INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

4.9 | \s the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Supply (Safety No (J Yes
and Reliability) Act 2008

(ii) To increase the storage capacity of a referable dam by more than 10% Mio OD Yes

 

If yes to either or both of (i) or (ji) above - (Complete Form 1, Pant K:) This application requires assessment by the Department of Natural Resources and
Water (NRW), if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA schedule & pant 1, table 4, nem 4. 1P Requievon, schedule 2 teblz 2 dem 10.
TIDAL WORK; WILD RIVER AREA’
4,10 ||s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No -Go100411 1 Yes — Answer (a) and (b) below
(a)_|s any of the proposed tidal work prescribed tidal work?

 

 

 

 

 

Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
LINo
| If no, is the work proposed in a canal?
| CINo
| If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
| (No- (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensfand
| Transport (Maritime Safety Qid) as Concurrence Agency.
| oO Yes - (Complete Form 1, Part P), if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Safety Qld) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
| OJ Yes
\ If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
; oO No - (Complete Form 1, Part P}. This application must be referred to Queensland Transport (Maritime Salety Qid) as
' Concurrenice Agency.
| Oo Yes - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qtd) as
L Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.
DJ Yes

 

If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?

LJ No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
OYes

Hf yes, is the work proposed in a canal?
LI No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

O No - Unless the application is consistent-with any property development plan applying to the-Jand.-the Assessment.
Manager must refuse to receive it (Complete Fort 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005.

(0 Yes - untess the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensiand Transport (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.

0 Yes

if yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No ~ Unless the application is consistent with any property development plan applying to the land, the Assessment

{ Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensiand
Transport (Maritime Safety Qid) as Concurrence Agency. Subject to the deciaration for the relevant wild river
area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.

' Oo YeS - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safely Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
_____The application also requires assessment for the purposes of the Wild Rivers Act 2005.

 

 

 

 

 

 

_ O No - Go to the first question on the next page of this Checklist

 

 

Page 34

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0917 - Op Works - 2nd Driveway [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.