks
The provision of fire breaks and fire trails within a site located in a bushfire prone area offers an
important bushfire defence measure to assist in reducing the risk and severity of bushfire ingress
onto and through a site.
It is recommended a trafficable fire trail is provided around the inner perimeter of the recommended
APZ and which connects to the driveway to allow for safe access and egress and operational space
for fire-fighting vehicles.

4.5 Vehicular Access
Development in bushfire prone areas should be serviced by safe access/exit points for both
occupants and emergency services personnel. The development is to be serviced by a single access
driveway connecting to Reserve Street to the west. The total length of the proposed road is
approximately 100m and will generally be constructed on flat ground. The proposed driveway will be


© 2021                                            15
Log in to download the original file

MCU21-0134 - Approved Bushfire Management Plan.pdf · 4.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.