Council archive · source document
09/0917 - Op Works - 2nd Driveway [As Published] · 142009.917
Studio 23 Ocean St, I] ARCHETYPE oe Maroochydore QLD 4558 INTERIOR®DESIGN $443 8803 [email protected] Assets & Infrastructure Department Sunshine Coast Regional Council Level 2 Pelican Street Tewantin Qld 4565 Date 10 July 2009 Dear Sir/Madam RE: 1 Paul Street, Noosa | Please find enclosed the completed application for number 1 Paul Street Noosa. Please contact me as soon as you have received this application. | can be contacted on the details | below: , | Cheryl Burns Mobile 0433042065 Yours sincerely Cheryl Burns Interior Designer Archetype - Quintessential Interior Design
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 21 pages
Page 2
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Form 1 Development Application
Part A
Common details
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
Applicant details (the Applicant is the person responsible for making the application and need not be the owner of the land. The Applicant is responsible for ensuring the
information provided on the IDAS Application Form is. correct. This information is relied upon by the Assessment Manager and any referral agencies when assessing and
deciding this application. By lodging this application, the Applicant incurs the obligations and responsibilities prescribed b; y! the IPA. Any development permit or preliminary
approval that may be issued as a consequence of this application will be issued to the Applicant)
Company or organisation name (if applicable} Arc HET PE . \ WTERIOE. Desion
Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details an an attachment to this form)
. . Last
Title Ms First name C We RN L name Bo VWns
Postaladdress| 23 Océan Greeet, Matoocpiookee, QUO 4588
Contacttelephone number | OF SUS 8820 Mobile phone number] O4 33 U2 oes
Facsimile number |o% SUUZB B80S e-mail address| chery | @ acchinteri or design -cohs
i Details of the premises (ie. tne and on which the development is proposed - refer to the advice at the end of the form) - of
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only, Then go to ce
Name of each focal government area in which the mobite and temporary ERA is proposed to operate
1.
OR
Table B Stregt address for the premises ( ~ applicable box/es below and insert property description in the table. Identify each fot in a separate row.)
(i) Street address / lot on plan for the premises (Appropriate for most applications including building applications); Of
(ii) [1 Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty, pontoon
elc) (Note: Lot on plan details may be oblained from litle documents, a ‘Rate’ notice, or from the local government.)
Street address Lot on plan description Local government area (e.g.
wa Seer Street Name and official suburbhocality name on Lot No. oan ope and Logan, Cains}
1 4 | Poul Street, Noosa. S64] 4 / 128795 NOOSA
AND/OR
Table Coordinates and/or a map of the premises (Appropnate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton Bay) etc.)
Coordinates
. . Zone Local government area
_ (Note: place each set of coordinates ina separate row) _ Reference Datum (if applicable)
Easting Northing Latitude Longitude
1. C1) coaes (J wese4
CJ Other
Page 1
Page 3
INTEGRATED PLANNING ACT 1997 2. Part A, Version 3.1, 3 March 2008. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Wote: in most instances, the premises will not involve any of the Jollowing characteristics, however some applications may involve one or more of these characteristics - complete onty if applicable} Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal} Name of water body, watercourse or aquifer (i known) 1. Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994 Lot on plan description for strategic port land Port authority for the lot Table F Complete if the premises are in tidal water Name of local government for the tidal area (// applicable) Name of port authority for the tidal area (/ applicable) 3. 5]/3/3|: [Am = Cy hectares (+ appiicabie unt) | Existing use of the premises 4, Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.) Indicate the total area of the premises on which the development is proposed: (Wole: The total area may include land both above and below water) Total area of premises (land on which the development is proposed) House §. Arethere any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water elc,) No Proposal details = « a vam 2 ca omen am ee ar re : oy sae age Ore Yes - Ensure the type, location and dimensions of each easement are included in Plans. submitied with the application Sm em mn Te sa mrs Soar. = 6. Brief description of the proposal: (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture etc.) New driveway for access onto Youl Street. 7. CONo Does the proposal include new building work or operational work (including any services) on the premises? Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application | Resource entitlement (fappticable) ~ further information is provided in the advice section at the end of the form 8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.9. the application involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Waler Act 2000, etc.) (I No - Go0aQ9 Table G O Yes - Complete Table G - provide details for each evidence required on a separate row, if. applicable, Evidence of resource allocation or entiftemem must be submitted with the application. You do not need to answer Q9 - go to the next section. Nature of State-owned resource Nature of evidence required Allocation/entitlement sat a vai State Government Date of | Date of reference number Name of authorising officer Position of authorising officer Department issue _| expiry L Owner's consent / apptcabt) - hmthe information is provdedin the advice section atthe end ofthe frm 9, Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995, or work on rait corridor land defined under the Table H Transport infrastructure Act 1994 - provide details for each owner on a Separate row, or on an atiachment to this form if applicable. Premises Owner's name/s Details of the premises owned * Date consent and postal address (street address or fot on plan description) Owner's signature’ was obtained * Owner's signature cannot be provided on the form if you intend to submit ihe application electronically. Owner's consent must be provided to the assessment manager on an attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cweatth) details how a company may sign as owner. Templates for the pravision of owner's consent are available on the IPA website . Page 2
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.4, 3 March 2008 | Attachments and supporting information (Complete Table | - Use a separate row for each type of attachment or information, including information required under Tthis Par) Please ensure all documentation submited with this form, inchuding other Pais of Form 1, or oiwner's consent, etc, are securely attached to this Part of the Form. Table | Description of attachment or information Title ( applicable) Method of delivery to (4g. Pan Cf Fam 1 comes consent eer of resource | (ag. Genera Athoiy, James Stee Trac Repo) Date assessment manager 1. 10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (~ box applicable) 11. 12. CL the application seeks a preliminary approval only; ( the application is not for building and construction work under the Building and Construction industry (Portable Long Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controtling weeds or pests), Ci alt costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or CU the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 - Complete and submit a Qleave Notification and Payment Form (no payment required f owner-builder permit number stated). The receipted form must be sighted by the assessment manager before a development permit can be given. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information) CI No - End of Part A C1 Yes - Answer Q12 below Has the PLSL levy been paid? O No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a Notification and Payment Form to Qleave,) Oo Yes - Complete Table | and submit, with the application, the "yellow" (Local Government's (Council) / Private Certifier’s) copy of the receipted QLeave Form. . . QLeave Project Number Table L Amount paid Date paid (6 digis, starting wih A, 8, E, L or P) OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional) Fee ($) Date received omen Reference NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To: Council, | have been engaged as the private certifier for the building work referred to in this application. ate of engagement Name BSA Certification license number Building classification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Date receipted form Description of the work QLeave Project Number Ano Paid Date paid sighted by Name of officer who sighted the form assessment manager Privacy Statement The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by fegisiation (including the Freedom of information Act 1992) or a5 required by Parhament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002. Page 3
Page 5
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
Form 1 Development Application
Part E
Building &/or operational work assessable against a planning scheme!
‘Nature of work that requires assessment against a s planning scheme:
(21 Building work - Comprete Table A {4 Operational work - Complete Table B
Table A
fi) What is the nature of the building work made assessable in the planning scheme?
| : ——
_ |i) Are there any current approvals associated with this application? (e.g. materia! change of use}
1.
CINo C1 Yes ~ Provide detaits betow ; /
List of approval reference/s Date approved Date approval lapses (if known)
L1.
Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
CO Roadworks (Stormwater (J Water infrastructure ([] Clearing vegetation under the planning scheme
(Drainage works = (_] Earthworks (2 Sewerage infrastructure /
(7) Landscaping UO Signage (Wd Other ~ specity c ONC
(ii?) What type of approval is being sought? (NOTE: i you have indicated mutipie operational works in question (i) above and yaur answers to this question
. would be ailfarent for different operational wark, it may be more appropriate to provide these details in an attachment to this form)
oO Development Permit (2 Preliminary Approval (Both (specity veto)
{iv) Is the operational work necessary to facilitate the creation of new lots fie. subdivision?
No (1 Yes - Specify the number of lots being created
(v) Are there any current approvals associated with this application? é 9g. Development Permit or Preliminary Approvat for MCU or reconfiguring a fo)
iP No O1Yes- Complete Table Bfa)
Table B(a) List of approval references . Date approved Date approval lapses (i Known)
1.
2
2. Whats the dollar value of this operational work? fle. the total value inctuaing GST, materials and lebou) $ G GOO
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement| Method of lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works (hetefing ihe! (bl Confirmed
jeatent of any cut and Fi)
OFFICE USE ONLY
Date recétved * , Reference numbers
Advice for completing | Part E
General advice
« Part A must also be completed for ail IDAS development appilcations. .
¢ The applicant is responsible for answering all questions fully and correctly, untess following a responsa there is a statement to go directly to another question.
a1 I A development penmit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
1 This form Is also used for building or operational work assessable against the land use plan for Cairns airport land or Mackay airport land. Wherever
planning scheme is mentioned, take it to mean thé land use plan for the airport land,
Page 1
ee oe we
Page 6
INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 22 "
Form 1 Development Application
IDAS
_ Assessment Checklist
ing app
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qld.qov.au for help
For all IDAS development applications (except those for bulldirig work requiring assessment against the Building Act 1975 only) — complete Section 1 of this
checklist :
Does the application seek approval to make a material change of use of the premises? Yes fe No
dyes ~ complete Section 2 of this checklist.
Does the application seek ‘approval to reconfigure a lot? (Yes RaqNo
It yes - complete Section 3 of this checklist and Part F of IOAS Application Form 1. if the premises are completely within a single local "
government area assessment is by the local government.
Does the application seek approval to carry out operational work? ] Yes }(_] No
ityes - complete Section 4 of this checklist.
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? (Yes | Ka’ No
dyes - complete Section § of this checklist.
Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development (Yes EINo
application? .
ifyes - complete Section & of this checklist. ‘
Does the application seek approval to carry out building work requiring assessment against a local government 0 Yes | Be’No .
planning scheme?
ifyes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? 0 Yes Bino
i yes - go to Appendix 1 of this checktist for advice on building referrals. Complete Part 8 of IDAS Application Form 1. Assessment is by a
building certifier. .
Do you wish the application to be assessed against a superseded planning scheme? O Yes | S3¥’No
dyes - complete Form 1 Atiachment 1. :
Is the application for development completely or partly on Cairns or Mackay airport land under the Airport Assets (1 Yes IXINo
(Restructuring and Disposal) Act 20087
if yes -Assessment is by the Department of infrastructure and Planning. Complete Form 1 Part D of 1OAS Application Form 1 if the application
#8 for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the local government as
Advice Agency.
Paget _
Page 7
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
{HERITAGE |
141A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensiand Heritage Act 1992?
[ANo - Goto 118 «(Yes
IPA, schedule 8 pat 1 iabie $. tem 2. IP Regulation, schedule 7 iatle 7 gem 18
1.18 Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
[No -Go1ai2 ([_] Yes
IPA, suhedute 8. part | table 5. item 2A. 1P Regulation, schedule i, part 2. iable 3, dem 2.
IREMOVING QUARRY MATERIAL; WILD RIVER AREA ; |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
ANo - Go woai3 ([] Yes
IPA, schedule 8, part 1, table 5, item 1; 1P Regutavon. schedule 2, table 2, tem 11; IP Regulation, schedule 1, table 5, tem 2 (yald river area); Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A
jENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA : |
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[A No- corona DD Yes °
IPA, schedule 8, part 1, lable 2, item 1 IPA, schedule 8, part 1. table 5. items 2 and 4; 1P Regulation, schedule 2, table 2, toms t and 23; Enviroumental Protection Act 1994, section
7344 (wild river area); Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Revers Code.
WITHIN THE LIMITS OF A PORT 2 . . a |
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
Y No - Go Q15
CJ Yes
IP Regulation, schedule 2, table 2, items 15 and 16
[DECLARED FISH HABITAT AREA |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No - Goto Q1.6
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
JP Regulation, schedule 2, table 2, item 26
\COMMUNITY INFRASTRUCTURE . |
1.6 ls any part of the premises designated for community infrastructure?
No = Goto Q1.7
(Yes
IP Regulation, schedule 2, table 3, item 7
[WASTE WATER MANAGEMENT a |
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -Endof Section (_] Yes
IP Regulation, schedule 2, table 3, tem 5
Page 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
S ECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
4A can proposed operational work assessable under any State planning regulatory provisions?
No
If no, is the proposed opgrational work assessable under the planning scheme?
LI No - Gow a42 Yes — Complete Form 1, Part E and answer 04.1.1 - 4.1.7 below
(Yes
Ifyes, is the proposed operational work assessable under the planning scheme?
0 No - Answer 04.1.1- 4.1.7 oO Yes - Complete Form 1, Part E and answer Q4.1.1 - 4.1.7 below
STATE-CONTROLLED ROAD .
4.1.1. | ls apy part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No
If no, is the proposed operational work for filing or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
or it exceed the threshold?
No O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
C1 Yes
if yes, is all of the proposed operational work associated with either -
+ Amaterial change of use that is assessable under the planning scheme; or (No [Yes
+ Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlled road
If no - Answer (a) - (¢} below
(a) Is any of the proposed operational work associated with access to a State-controlied road?
No Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
{b) Is any of the proposed operational work for filling or excavation?
CINo me
ILygs, is the operational work proposed in a future State-controlied road not defined by route?
No - This application must be relesred to the Department of Main Roads (DMR) as Concurrence Agency
O Yes - This application must be referred to DMR as Advice Agency.
es
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
throygh a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
[No (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
LI No- tis 4pplication must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
oO Yes - This application must be referred to DMR as Advice Agency.
iP Reguiation, schedule 2. table 3, tei 31P Requistion, schedute 2, table 2, item Ho).
ACID SULFATE SOILS Z
4.4.2 | Is any of the operational work proposed in a local government area listed*.' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
No -Gowads3 C)Yes
if yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
CINo (Yes
If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000ms of soil or sediment at or below 5m AHD CUNo (Yes
(ii) Filling the premises with 1,000m: or more of material with an average depth of 0.5m on LINo [1] Yes
land, soil or sediment at or below 5m AHD
Hf yes to either or both (i) o* (ii) above - This application must to be referred to the Departmen of Natural Resources and Water (NRW) as
< Advice Agency
++ «| P Regulation, schedule 2, rable 3, ites 4: State Planeny Policy 2:02: Planing and Maneging Development aivotving Acul Sulfate Soils, sectean 3 6.
“+ Aurukun, Bowen, Brisbane. Broadsound, Bundaberg, Burdekin, Burke, Bumelt, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook. Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay. Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton. Sarina, Thuringowa, Tiaro, Torres, Tewasville, Whitsunday
Page 27
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
EASEMENTS AND SUBSTATIONS
4.1.3. | Is any of the proposed opergtional work for filling or excavation?
LINo-ceworrs = [Yes
If yes, is the filling o”excavation associated with reconfiguring a lot?
Yes No - Answer both (a) and (b) below
{a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity
the Electricity Act 1994?
No (Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
LINo — [1 Yes- this application must be referred to the entity as Advice Agency.
(b) ts any of the operational work proposed to be located within 10m of a substation site under the Electricity Act
1998?
No (Yes - mis application must be referred to the entily responsible for the substation as Advice Agency.
IP Reguiation, schevule 2, table 3 tem Ita}: IP Regulauon, schedule 2, table 3, item 10{b).
4.1.4 |\s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gowa415 (] Yes
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?
CI No OYes
If yes, is any of the operational work proposed to be located in any part of the easement?
No - O Yes - This application must be referred to the licence holder as Advice Agency.
JP Reguianon. schedule 2. table 3, item 17.
PUBLIC PASSENGER TRANSPORT
4.1.5 |\s any of the proposed operational work listed in schedule 13C of the /ntegrated Planning Regulation 1998 and does it exceed the
ified threshold?
No - Go to 04.1.6 oO Yes - This application must be referred to Queenstand Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 14.
RAILWAY SAFETY AND EFFICIENCY
4.1.6 ||s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
spegified threshold?
No - Go 10 Q4.1.7 Oo Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Reguiatan. schedule 2, table 3, itenr 15.
KOALA CONSERVATION (outside SEQ urban footprint)
4.1.7 | ls any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
No - Go 1004.2 (Yes
Hf yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (ie. did you answer ‘yes’ to all questions in either Q2.1.8 or Q 3.12?
(1 Yes-cowas2 [INo
If no, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
Cl Yes-Gotoa12 ([JNo
if no, will the activity result in the following?
(i) Clearing of native vegetation over an area greater than 2,500m? LINo ;C1 Yes
{ii) Extracting gravel, rock or sand from an area greater than 5,000m2 LINo {C1 Yes
(iii) Excavating or filling an area greater than 5,000m2 CINo iL] Yes
If yes to one or more of (i) - (ili) above - This application must be referred to the Environmental Protection Agency (EPA) as
Concurrence Agency.
IP Regulation, schedule 2. table 3. tem 19.
WILD RIVER AREA - atthough legistation provides for assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers code to that type of development.
Page 28
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessmeni Checklist, Version 22
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA
42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No-Gowo43 (J) Yes
If yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
oO No - (Complete Form 1. Part E} if the premises are completely within a single Jocal government atea, the operational work associated with reconfiguring
fs assessed by the local government.
(Yes
If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area,
as defined by the Wild Rivers Act 2005?
LNo- (Complete Form 1, Part E) if the premises are completely within a single local government area, the operational work associated with
reconfiguring is assessed by the local government.
oO Yes {Complete Form 1, Part E) if the premises are completely within a single focal government area, the operational work associated with
reconfiguring is assessed by the local government, and subject to the declaration for the relevant wild river area, assessment by the locat
government is required for the purposes of the Wild Rivers Act 2005.
IPA, schedule 8, purt 1, table 4, tem 2, iP Regulauon. schedule i, part 2. table 5, tem ic): Wild Rivers code (Note: the Coe does not currently contain applicable provisions for residential,
industriel or commercial development inside a designated urban area}.
KOALA CONSERVATION (inside SEQ urban footprint) ;
4.3A | \s gay part of the premises in an interim koala habitat protection area?
No - Goto. 04.38 (Yes
If yes, is the proposed operational work for clearing native vegetation, as defined in draft South East Queensland Koala State
planning regulatory provisions (koala regulatory provisions)*??
LINo - Gooa438 [_] Yes
If yes, does the following apply?
{i) the proposed clearing is for a domestic activity, as defined in [No |L1 Yes
the koala regulatory provisions oe
(@ the proposed clearing is for a building or structure of tess than 500 m? CINo if) Yes
gross floor area
(ii) the proposed clearing will result in - [no iL) Yes
e the clearing of less than 2,500m? of native
vegetation, as defined in the koala regutatory
provisions; and
« noloss of mature koala habitat trees, as defined in
the koala regulatory provisions.
(iv) the proposed clearing is consistent with a development approval {L]No {C1 Yes
for a material change of use, reconfiguring a lot or operational
work that has not lapsed, where
« _ the application for the development approval was :
made before 12 December 2008 ; or “7 ph wo
* the. deveiopment approval was given under Division
2 of the draft South East Queensland Koala State
planning regulatory provisions.
If no to all of (i) — (iv) above - The proposed operational work for clearing native vegetation may not occur and an application involving that
component cannot be made.
IP Regulation, solidi 2 table 2 tem 4A Draft South East Cueenstand Koals Stote planning regulatory provisions
42 Nalive vegetation is defined in the draft South East Queensiand Koala Stale planning requiatory provisions, The term ‘clearing’ has the meaning given in the integrated
Planning Act 1997, schedule 10 {dictionary}.
Page 29
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
VEGETATION CLEARING; KOALA CONSERVATION (outside SEQ urban footprint); WILD RIVER AREA
4.3B | Is apy of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies?
INO -Gowasa {(]Yes
It yes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA?
CIJNo-Gowoss (Yes
If yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A
for one or more of the following? oe _ Mee .
(i) A project declared to be a significant project under the State Development and Public Works ‘(No |(1] Yes
Organisation Act 1971, section 26
(ii) Necessary to control non-native plants or declared pest Ono | Yes |
(iii) To ensure public safety (No {LJ Yes
{iv) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing (No {C1 Yes
necessary built infrastructure, if there is no suitable alternative site for the fence, firebreak,
road, track or infrastructure
(v) A natural and ordinary consequence of other assessable development for which a CNo |( Yes
development approval as defined under the Planning Act was given, or a development
application as defined under the Planning Act was made, before 16 May 2003
(vi) For fodder harvesting CNo |C] Yes
(vii) For thinning (No |L Yes
(viii) For clearing of encroachment CI No |C Yes
(ix) For an extractive industry CINo |Z Yes
(x) For clearing regrowth on leases issued under the Land Act 7994 for agriculture or grazing OONo |( Yes
purposes _
(xi) For clearing regrowth on freehold land, or indigenous lang, in a wild river high preservation §[JNo |] Yes
area.
Hf no to all (i) - (xi) above - Zhe clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
If yes to any one of (i) - (xi) above, is the proposed clearing associated with a material change of use or reconfiguring a
lot for which referral is required in relation to clearing vegetation (ie. did you answer ‘yes’ to all questions in either Q2.1.4 or Q 3.3)?
(Yes - Goto 04.4 .
O No ~ Answer (a) (b) and (c).on the next page of this Checklist.
Page 30
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA (continuea)
(a) Is any of the proposed clearing in an area declared as an area of high nature conservation value (other than a
wild river high preservation area) or an area vulnerable to fand degradation under the Vegetation Management
Act 1999?
oO No - (Complete Form 1, Part J). This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
(1 Yes
If yes, is any of the proposed clearing for (v), {vi). (ix) or (x) above?
| No - (Complete Form 1, Part J). This application requires assessment by the Department of Natural Resources and Water
(NRW). I NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
oO Yes - The clearing is nol a relevant purpose and the Assessment Manager must refuse to receive the application
(b) Is any of the proposed clearing in the high preservation area of a declared wild river area?
No - (Complete Form 1, Part J). This application requires assessment by the Department of Natural Resources and Water (NRW),
if NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
C1 Yes
It yes, is any of the proposed clearing for the following purposes?
o pro x
t For (i), (vi), (wi) of (ix) above _..__LONe | C1 Yes.
(ii) For (x) or (xi) above and in a high preservation area outside of a [No | £1 Yes
registered area of agriculture as defined under the Vegetation
Management Act 1999
If no to either or both (i) or (ii) above - Subject to the declaration for the relevant wild river area, the application
requires assessment for the purposes of the Wild Rivers Act 2005 - Complete Form 1, Part J. This application
requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not the Assessment
Manager, the agency has jurisdiction as Concurrence Agency.
If yes to either or both (i) or (ii) above, is there a property development plan approved under the Wild
Rivers Act 2005 applying to the land?
oO No - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
C Yes - Unless the application is consistent with any approved property development plan applying to the land, the
Assessment Manager must refuse to receive it. Subject to the declaration for the relevant wild river area, the
application requires assessment for the purposes of the Wild Rivers Act 2005 if an application is made
complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
(c) Is any of the proposed clearing in a koala conservation area or koala sustainability area, other than in an
SEQ urban footprint area?
LINo - Go10044 Yes
If yes, is any of the proposed clearing associated with reconfiguring a lot for which referral is required in
relation to proposed clearing in a koala conservation area or koala sustainability area (ie. id you answer
‘yes’ to all questions in Q3.12)?
DO Yes -Gowots CINo
If no, is any of the proposed clearing over an area greater than 2,500m?2?
LINo - Gowasa
Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.
1 dents iA-1G, IP Regulation, scheauie 2, table 2, dem 5 (vegetation clearing): IP Rogutati
cheanngid nver area), Vegetation Management Act 1999, suction 22A (vegetation chearaxy
Ld
dredule 2, table
ver urea), Wild Rive
ra 34 (ropla conservation), IP Reguiouon, schixitde 1 pat
fs At 2008, seanons STF ant 43A, Wild Revers Corte
Page 31
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under the Water
Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No-Gotass — (] Yes - Answer (a) and (b) below
(a) Are the operations mentioned as self-assessable development in the following?
(i) Awater resource plan under the Water Act 2000 [LINo Yes
(ii) A wild river declaration under the Wild Rivers Act 2005 [_] No C1 Yes
(iii) A regulation under the IPA or the Water Act 2000 [DNo (ClYes
If no to all of (i) to (iii) above - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to (b)
(b) Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
O Yes
if yes, is the work for the following?
(i) Awater pump LI No | (1 Yes (compiete Form 1, Part Ko)
{ii) Water storage - ; LINo | (1 Yes (Compete Form 1, Part K:)
(iii) Gravity diversion from a watercourse LINo | © Yes (Complete Form 1, Part Ki)
(iv). Watercourse diversion (No | C1 Yes (Comptete Form 1, Part Ks)
(v} Other work for taking or interfering with water CONo | C1 Yes (Compiete Form 1, Part Ks}
If yes to any one of (i) to (v} above - # any part of the proposat relates to operational work that interferes with water in a high preservation
area, or in a nominated waterway (other than for a dam or weir), the application will be taken to be not properly made and the Assessment
Manager must refuse to receive it. All other proposals are subject to the declaration for the relevant wild river area, and assessment may
be required for the purposes of the Wild Rivers Act 2005. The application will require assessment by the Department of Natural Resources
and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form 1, Part K as indicated in the table above if an apptication is made.)
LJ No
If:no, is the work for the following? —
(i) A water pump (CINo {L1) Yes (Compete For 1, Part Ko)
(ii) Water storage CINo jC Yes (complete Form 1, Part Ks)
(iii) Gravity diversion from a watercourse LCINo {C1 Yes (Complete Form 1, Part Ki)
{iv) Watercourse diversion [No {111 Yes (Complete Form 1, Part Ko)
(v) Other work for taking or interfering with water [No | (1 Yes (Complete Form 1, Part Ko)
If yes to any one of (i) to (v) above - The application will require assessment by the Department of Natural Resources and Water (NRW). IM NRW.
és not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form 7, Part K as indicated in the table above.)
1, table 4, items Yak IP Regulation, schedule 2, table 2, tem 8; IP Reguistion, schedule 1, punt 3, table 4, items 3 und JA, Vater Act 2000, section 966A (wild river
Act 2005, section ASA, relevant wilt ever deckwtattion: Wid Rivets Code.
45
Is any of the proposed operational work for any thing constructed or installed that allows, under the Wafer Act 2000, for taking or
A interfering with artesian water (other than using a water truck fo pump water)?
No - Goto 04.6 Oo Yes - (Complete Form 1, Part K;) This apptication requires assessment by the Department of Natural Resources and Water (NRW). if
NRW is not the Assessinent Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule & pait 1, able J, tem Hb) IP Requiation schedule 2 table 2. tem 8 1P Regulation. scl
the code does nut curently contain applicable provisions for taking of interiering with artesian weiter}.
anne 1, pant 3. table 4, ten 3: relevant wild river declaration, Wild Revers Code (Note:
Page 32
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)
46
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
No - Go10Q47 Oo Yes - Answer (a) and (b) below
(a) Are the operations mentioned as assessable development in the following?
() A water resource plan under the Water Act 2000 LINo (I Yes
{ii) A regulation under the IPA or the Water Act 2000 [No (Yes
If yes to either or both of (i) or (ji) above - (Complete Form 1, Part Kz). This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessient Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?
(No (2) Yes - srany past of the proposal retates to operational work in a high preservation area other than works stated in a wild river
declaration for the area to be assessable development for which a development application may be made, the application will
be taken to be not property made and the Assessment Manager must refuse to receive it. All other proposals ate subject to the
declaration for the relevant wild river area, and assessment may be required for the purposes of ihe Wild Rivers Act 2005.
(Complete Form 1, Part Keif an appitation is made}
1 schedule
1» Wild Rivers Code.
IPA schedule B peut 1 alie 4
Rivers Act 2005, secuon 413A. re
kom B IP Requiation, sche 1 paut 2, table 4 tent 3: Water Act 2000, section 966A (wid iver sted): Wild
47
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
Wo cones C1 Yes
If yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 LLINo C1 Yes
{ii) A regulation under the IPA or the Water Act 2000 CI No CL Yes
If yes to either or both of (i) or (ii) above - (Compiete Form 1, Part K:) This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
ayes: ne Current wild
weiter).
IPA, schedtike 8 part 1. table 4, den: 3tcHobs IP Regulation. schetkile 2 table 2, tem 8 1P Reguiatin, schextiie , part 3 teble 4, tem 3: Water Act 2000, suction S668 wid me
vet deviwation Hevthies taking or aterteting wath suibartesion water us assessable); Wid River code [Note the code does not curerdly contain applicable provsins tr sutia
48
Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering
with overland flow water (other than using a water truck to pump water)?
No - Goto 04.9 (I Yes — Answer both (a) and (0} below
(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?
O Yes
If yes, indicate what the proposed operational work relates to
(i) Specified works for the area [LI No 0 Yes
fii) Work state in the relevant wild river declaration to be CNo (1 Yes
assessable development for which an application may
be lodged
If yes to either or both of (i) or (ji) above - (Complete Farm 1, Part Kio. Subject to the declaration for the relevant wild river area, assessment
may be required for the purposes of the Wild Rivers Act 2005)
If no to both (i} and (ii) above - ine application wait be taken to be not properly made and the Assessment Manager must refuse to receive it.
[No
If no, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 LINo C1 Yes
(i) A regulation under the IPA or the Water Act 2000 [No LJ Yes
If yes to either or both of (i) or (ii) above - (Compiete Form 7, Part Kis) This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
{b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
Oo No Oo Yes - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
3A,
IPA schedule 8. pant 1 table 4 seins Ho) and Ha) F Regulation, sched 2, table 2 item $ IP Regulation, schedule 1, patt 3 table 4, tent
relevant wild tives declaration, Witd Ravers Code.
later Act 2000, section S66 (wild ryver areal
Page 33
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)
4.9 | \s the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety No (J Yes
and Reliability) Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% Mio OD Yes
If yes to either or both of (i) or (ji) above - (Complete Form 1, Pant K:) This application requires assessment by the Department of Natural Resources and
Water (NRW), if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule & pant 1, table 4, nem 4. 1P Requievon, schedule 2 teblz 2 dem 10.
TIDAL WORK; WILD RIVER AREA’
4,10 ||s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No -Go100411 1 Yes — Answer (a) and (b) below
(a)_|s any of the proposed tidal work prescribed tidal work?
Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
LINo
| If no, is the work proposed in a canal?
| CINo
| If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
| (No- (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensfand
| Transport (Maritime Safety Qid) as Concurrence Agency.
| oO Yes - (Complete Form 1, Part P), if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Safety Qld) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
| OJ Yes
\ If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
; oO No - (Complete Form 1, Part P}. This application must be referred to Queensland Transport (Maritime Salety Qid) as
' Concurrenice Agency.
| Oo Yes - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qtd) as
L Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.
DJ Yes
If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
LJ No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
OYes
Hf yes, is the work proposed in a canal?
LI No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
O No - Unless the application is consistent-with any property development plan applying to the-Jand.-the Assessment.
Manager must refuse to receive it (Complete Fort 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005.
(0 Yes - untess the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensiand Transport (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.
0 Yes
if yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No ~ Unless the application is consistent with any property development plan applying to the land, the Assessment
{ Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensiand
Transport (Maritime Safety Qid) as Concurrence Agency. Subject to the deciaration for the relevant wild river
area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
' Oo YeS - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safely Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
_____The application also requires assessment for the purposes of the Wild Rivers Act 2005.
_ O No - Go to the first question on the next page of this Checklist
Page 34
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
TIDAL WORK; WILD RIVER AREA (continued)
Ifno, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
DI Yes
! If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
CINo - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
Yes
If yes, is any of the proposed tidal work for a marina with move than 6 vessel berths?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it. (Complete Form 1, Part Mj This application requires assessment by the Environmental Protection
Agency (EPA). HEPA is nat the Assessment Manager lor the application, the agency has jurisdiction as Concurrence
Agency. The application also requires assessment by Queensiand Transport (Maritime Safety Qid} as Concurrence Agency
and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005.
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it. (Complete For 1, Part M) This application requires assessment by the Environmental
Protection Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. The application also requires assessment by Queensland Transport (Maritime Safety Qid) as
Concurrence Agency and Qld Fire and Rescue Service as Advice Agency. Subject to the dectaration for the refevant wild
river area, the application alse requires assessment lor the purposes of the Wild Rivers Act 2005.
(No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 1, Part M) This application requires assessment by the Environmemial Protection Agency (EPA). If EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency.
oO Yes - (Complete Form 7, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency) and Qld Fire and
Rescue Service as Advice Agency.
(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
()__ One only local government tidal area (No |L1Yes
(ii) Starting in one local government tidal area and extending into another local government tidal {(]No | Yes
area (but in no strategic port tidal area)
(iii) In two or more local government tidal areas but not starting in either local government tidal area [1] No |] Yes
(iv) One only strategic port tidal area C1ne |] Yes
(v) A tidal area that is not a strategic port tidal area or a local government tidal area Ono |L1 Yes
Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.
JPA, schette 8. pari 1. table 4, tent 5, 1 Regulation, schettute: 2, table 2, tems 12, 14 and 17, IP Requianon, schedule 1, part 3, table 4, items 4A and 5: Coastal Prowtion and
Management Act 1995, jon 1O4A fui river area).
Page 35
Page 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11
Is arly of the operational work proposed to be carried out within a coastal management district?
No-Gowati2 (]Yes
_ifyes, is the proposed operational work for the following?
(i)_ Interfering with quarry material on State coastal land above high- -watermark in No io Yes |
vee ce cece PETES J
_ Disposing of dredge spoil or other solid waste material in tidal waters . ‘O No }(] Yes
) Draining or allowing drainage or flow water or other matter across State costal land ‘above high-water LINo Og Yes
mak _ ; | |
(iv) Constructing or installing works in a watercourse where the works are not assessable under IPA, {No }(] Yes
schedule 8, part 1, table 4, items 3 or 4
(v)_ Reclaiming land under tidal water= LNo |C Yes
(vi) Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot ONo |( Yes
(vii) Constructing an artificial waterway that is a canal, associated with reconfiguring a fot= (No |( Yes
(viii) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State (No |( Yes
coastal land, above high-water if the maximum surface area of water on the waterway is at least 5,000m?
(ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, (No 1(0 Yes
above high-water mark 7 ; ,
(x) Removing or interfering with coastal dunes on land, other than State coastal tand, that is in an erosion [No |Z Yes
prone area and above high-water mark
If yes to one or more of (i) - (x) above, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act
20053?
DNo- (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is nol the Assessment
Manager for the application. the agency has jurisdiction as Concurrence Agency. If yes, above, to any shown bold and marked with the symbol,
the application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency.
(Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it
{Complete Form 1, Part M) This application requires assessment by the Environmentat Protection Agency (EPA). if EPA is not the Assessment
Manager for the application. the agency has jurisdiction as concurrence Agency. if yes, above, to any shown bold and marked with the symbol 2, the
application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency. Subject to the declaration for the relevant
wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
oO No - An application for the operational work wil be taken to be not properly made and the Assessment Manager must refuse to receive it.
IPA, schedule 8, part 1, table 4, item 5; IP Regukation. schedule 2, table 2, tems 12 and 14: 1P Reauation, schedule 1, part 3, table 4, dens 44 und 5; Coustel Protection and Management
Act 1995 Act 1995. section 104A (wild river area); Wild Rivers Act 2005, section 43A.
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12
Is apy of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gotoa413 [_] Yes
Ifyes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
LINo
If no, is all of the operational work for constructing or raising waterway barrier works - tick applicable box/es and answer (a) and/or (b) below
LM) temporary Ne | Eyes
a ee
(iii) rebuilt on a regular basis [No (Yes
(a) if yes to one or more of (i) - (iii) above, does all the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
LD Yes - A permit for that aspect of the operational work is not required. Go to Q4.13 LI No - Go to
{b) If no to all of (i) - (iii) or no to (a) above - (Complete Form 1, Part Ox) This application requires assessment by the Department of Primary
Industries and Fisheries (DPI&F). If DPIRF is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
D Yes
If yes, is any of the proposed operational work to be carried out in a wild river high preservation area?
CO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 7, Part 03) This application requires assessment by the Department of Primary Industries and Fisheries (DPIKF). and,
subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPI&F is not the
Assessment Manager for the apptication, the agency has jurisdiction as Concurrence Agency.
O Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager musi refuse ta receive it.
IPA, schettii:
part 1 table 4, tem 6 IPA, schedule 8, part 2 table 4. sem 2: Fishenes Regukiior: 1995 8 113A (sell.
able codes). iP Reguiatiin schedule 2 table 2, ment 28 IP
Reaukiuon, schedule 1, pant 3, table 4, tem 6, Fisheries Act 1994, section 76D (wikd ver area): Wild Reers At
chet AJA,
Page 36
Page 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13. |\s any of the proposed operational work to be carried out completely or partly within a deciared fish habitat area under the Fisheries
Act 7994.
No-Gowatie [J Yes
If yes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
(i) The maintenance of existing structures, including for example the following structures. if the structures 0 No! oO Yes”
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type -
+ Boat ramps, boardwaiks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs,
(ii) Educational or research purposes relating to the fish habitat area O No CL) Yes
(it) Monitoring the impact of development on the declared fish habitat area LC No/( Yes
{iv) The construction or placement of structures, including for example, safety signs, swimming enclosures No} (L] Yes
and aids to navigation, if -
« The impact on the area is minor; and
+ The structures are constructed in compliance with all the requirements, under any Act, relating to a
structure of that type
(v) Public benefit works, inctuding, for example, the construction of runnels for mosquito control, the (No! Yes
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor
(a) if yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
C1 Yes - A permit for that aspect of the operational work is not required. Goto 04.14 {_] No - Goto)
(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 7, Part O2) This application requires assessment by the Depariment of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agenty.
O Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
CO Yes — Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse (0
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fishenes
(OPI&F) and assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.
No
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
Oo No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must retuse
to receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Indusines and
Fisheries (DPI&F) and, subject to the dectaration for the relevant wild river area, assessment for the purposes of the Wild Rivers
Act 2005. if DPIRF is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes - An application for the operational work will be taken to be not properly made and the assessment manager must refuse to
receive it.
Dy 7IPA, scluati: 8, part 2 table 4, tem 3; Fisheries
fe 4, ern 7, Wild Rivers Act 2005. sectons
IPA, setredt Batt I tesble Ait
Reguilition, suhedule 1, pit 3, ti
Reguiwwon 1995 sVi3A (seitassessabl: wodes}; 1P Regulation, sctmdue 2, tablis 2, tein 25, P
134; Fisheries Act, section /60C (isild river area).
Page 37
Page 19
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
4.14 |\s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19947
No -Gowo415 [1] Yes
Hf yes, is the proposed operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
(i) The removal, destruction or damage of dead marine wood on unallocated State land, other than ina : Ono 10 Yes
wild river area, for trade or commerce _
(ii) The maintenance of existing structures, including, for example, the following structures, ifthe ‘O No IC] Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a i
structure of that type —
« — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
+ — existing drainage structures;
« — existing powerlines or associated powerline infrastructure
(iii) For educational or research purposes or for the monitoring the impact of development on marine CINo |(1 Yes
plants
(iv) For the construction or placement of structures, including, for example, swimming enclosures, safety |[_] No /(] Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
* The extent of the removal, destruction or damage is minor; and
« The structures were constructed in compliance with all the requirements, under any Act, relating
to a structure of that type
(v) For the construction of runnels for mosquito control, removal of Lyngbya, seed collection for site CNo |11 Yes
rehabilitation or the collection of marine plants for fishing bait, or handicraft
(a) If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
| Yes -A permit for that aspect of the operational work is not required, Go to Q4.15 oO No - Goto (b)
(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part Oz) This application requires assessment by ihe Department of Primary Industries and Fisheries (DPI&F). if DPIXF is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
C1 Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
O Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary industries and Fisheries
(OPIRF) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If
DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
LI No
If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, if a
development permit is required, the permit is held or has been applied for?
C1 Yes - unless the application is consistent with any property development plan applying to the land, ihe Assessment Manager must refuse to
receive it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries
(OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO No - An apptication for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
sthudule 2, table 2, ten 28 1P
faration; Wil! Rivers Code.
IPA, schedule 8 part 1, iible 4, tem 8 IPA, schedule & part 2, table 4, tem 4, Fisheries Requiation 1005 ST13A (sellassessable codes}: IP Reguté
Requiation, schegue 1, part 3, table 4, ten 8, Fisheries Act 1994, section 76DB (wikt river area), Wild Rivers Act 2005, section AGA. refeveet wild rive
Page 38
Page 20
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 22
WILD RIVER AREA
4.15
Is ahy of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No-Gowat16 §=[JYes
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 LI No LJ Yes
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 (1 No (J Yes
if yes to either {i) or (ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not property made and the Assessment Manager must refuse to receive it.
(No
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
O Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it,
O No - Unies the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the
selevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
1A, schedule 8, part 1. table 4, tent 10 iF Reguidtion, schedule 2, table 2, tem 37, Wild Revers Act 2005, sections 42, 434.
STATE-CONTROLLED ROAD sx. apne cee ps ce ny gt
4.16 |\s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No -Endofsections ([] Yes
If yes, is the proposed operational work associated with either -
+ Amaterial change of use that is assessable under the planning scheme; or
Line (Yes
Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlied road
If no, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under
IPA, schedule @ - Answer (a) - (c) betow.
(a} Is any of the proposed operational work associated with access to a State-controlled road?
Oo No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
[No O Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo No - This application must be relerred to the Department of Main Roads (OMR} as Concurrence Agency.
oO Yes - This application must be referred to the DMR as Advice Agency.
Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controfled road?
LINo
Yes
Hf yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo)
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
LU Yes - this application must be referred to the DMR as Advice Agency.
eZ, tent 3
JP Regutateit, schedide 2. 13}
Page 33
Page 21
BUILDER TO VERIFY ALL DIMENSIONS & LEVELS
ON SITE PRIOR TO ORDERING OF MATERIALS &
COMMENCMENT OF CONSTRUCTION
BUILDER TO COMFIRM LOCATION OF SEWER LINE
BEFORE COMMENCMENT OF CONSTRUCTION
NOTE:
DEVELOPMENT MUST BE UNDERTAKEN
AND OPERATED IN A MANNER THAT CAUSES
NO DETRIMENTAL EFFECT UPON THE AMENITY
OF THE NEIGHBOURHOOD BY REASON OF THE
CREATION OF THE EXESSIVE NOISE,LIGHTING
NUISANCE OR OTHER EMISSIONS.
BOUNDARY LINE
} 11364
PROPOSED EXCATION 100MM DEEP
BEDDING LAID, 72MM SLAB W/STEEL
~——_—
|
]
|
l
|
—_-—H4
| NEW |
| CONSTRUCTION
| LEVELONE |
GROUND FLOOR __ |
1500
carport roof line
Stormwater drainage
to be diverted to kerb and
channel via 90 mm PVC
underground lines Trees.
Sewer Main
— Distance to the road
' SU
Site NSET Drive
1: 200
NOTES
RUCTIO
RP DETAILS REQUIREMENTS & RELEVANT AUSTRALIAN STANDARDS. NG COPE
LOT: 4
DIMENSIONS TAKE PREFERENCE OVER SCALE. DO NOT SCALE OFF
R.P. No: 128795 DRAWINGS.
PARISH: WEYBA
COUNTY: MARCH
AREA: 577 m2?
LOCAL AUTHORITY: NOOSA
ENSURE THE GROUND LEVEL FALLS AWAY FROM THE BUILDING LINE
FOR 1000mm PERIMETER OF THE BUILDING, WITH MIN FALL 1:10 TO
ALTERNATIVELY ENSURE ADEQUITE DRAINAGE MAX 1:1
Sear a era
REFER TO LOCAL AUTHORITYS BROCHURE TITLED "EROSION AND SEDIMENT CONTROL
ON RESIDENTIAL BUILDING SITES”. ALSO REFER TO LOCAL AUTHORITIES “BEST
PRACTICE GUIDELINES FOR THE CONTROL OF STORM WATER POLLUTION
FROM BUILDING SITES.”
REFERE TO CONSULTING ENGINEERS DRAWINGS FOR SLAB & FOOTING DETAILS &
SOIL REPORT.
i
BUILDER MUST CHECK ALL BOUNDARY LINES & PEGS BEFORE COMMENCEMENT OF ANY
BUILDING WORK. SHOULD SITE CONDITIONS DIFFER FROM THOSE INDICATED SEEK
INSTRUCTIONS FROM DESIGNER.
NOTE
They should not be encluded in tender documents.
Ne aS
ieee
Oop E>
E | wdg-amended
F |wdg-amended
preliminary dwg SP
preliminary dwg ySP
working dwg JSP
working dwg JSP
wdg-revision USP
-carport roof line
-window schedule
-electrical plan
D. | wdg-revision JSP
-removing existing
wall and pantry
-adding the I'dry on the
existing deck
setback, stormwater USP
drainage
demolition, floor, level JSP
electrical plans
confirming structure of
existing door that need
to be replaced
F |FINAL CONSTRUCTION
DWG
Hs
A,
23.03.09,
24.03.09,
25.03.09,
30.03.09,
01.04.09,
06.04.09.
14.05.09,
19,05.09,
25.05.09,
29.05.09,
PROJECT
FRANCIS RESIDENCE
CUENT
CRAIG FRANCIS
LOCATION
1 PAUL STREET NOOSA
TITLE
01-SITE PLAN
Coa
All loose furniture shown on the floor plans are indicative only.
Se eee ere
Page 22
i DEVELOPMENT FEES & CONTRIBUTIONS
puns hi n a C O a st (Cashier: Please Retum to Admin Officer, Development)
Payee Name:
Address:
Road / Drainage Plan Exam
Road / Drainage Field Inspection
Legal Document Examination
Sealing Fee - Survey Plans, Legal Documents
Sale of Documents, Policy Lists, Mise
Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Lot Calculation
={| Plan Examination Calculation
Developer Contribution = Landscaping
Developer Contribution - Road Other than PSP
Developer Contribution — Drainage Other than PSP
Beveloper ContibuionPahway Oferta PSP |__| 685 | inspection Calculation
Dene Canis ~ mun ore (PSPHSarpatng) [8
oS: Cannio eterewesie) | Catchment:
ce Public Transport
ICS - Sewerage (PSP Rural) Road/Section:
ICS - Sewerage (PSP Coastal)
ICS - Sewerage — South Peregian (PSP Maroochy) APPLICATION:DETAILS
ICS - Water Supply (PSP)
Payee Name: Are HETYPE LNTERWAT Ona c
Address: po Boy
(247 .
mA 2OCCHY DORE Ussé
ICS - Sport and Recreation Land (PSP Parks)
ICS - Drainage (PSP Noosaville Master & Ward Street)
ICS - Road (CMRNICP) If BA not entered then use 594
ICS - Pathway (PSP)
Development Location:
| Poo! . Yt MH
¢ TYPE;| File Numbers or Reference:
IF 2009.6 417:
Receipt Nor SA3S34 _ [Receiptbae TTO9
Total of Fees Paid (Excluding Bonds)
Security DepOST Paes laintnaseacompbied Works Bond
Total of Fees Paid (Including Bonds) $
PJLand Development/FEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc
Used in these records
09/0917 - Op Works - 2nd Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.