Original source · versioned page text
Paul Clout Design 19 Key Court
Attached to the e-mail Operational Works Application OPW21/0187 - DA Form 1 - Plans - Arbourist Report - 19 Key Ct Noosa Heads.
Paul Clout Design 19 Key Court Noosa Heads 4567 Australian Tree contractors & arboricultural consultants pty ltd “Managing trees in the urban forest” Kurt Brown Dip Arb, TRAQ Certified Paul Clout Design 19 Key Court Noosa Heads 4567 Australian Tree contractors & arboricultural consultants pty ltd “Managing trees in the urban forest” Kurt Brown Dip Arb, TRAQ Certified Arboricultural Report and Tree Protection Methodology / Plan Client: Paul Clout Design Site Address: 19 Key Court Noosa Heads 4567 Date of Inspection: 22nd of June 2021 Table of Contents Professional Disclaimer General References Qualifications Scope of Works Definition ARBORICULTURAL REPORT AND TREE PROTECTION METHODOLOGY. Professional Disclaimer: Although Australian Tree Contractors & Arboricultural Consultants PTY Ltd (ACN 614 266 125) (ATCAC) use all due care and skill in providing you with the information made available in this Report, to the extent permitted by law ATCAC otherwise excludes all warranties of any kind, either expressed or implied. To the extent permitted by law, you agree that ATCAC is not liable to you or any other person or entity for any loss or damage caused or alleged to have been caused (including loss or damage resulting from negligence), either directly or indirectly, by your use of the information (including by way of example, Arboricultural advice) made available to you in this report. Without limiting this disclaimer, in no event will ATCAC be liable to you for any lost revenue or profits, or for special, indirect, consequential or incidental damage (however caused and regardless of the theory of liability) arising out of or related to your use of that information, even if Tree Logic has been advised of the possibility of such loss or damage. This disclaimer is governed by the law in force in the State of Queensland, Australia. This Report is addressed to you and may not be distributed to, or used or relied on by, another person without the prior written consent of ATCAC. ATCAC accepts no liability to any other person, entity or organisation with respect to the content of this Report unless that person, entity or organisation has first agreed in writing to the terms upon which this Report may be relied on by that other person, entity or organisation. Report Assumptions The following qualifications and assumptions apply to the Report: Any legal description provided to ATCAC is assumed to be correct. Any titles and ownership of any property are assumed to be correct. No responsibility is assumed for matters outside of ATCAC’s control. ATCAC assumes that any property or project is not in violation of any applicable codes, ordinances, statutes or other local, state or federal government regulations. ATCAC shall take care to obtain all information from reliable sources. All data shall be verified insofar as possible; however, ATCAC can neither guarantee nor be responsible for the accuracy of the information provided by others not directly under ATCAC’s control. No ATCAC employee or contractor shall be required to give testimony or to attend court because of the Report unless subpoenaed or subsequent contractual arrangements are made, including payment of an additional fee for such services. Loss of the report or alteration of any part of the report not undertaken by ATCAC invalidates the entire Report and shall not be relied upon by any party. The Report and any values expressed therein represent the opinion of ATCAC’s consultant and ATCAC’s fee is in no way conditional upon the reporting of a specified value, a stipulated result, the occurrence of a subsequent event, nor upon any finding to be reported. Sketches, diagrams, graphs and photographs used in the Report, is intended as visual aids, are not necessarily to scale and should not be construed as engineering or architectural drawings, reports or surveys. Unless expressed otherwise: I) The information contained in the Report will cover those items that were outlined in the project brief or that were examined during the assessment and reflect the condition of those items at the time of inspection; and ii) The inspection is limited to a visual examination of accessible components without dissection, excavation or probing unless otherwise stipulated. There is no warranty or guarantee, expressed or implied by ATCAC, that the problems or deficiencies of the plants or site in question may not arise in the future. All instructions (verbal or written) that define the scope of the Report have been included in the Report and all documents and other materials that the ATCAC Consultant has been instructed to consider or to consider in preparing the Report have been included or listed within the Report. The Report is strictly limited to the matters stated in it and does not apply by implication to any other matters. To the writer’s knowledge all facts, matter and all assumptions upon which the Report proceeds have been stated within the body of the report and all opinion contained within the report will be fully researched and referenced and any such opinion not duly researched is based upon the writer's experience and observations. General References Australian Standards AS 4373 – 2007 Pruning of amenity trees. AS 4970-2009 - Protection of trees on development sites Wild Plants of Greater Brisbane – Queensland Museum Fraser Coast website and Maps/overlays Evaluating Tree Defects – A Field Guide by Ed Hayes, Second Edition Body Language of Trees - Research for Amenity Trees, Claus Mattheck Smiley E. Thomas, Nelda Matheny and Sharon Lilly April 2012. Tree Risk Assessment: Levels of Assessment Matheny Nelda and Jim Clark Feb 2009. Tree Risk Assessment: What we know (and What We Don’t Know) The use of the TRAQ as trained by the International Society of Arboriculture Qualifications: AQF Level 3 Arborist AQF Level 5 Arborist ISA Certified TRAQ Qualified Arborist Previous QAA Executive Committee Member 2012 – 2017 President of the QAA 2014- 2016 Past President QAA 2016- 2017 The Scope of Works: To assess the 2 trees and define a tree protection model prior to the driveway construction. Definition TPZ Tree Protection Zone SRZ Structural Root Zone DBH Dimension and Breast Height Arboricultural Assessment Tree 1 Botanical Name: Delonix regia Common Name: Poinciana DBH: 0.254 TPZ: 3.05m radius SRZ: 2.36m radius Height: 8m plus Canopy Spread: 7m approx. Tree 2 Botanical Name: Delonix regia Common Name: Poinciana DBH: 0.42 TPZ: 5.05m radius SRZ: 2.21m radius Height: 8m plus Canopy Spread: 7m approx. Observations The 2 trees identified both present as stunted specimens and have signs of what we can assume is vehicle impact. Both observations are typical for this species growing in a streetscape setting with all the restrictions of this growing position. There is approximately 7.6 m from centre of trunk to centre of trunk and once the SRZ is deducted we are left with a 3.2 m space for the driveway. Also considering that 10% incursion into the SRZ is acceptable we could assume this could be pushed out to 3.6m approximately for the driveway. There are some conditions as identified in the tree protection methodology that would need to be adhered to for this to be compliant with AS 4970-2009 Tree Protection Methodology After defining the TPZ and SRZ we can see that a tree protection Appoint Australian Tree Contractors & Arboricultural Consultants as Project Arborist (PA) Level 5 Arborist for the duration of the project. All tree protection guidelines to be as AS4970-2009. PA to set up tree protection fencing defining the TPZ. All fencing to have signage installed All contractors to be inducted by PA to the site and to sign onto the conditions of the Tree Protection Guidelines set out here. All demolition or construction works required within the SRZ or TPZ will need to be discussed and planned with the PA and the appropriate Tree Protection protocols be designed for each instance and reported and ensure they are within keeping with AS 4970-2009 All works within the TPZ to be supervised by the PA. All excavation works within the TPZ to be done with a vacuum excavation. And root pruning to be done by level 5 Arborist and supervised by the PA. Any conflicts in construction, design and Tree Protection to be discussed with the PA and all conflicts to be mitigated prior to works to stay compliant with AS4970-2009 and AS4373-2007 Kind regards Kurt Brown DIP Arb SCIT, ISA TRAQ Certified, Cert 3 Arb. Professional Membership QAA, AA, ISA M: 0431586371 W: www.australianconsultarborist.com.au [word/header1.xml] Australian Tree Contractors & Arboricultural Consultants P O Box 1411, Noosaville DC Qld 4566 E: [email protected] M: 0431586371 W: www.australianconsultarborist.com.au Helping Trees and People Get Along [Attachment: image3.png (image text)] * TREE PROTECTION AREA “ KEEP OUT! ‘TREES ENCLOSED BY THIS FENCE ARE PROTECTED BY PLANING CONDITIONS AND ARE SUBJECT OFA “ince PReseRvATION (Town & COUNTIEY PLANNING ACT 1990) [CONTRAVENTION OF TREE PRESERVATION ORDER MAY LEAD TO CRIMINAL PROSECUTION ‘THE FOLLOWING MUST BE OBSERVED BY ALL PERSONS:- ‘THE PROTECTIVE FENCING MUST NOT BE REMOVED NO PERSON SHALL ENTER THE PROTECTIVE AREA NO MACHINE OR PLANT SHALL ENTER THE PROTECTION AREA NO MATERIALS SHALL BE STORED IN THE PROTECTION AREA [NO SPOIL SHALL BE DEPOSITED IN THE PROTECTION AREA NO EXCAVATION SHALL OCCUR IN THE PROTECTION AREA [Attachment: image4.png (image text)] ATCAC Tree Risk Management Specialist
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.