Council archive · source document
09/0917 - Op Works - 2nd Driveway [As Published] · 142009.917
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
S ECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
4A can proposed operational work assessable under any State planning regulatory provisions?
No
If no, is the proposed opgrational work assessable under the planning scheme?
LI No - Gow a42 Yes — Complete Form 1, Part E and answer 04.1.1 - 4.1.7 below
(Yes
Ifyes, is the proposed operational work assessable under the planning scheme?
0 No - Answer 04.1.1- 4.1.7 oO Yes - Complete Form 1, Part E and answer Q4.1.1 - 4.1.7 below
STATE-CONTROLLED ROAD .
4.1.1. | ls apy part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No
If no, is the proposed operational work for filing or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
or it exceed the threshold?
No O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
C1 Yes
if yes, is all of the proposed operational work associated with either -
+ Amaterial change of use that is assessable under the planning scheme; or (No [Yes
+ Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlled road
If no - Answer (a) - (¢} below
(a) Is any of the proposed operational work associated with access to a State-controlied road?
No Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
{b) Is any of the proposed operational work for filling or excavation?
CINo me
ILygs, is the operational work proposed in a future State-controlied road not defined by route?
No - This application must be relesred to the Department of Main Roads (DMR) as Concurrence Agency
O Yes - This application must be referred to DMR as Advice Agency.
es
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
throygh a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
[No (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
LI No- tis 4pplication must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
oO Yes - This application must be referred to DMR as Advice Agency.
iP Reguiation, schedule 2. table 3, tei 31P Requistion, schedute 2, table 2, item Ho).
ACID SULFATE SOILS Z
4.4.2 | Is any of the operational work proposed in a local government area listed*.' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
No -Gowads3 C)Yes
if yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
CINo (Yes
If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000ms of soil or sediment at or below 5m AHD CUNo (Yes
(ii) Filling the premises with 1,000m: or more of material with an average depth of 0.5m on LINo [1] Yes
land, soil or sediment at or below 5m AHD
Hf yes to either or both (i) o* (ii) above - This application must to be referred to the Departmen of Natural Resources and Water (NRW) as
< Advice Agency
++ «| P Regulation, schedule 2, rable 3, ites 4: State Planeny Policy 2:02: Planing and Maneging Development aivotving Acul Sulfate Soils, sectean 3 6.
“+ Aurukun, Bowen, Brisbane. Broadsound, Bundaberg, Burdekin, Burke, Bumelt, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook. Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay. Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton. Sarina, Thuringowa, Tiaro, Torres, Tewasville, Whitsunday
Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0917 - Op Works - 2nd Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.