Attachment C - Stmwater Man Plan · MCU15/0016
Attached to the e-mail MCU15/0016 Response to information request (updated).
Plans and drawings: the text below has words only, no drawings.
STREET ADDRESS: 75 RENE STREET NOOSAVILLE REAL PROPERTY DESCRIPTION: SP 244573 LOT 1 CLIENT NAME: lL & L KIPPEN Dive & | STORMWATER LAWFUL POINT OF DISCHARGE NOTE: DEPENDING ON GROUND CONDITIONS AND _ IF REACTIVE SOIL IS FOUND ALL PENETRATIONS, VERTICAL AND HORIZONTAL SHALL BE DRAWING SCHEDULE PROVIDED WITH SWIVEL JOINTS AND STORMWATER DRAINAGE PLAN QUALITY DETAILS EXPANSION JOINTS. ALL SUBSURFACE DRAINS 2999-1 COVER SHEET REQUIRE EXPANSION JOINTS AT 10m SPACING. _ 2999-2 2999-3 SW QUANTITY & 2999-4 SW QUALITY MAINTENANCE LUNCH AREA Bartlett st SEWER WITH EASEMENT OVER WATER WITH HYDRANT NOTE: CONSULTING ENGINEERS” FOR ALL ENGINEERING DETAILS OF ORIGINAL SUBDIVISION REFER TO REPORTS AND DRAWINGS PROVIDED BY ” BARLOW SHELLEY CONSULTING ENGINEERS” AND ALSO BY "MORGAN INTEGRATED WATER CYCLE MANAGEMENT NOTES: STORMWATER QUANTITY: STORMWATER QUALITY: refer: "deemed to comply solutions — stormwater quality management south east queensland” version 1.0, may 2010 by "healthy waterways” RETENTION REQUIRED DEEMED TO COMPLY SOLUTION Cl1 FLOOD MANAGEMENT: DEMAND REDUCTION: RAND ASTAR NOT REQUIRED WELS RATED FIXTURES Oe Site 3335 m? - Roof 1800 _m? Driveway 1155 m? LOCALITY MAP Landscape 580 m? EVAL! MAT . . 2 SCALE: NTS SITE PLAN & EXISITNG SERVICES New impervious 2955 m CATCHMENT AREAS DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED FOR ASSESSMENT, TENDERING AND CONSTRUCTION. LEGEND GENERAL NOTES WATER SUPPLY Amd Description Dote Ron Water 3 Diameter 1. DO NOT SCALE FROM THESE DRAWINGS. 1, PIPEWORK SHALL BE IN ACCORDANCE WITH AS4020, FOR EXAMPLE: ABS (ACRYLONITRITE STYTRENE), PP (POLY PROPYLENE), PE Existing Water tos. Cleanoat to surface 2. DO NOT RELY ON THESE DRAWINGS FOR ALIGNMENT AND LEVELS OF EXISTING INFRASTRUCTURE. (POLYETHYLENE) OR COPPER U.N.O. S Existing Sewer CJ Capped junction 3. ITIS THE OBLIGATION OF THE CONTRACTOR AND/OR PLUMBING CONTRACTOR TO SURVEY ALL EXISTING SERVICES PRIOR TO 2. WATER SUPPLY PIPEWORK SHALL BE @20 U.N.O. EXCEPTION: ONE FITTING ONLY MAY BE @15. MAX. LENGTH 3000 MM. HOT WATER PIPEWORK Existing Storm water cv Conrol valve CONSTRUCTION. SHALL BE LAGGED. HOT WATER RECIRCULATING LINES TO BE INSULATED WITH 20MM "ARMAFLEX" OR SIMILAR. HD Existing House drain cs Cleaners sink 4. THE PLUMBING CONTRACTOR IS OBLIGED TO OBTAIN REAL SIZE PRINT OUTS (A1 U.N.O.) FOR THE PREPERATION OF TENDER. ANY 3. PROVIDE TEMPERING VALVES ON HOT WATER TO PERSONAL HYGIENE FIXTURES. Sanitary Drainage cw Cold Water CLAIMS REFERED TO AS "DRAWING COPIES" NOT READABLE SHALL BE REFUSED. 4. UNDERGROUND COPPER PIPEWORK SHALL BE "KEMLAGGED" OR OTHERWISE PROTECTED. UNDERGROUND PIPEWORK NOT UNDER DAP Duct access panel —sw— Grey Water Bey Double check walve 5. ALL KITCHEN, LAUNDRY & BATHROOM FITTINGS AND TOILETS SHALL COMPLY WITH THE MINIMUM WELS WATER RATING LEVEL 4 CONCRETE SLAB MAY BE POLYPIPE CLASS PN20, ONE SIZE LARGER THAN SHOWN. TTT Een Eccentric Enlarger TAR (FORMER AAAA WATER CONSERVATION RATING AS PER AS/NZ6400). 5. EXPOSED PIPEWORK IN AMENITIES AREAS, SHALL BE CHROME PLATED. vent ripe arg S oO CONS O GAS S/ oo = Foe ater Elev Dge Evevated Drainage 6. PROVIDE FLOW RESTRICTOR VALVES TO TAPS AND SHOWER ROSES WHERE REQUIRED. 6. SUBMETERS SHALL COMPLY WITH APPROVED DEVICES. REFER LOCAL AUTHORITY REGULATIONS. SUBMETERS SHALL BE LOCATED IN Storm Water Drainage Fe False. ceiling 7. THE FLOW SHALL NOT EXCEED A MAXIMUM OF 9L/MIN. COMMON AREAS ONLY. _ eee Eire FH Fire Hydrant 8. WATER SUPPLY AND SANITARY DRAINAGE HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE Q'LD Agi Drain FHR Fire hose reel STANDARD SEWERAGE LAW, Q'LD STANDARD WATER SUPPLY LAW, THE NATIONAL PLUMBING, DRAINAGE CODE AS 3500, THE isoue Noles Date FFL Finished floor level Q'LAND DEVELOPMENT CODE QDC, THE FIRE HYDRANT CODE AS2419, ALL RELEVANT AUSTRALIAN STANDARDS, AND THE BACKFLOW PREVENTION X 50-05-15 Rain Water Ri oe Eodure units tor REQUIREMENTS OF THE LOCAL AUTHORITY. 1. PROVIDE HOSE CONNECTION VACUUM BREAKERS TO ALL HOSE COCKS PROVIDE RPZD TO ANY IRRIGATION CONNECTIONS, For Development Approval 0S ain Water Riser GP Gully pt 9. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND/OR HAZARD ZONES. For Building Approval Cold Water Riser GMH Gully Man Hole DRAWINGS, OTHER CONSULTANTS DRAWINGS, SPECIFICATIONS AND OTHER WRITTEN INSTRUCTIONS THAT MAY BE ISSUED 2. PROVIDE APPROVED BACK FLOW PREVENTION TO FIRE SERVICES, HYDRANT SUPPLY (TESTABLE SINGLE CHECK VALVE U.N.O.), For Tender Down Pipe gv Gate valve DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCIES SHALL BE REFERRED TO THE SUPERVISING OFFICER FOR ALL FIRE HOSE REELS WHICH MAY BE USED FOR OTHER THAN FIRE FIGHTING SHALL BE EQUIPPED WITH DOUBLE CHECK VALVES For Construction Stack HW Hot water tion branch DECISION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR'S SHALL VERIFY ALL FIXTURE LOCATIONS, INVERT LEVELS, (DCV) U.N.O. hs Constructed Vent Pipe HD House drain SURFACE LEVELS, AND COVER TO PIPES ARE CORRECT AND OBTAINABLE PRIOR TO COMMENCEMENT OF THE WORK. THE EXACT @) 3 HL High level LOCATION OF EXISTING, AND PROPOSED SERVICES, SHALL BE VERIFIED WITH THE RELEVANT AUTHORITY, OR OTHER TRADES AS @) ° Group Vent IC Inspection Chamber APPLICABLE. FIRE STOP COLLARS TO BE USED ON ALL PLASTIC PIPEWORK PENETRATING FIRE RESISTANT CONSTRUCTION. COVERS & FRAMES. Fduct Vent iL invert Level 1. COVERS SUBJECT TO VEHICULAR TRAFFIC TO BE 2535 CAST IRON, MEDIUM DUTY U.N.O. ®) ; io inspection opening 2. COVERS IN GRASSED OR CONC. AREAS TO BE 2535 CAST IRON, CONCRETE INFILL LIGHT DUTY. @® eae en ios Inspection Opening to Surface SANITARY DRAINAGE 3. COVERS IN PAVED AREAS TO BE 600 SQ. INFILL TO MATCH PAVING PATTERN. H d li eh ° ot Mater Niser Kec yore i Channel 1. UNDERGROUND PIPEWORK SHALL BE @100 PVC DWV, AND UPVC WHERE EXPOSED, MIN GRADE 1:60 U.N.O. 4. COVERS IN TILED AREAS TO BE AS FOR PAVED AREAS WITH BRASS EDGING. y raullec = yY. Fire Dropper NRV Nene urn valve 2. SUSPENDED PIPEWORK SHALL BE PVC CLASS DWV. 5. CONCRETE INFILL COVERS TO BE STAMPED "SWD" OR "SEW" AS APPROPRIATE. Fire Riser PB Path box 3. TRADE WASTE PIPEWORK TO GREASE TRAP SUSPENDED SHALL BE “COESPRENE" OR HDPE. \- PLV Pressure limiting valve 4. UNDERGROUND SHALL BE VITREOUS CLAY OR HDPE. . i ina MiEAust RPEQ No 7023 Vv Vane PO Planter outlet 5. TRADE WASTE PIPEWORK TO OIL SEPARATOR SHALL BE HDPE, OR VITREOUS CLAY WITH'NITRILE” RUBBER RINGS. GRATINGS . . contact: Reinhold Koenning Mitsus ° he Hose Cock Ree Real propery aoe, hn 6. CLEANOUTS OR INSPECTION OPENINGS BROUGHT TO SURFACE IN PAVED OR CONCRETE AREAS, OR WITHIN BUILDINGS TO HAVE 1. CeO SSO COROT NON ER TO BE "FASTON, GATIC" OR APPROVED EQUAL DUTY TO MATCH MANUFACTURERS RECOMMENDATIONS Moffat Beach, QLD, 4551 8 RPZD —_— Reduce P Sone devi BRASS CAPS, SEALED AND SCREWED. : email: [email protected] een Eccentric Enlarger RWO Rain water outlet one eevice 2. TRENCH GRATE TO BE TRANSVERSE BAR. PH: (07) 5491 4333 FX: (07) 5491 4233 RWH Rain water head 3. FLOOR WASTE GRATES TO BE CHROME PLATED BRASS : en Enlarger . . CLIENT : SD Sanitary Drainage STORMWATER DRAINAGE O ; et Saoce ‘evel 1. UNDERGROUND PIPEWORK SHALL BE 100 PVC CLASS SW MIN GRADE 1:100 U.N.O. | & L KIPPEN ORG Overflow Relief Gully s/t Safe Tray 2. DOWNPIPES SHALL BE 100 PVC CLASS SW, U.N.O ON HYDRAULIC PLANS. FIRE SERVICE Wat SwWD Storm water drain 3. RAINWATER OUTLETS (RWO) AND PLANTER OUTLETS (PO) SHALL BE "GATIC WADE" OR SIMILAR, WITH MEMBRANE CLAMPS WHERE 1, ALL HYDRANT PIPEWORK TO BE IN ACCORDANCE WITH AS2419-2005 CLAUSE 6.8. ARCHITECT : []o we Water td Tropped Tundish REQUIRED. 2. ALL HYDRANT PIPEWORK TO BE IDENTIFIED IN ACCORDANCE WITH AS1345. IAN GORTON DESIGN 1G Test gate 4. GULLY PITS SHALL BE CONCRETE BODY IN TRAFFICABLE AREAS AND POLY IN NON TRAFFICABLE AREAS U.N.O. 3. ALL HYDRANTS AND FIRE HOSE REELS SHALL HAVE A MINIMUM CLEARANCE (IN ALL DIRECTIONS) OF 100MM AROUND THE HANDWHEEL. y J sk Sink td Tundish et , 5. POLLUTION CONTROL MANAGEMENT PLAN (PCMP): 4. ALL HYDRANTS TO BE FITTED WITH THE VALVE OUTLET AT RIGHT ANGLES TO THE FACE OR WALL BEHIND IT. THE VAVLE OUTLET IS TO BE (PROJECT: 73 RENE STREET > ) rench grate transverse bar HORIZONTAL OR SLOPING AT A MAXIMUM OF 35 DEGREES BELOW HORIZONTAL. LT Laundry Tub TG(I) Trench grate longitudinal bar 5.1. TO BE RESPONSIBILITY OF BODY CORPORATE. NOOSAVILLE y TMV. Thermostatic. mbang. valve 52. TO LIST ALL IN FLOW FILTERING DEVICES LIKE LEAF EATERS AT DP’S AND OTHER FILTERS. 5. EXTERNAL FEED HYDRANTS SHALL BE POSITIONED WITHIN 20M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE AUTHORITY PUMP LIGHT INDUSTRIAL ol wm — Washing Vv Tempering valve 5.3. TO KEEP AND MAINTAIN A LOG OF CLEANING. APPLIANCE HAS ACCESS. acnine 4, I . : Mach u/g Underground 5.4. TO CLEAN DEVICES SUCH AS GUTTERS AND GULLY PITS 6. EXTERNAL HYDRANTS SHALL BE POSITIONED NOT LESS THAN 10M FROM THE BUILDING UNLESS PROTECTED BY A CONSTRUCITON HAVING DRAWING TITLE u/s Under slab ; “AS TO MANUFACTURES SPECIFICATION A FIRE RESISTANCE LEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST 2M EITHER SIDE OF THE HYDRANT OUTLET, AND WHICH EVER 8 FWG Floor Waste Gully u.n.o. Unless noted otherwise IS THE LESSER, 3M FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEIGHT OF THE BUILDING ; ws Water supply -MINIMUM QUARTERLY, BUT MONTHLY IN RAINY SEASON : : a Bn Basin “AFTER EACH MAJOR RAINFALL EVENT 7. FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE INSTALLED WITHIN 8M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE 5.5. TO INSPECT AND CLEAN TANKS MINIMUM ONCE YEARLY. AUTHORITY PUMP APPLIANCE HAS ACCESS. C_)} sth Bath Shr Shower 5.6. TO INSTALL AND MAINTAIN PUMP AND FIXTURES FOR REUSE/WATERING/IRRIGATION AS TO MANUFACTURES SPECIFICATION 8. MATERIALS: — <@100 ORE ConerR MOVE Soo uns IN GROUND. COVER SHEET SS mes ~ eee “210 FRGLTELG/ PE B COPPER SERS La = ME-—s Water Meter CS Cleaners Sk 9. DO NOT USE GALVANISED FOR UNDERGROUND PIPE WORK. Design | RK. | checked | Ch [Date 20—05—15 | Dwg. No. AMD. SCALE: 1 : 400 ON At UNo.| 1 of 4 2999-1 J RPD:— LOT 1 SP 244573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
/
sccusd
| l|
|
PROVIDE EVEN 1% GRADING (1:100) ALONG
ENTIRE GRIVEWAY AND DISCHARGE SHEET
FLOW TO TOP OF BIO RETENTION SYSTEM
EASEMENT
SL4.56 EMT A
1L3.250 7.569
—7— §
PANT OA
OES) NAS S00
rT Y FL5.050 — g 7 Me 36
PARKIN
vious paving BINS = /j \) A
ACCESS HATCH 937 ahT
REFER TO L3.35)
LUNCH AREA FFLS.1 10 11 12 13 14 15 17 18 19 20 MANUFACTURER \ 23 24
@ @
=>
eT
PROVIDE ON SITE STORAGE
pervious paving
YW
BICYCLE PARKING
i 3
QUOTE BAYS
CHECK LEVELS AND PROVIDE CHANGED LEVELS WITH
1% GRADING AT INVERT.
REMOVE PLANTS WHICH MAY NOT BE APPROPIATE.
COORDINATE PLANTS WITH LANDSCAPE ARCHITECT
AND PRINCIPAL ARCHITECT.
|
I
| /
EXISTING BIO RETENTION SYSTEM SUBJECT TO
/ REFURBISHMENT:
1. VEGETATION CAN BE RE-USED WHERE APPROPIATE.
CONFIRM WITH LANDSCAPE ARCHITECT.
2. REMOVE ALL 3 LAYERS AND EXPOSE SUBDRAINAGE
3. RE-ARRANGE SUBDRAINAGE AS PER DETAIL.
SLOTTED PIPES CAN BE RE-USED IF THEY ARE
FABRICATED SLOTS.
4. CONSTRUCT NEW OVERFLOW AND BYPASS CHAMBER
AND JOIN SUBDRAINAGE TO CHAMBER.
peopoet FEN MICATION. 514.528” 937 5. PROVIDE NEW SEALED WRAPPING SURROUND ALL
oO WALLS AS PER DETAIL.
T T T T T TH T SeLOW SEAR WH ane TANKS 6. PLACE NEW SLEEPER RETAINING WALLS WHERE
bin REQUIRED
EFFECTIVE STORAGE VOLUME 7. FILL LAYERS AS PER PLAN WITH NEW FILTER-,
OF TOTAL 14,000L TRANSITION— AND DRAINAGE MATERIALS.
nea TANK ASSEMBLEY bin 8. CONSTRUCT INFLOW PIPES AND OUTFLOW PIPES AS
. PER DETAILED DESIGN
TANK MANUFACTURER 9. CONSTRUCT SUFFICIENT ROCK FOREBAY FOR SCOUR
AUSTRALIANTANKS bin PROTECTION.
(www.australiantanks.com.au) /
PROVIDE APPROVED FLAP VALVE AND / /
min 2sqm ROCK FOREBAY FOR
%300 FROM ROOF DRAINAGE TO ——-T7 SCOUR PROTECTION AND VELOCITY
DISCHARGE ON TOP OF BIO _ (tpe00e0 CONCRETE SLAB WITH
RETENTION SYSTEM. FOR DETAILS Ss / EMBEDDED COARSE ROCKS OF
REFER TO BA DESIGN PLANS DIFFERENT SIZES CAN BE USED
of) J
-©- FFLS.100 Hore
L a L | 1 whe
—) l
7 MINIMUM FINISHED
“ FFLS.050 OFFICE RECEPTION SLAB LEVEL
6 uP
1 REQUIRED:
DISPLAY AREA
. ee FFL5.100
= 7
PARKING
Z
XISTING SWALE TO BE SUBJECT TO REFURBISHMENT.
PARKING
LUNCH AREA,
PARKING
BICYCLE PARKNG
FLOW (LITRES/SEC.)
60 —-—-— NO RETENTION
50 WITH RETENTION
7 ~
40
7 ~N
30
™N
7 eal nN |
9 T T T ! ! T
2 4 6 8 10 12 14 16 18
TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH PROPOSED MITIGATION TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
TOTAL PROPOSED TANK VOLUME:
TANK FOR RETENTION:
14,000 LITRES
NOTE: THE PEAK FLOW MITIGATION PROVIDED BY 16,000 LITRES RETENTION VOLUME
ON THE BIO RETENTION SYSTEM HAS NOT BEEN USED AS PART OF THE
CALCULATIONS.
RUNOFF & DETENTION CALCULATIONS:
SITE AREA:
NEW IMPERVIOUS AREA:
ROOF CATCHMENT TO TANK:
MAX INFLOW TO TANK AT DESIGN Q20:
MAXIMUM EVENT:
TIME OF CONCENTRATION:
INTENSITY:
PRE DEVELOPMENT PEAK RUNOFF:
PEAK RUNOFF POST DEVELOPMENT:
REDUCTION REQUIRED:
RETENTION VOLUME REQUIRED:
RETENTION VOLUME PROVIDED:
REDUCTION PROVIDED:
ACCESS
EASEMENT
FTP yp
CATCHMENT AREAS[sqm]:
SITE: 3335
ROOF: 1800
HARDSTAND: 1155
LANDSCAPING: 380
3335sqm
2872sqm
min900sqm
60L/sec
Q100
Smin
326mm/hr
266L/s
297L/s (NO RETENTION)
31L/sec
12,000 LITRE
14,000 LITRE
34L/s
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date
Issue Notes Date
For Development Approval] X 20-05-15
For Building Approval
For Tender
For Construction
IAs Constructed
pan
Hydraulic 3:
\-
CONTACT: Reinhold Koenning MiEAust RPEQ No 7023
Moffat Beach, QLD, 4551 AHSCA
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
| & L KIPPEN
ARCHITECT :
LL IAN GORTON DESIGN J
(PRosect: 73 RENE STREET Y
NOOSAVILLE
LIGHT INDUSTRIAL
DRAWING TITLE:
STORMWATER
DRAINAGE
PLAN
Design| RK. | checked | [Date 20—05-—15 | Dwg, No, AMD.
\ SCALE: 1: 200 on At uNo.| 2 of 4 2999-2 J
RPD:— LOT 1 SP 244573
Page 3
375 TO ON SITE-
RETENTION TANKS
AT 1L3.775
150 SUBDRAINAGE TO-
LAWFUL POINT OF
DISCHARGE AT IL3.360
500 FILTRATION LAYER:
SLEEPER RETAINING
}__200 EXTENDED DETENTION DEPTH
WALL OR
EQUIVALENT
4.45 4.410 4.450
—_ +"
SN
THE ENTIRE BRS TO BE WRAPPED
— IN A WATERPROOF LINER
100 TRANSITION LAYER
1.
2.
3.
4.
5.
200 DRAINAGE LAYER
(ALLOW FOR 60mm FALL IN DRAINAGE PIPES)
3.560
ee 3.360
BIO RETENTION SYSTEM (BRS)
CROSS SECTION
SECTION
SCALE NTS
BIO RETENTION SYSTEM LEVEL
SCHEDULE
EDGE OF SURROUND 4.450
WEIR LEVEL BYPASS 4.410
SURFACE LEVEL OF FILTER 4.160
INVERT LEVEL OF FILTER 3.660
TRANSITION LAYER 3.560
INVERT LEVEL OF DRAINAGE 3.360
INVERT LEVEL OF BYPASS 3.775
MAIN DESIGN PARAMETERS FOR BIO RETENTION SYSTEM:
MINIMUM REQUIRED FILTER SURFACE AREA: 65sqm
EXTENDED RETENTION DEPTH: 250mm
DEPTH OF FILTER LAYER: 5S00mm
DEPTH OF TRANSITION LAYER: 100mm
DEPTH OF SUB-—DRAINAGE LAYER: 200-—260mm
NEW HI-FLOW BYPASS CHAMBER DISCHARGING TO RETENTION TANKS
SET OVERFLOW WEIR LEVEL TO 4.410 AND DISCHARGE OVERFLOW DIRECTLY TO
RETENTION TANKS VIA 6375
9375 TO TANKS.
NOTE:
THE ENTIRE TRENCH OF THE BIO RETENTION
SYSTEM SHALL BE WRAPPED WITH AN. IMPERVIOUS:
Ft
2
65sqm BIO RETENTION VEGETATED TREATMENT: -
a
=
=
=
& rN. YN
300 FROM ROOF DRAINAGE.
DRIVEWAY /CARPARK
$375 FROM
BYPASS CHAMBER
DIRECTED TO EXISTING
STORMWATER MANHOLE, LAWFUL
POINT OF DISCHARGE.
ACCESS HATCH REFER
TO MANUFACTURER
SLEEPER RETAING WALL, WHERE
EEQUIRED
BIO RETENTION SYSTEM (BRS'
PLAN VIEW 1:100
ACCESS HATCH REFER
TO MANUFACTURER
DRAINAGE LAYER TOWARDS
cl
USING SCREW CAP.
USE 2+45deg BEND AT
INVERT.
DO NOT USE 90deg BEND!
PIPE IS PERMITTED! SLOTS
SONNECT TO #150
COLLECTOR PIPE, PVC, NO
SLOTS
USE 2e45deg BEND
00 NOT USE 90deg BEND!
TYPICAL #90 SLOTTED PVC WITH
a TO. SURFACE
NOTE:
ONLY PRE_FABRICATED SLOTTED
SLOTYTED PIPE AT 750 SPACING
sd LEAN
= PROVIDE” 1:200 GRADING OF
ay dé / 2 RA
J 2 CHAMBER,
2
“Oy ~
7) e PRODUCED BY HELP OF A
ee, e GRINDER CAN NOT BE
“On, 2 TOLERATED!
BIO RETENTION SYSTEM
4.450 4.450
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date
;
@225 sowmycanon
PIPE AT HIGH LEVEL
100 COMMUNICATION
PIPE AT LOW LEVEL
375 OVERFLOW FIXED
TO WALL WITH SS
BRACKETS
SLOW LEAK WITH #100
ORIFICE PLATE
$375 TO LAWFUL POINT - vee
OF DISCHARGE aes ‘
RETENTION TANK ASSEMBLEY DETAIL
SCALE: NTS
EXISTING 375 RCP
LAWFUL POINT OF DISCHARGE
Issue Notes Date
For Development Approval] X 20-05-15
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic 3:
\-
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
| & L KIPPEN
ARCHITECT :
iS IAN GORTON DESIGN
(PROJECT: 73 RENE STREET
NOOSAVILLE
LIGHT INDUSTRIAL
DRAWING TITLE:
A
STORMWATER
QUALITY & QUANTITY
DETAILS
Design| RK. | checked | Ch [Date 20-05-15 | Dwg, No. AMD,
SCALE : NTS on At uNo.| 3 of 4 2999-3 J
RPD:— LOT 1 SP 244573
Page 4
RECOMMENDATIONS FOR ESTABLISHMENT & OPERATION:
PHASE OF ESTABLISHMENT:
The first 2 Years after construction are crucial for the performance of the VBFS.
***Ensure the right plant selection (refer "Healthy Waterways" for plant selection)
**During dry periods provide sufficient watering
“Perform regular weed removal
****Replace not established plants where required
OPERATIONAL PHASE:
e Perform routine inspections of the raingarden (VBFS) to identify any areas of obvious increased sediment deposition, scouring from
storm flows, rill erosion of the batters from lateral inflows and clogging
Perform routine inspections of the inflow systems in particular the grated drain and clean the grated drain regular from debris and litter
Perform routine inspections of the surface of the raingarden and clean from litter and gross pollutants
Remove sediment build ups in the raingarden
Repair any damage from vehicle traffic
Provide regular irrigation/watering during extended dry periods
Remove any invasive weeds at any time
Remove plants that have died and replace them
Perform regular pruning as to Landscape Architects schedule to encourage growth and healthy establishment of plants
Perform vegetation pest minotoring and control as to Landscape Architects schedule
RECOMMENDATION:
THE RAINGARDEN IS PROPOSED TO BE A STORMWATER TREATMENT DEVICE AS OPPOSED TO A NORMAL GARDEN
BED. WE RECOMMEND TO SET UP A SIGN EXPLAINING THE PURPOSE OF THE RAINGARDEN.
WIDTH AS SPECIFIED IN PLAN VEGETATED BIO RETENTION SYSTEM LENGTH AS SPECIFIED INPLAN = WIDTH AS SPECIFIED IN PLAN
Use for mulching: LUCERN, WOODCHIP OR EQUIVALENT.
NOTES:
1. Use LUCERN OR EQUIVALENT for mulching
2. Do not use organic Soils or soil fractions
for filter layer.
3. Provide a suitable irragation system required
for the establishment of the plants and for
use in extended dry periods. Irragation
system shall be supplied from the
harvesting tanks.
4. Do not use any geotextile or related
products between filter and transition or
between transition and drainage layers.
5. Geotextiles may be used in addition to the
impermeable concrete & block surrounds.
6. Provide flush out points for subsurface
drainage.
FILTER LAYER:
Clay 2-4% (<0,002mm)
Silt 48% (0.002-0.05mm)
Very Fine Sand = -10%(0.05-0.15mm)
Fine Sand 10-25% (0.15-0.25mm)
Med./Coarse Sand 60-70% (0.25-1.0mm)
Coarse Sand 7-10%(1.0-2.0mm)
TRANSITION LAYER:
Coarse Sand 100% 0.5-2 mm
DRAINAGE LAYER
O, OC Fine Gravel 100% 2-5 mm
Connect subsoil
drainage to stormwater
infrastructure as
specified in plan.
Provide PVC perforated pipe with
diameter as specified in plan.
Minimum 2 off.
VEGETATED BIO FILTER STRIP SOIL SPECIFICATION
(NOT TO SCALE)
NOTES:
1. Provide selected plants as to specification of
"Healthy Waterways” http://www.healthywaterways.org/
2. Provide "FOREBAY’ made of rocks and pebbles. For
scour protection. Refer detailed design for area.
MAINTENANCE PLAN
WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FOR SOUTH EAST
QUEENSLAND (Chapter 5, Item 5.6).
The maintenance of the bioretention basin elements involve:
e — Routine inspection of the bioretention basin profile to identify any areas of obvious increased sediment
deposition, scouring from storm flows, rill erosion of the batters from lateral inflows, damage to the profile
from vehicles and clogging of the bioretention basin (evident of "boggy" filter media surface).
e Routine inspection of inflows systems, overflow pits and under-drains to identify and clean any areas of
scour, litter build up and blockages.
e Removal of sediment where it is smothering the bioretention basin vegetation.
e Where a sediment forebay is adopted, removal of accumulated sediment.
Repairing any damage to the profile resulting from scour, rill erosions or vehicle damage by replacement of
appropriate fill (to match onsite soils) and revegetating.
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
Removal and management of invasive weeds (herbicides should not be used).
Removal of plants that have died and replacement with plants of equivilant size and species as detailed in
the plant schedule.
Pruning to remove dead or diseased vegetation material and to stimulate growth.
Vegetation pest monitoring and control.
Refer "Water by design" by HEALTHY WATERWAYS.
BIO RETENTION
BASIN
THIS BIO RETENTION BASIN REDUCES THE POLLUTION
OF OUR WATERWAYS BY REDUCING THE AMOUNT OF
HEAVY METALS, LITTER, SUSPENDED SOLIDS AND
NUTRIENTS DISCHARGED TO THE
PUMICESTONE PASSAGE.
EDUCATIONAL SIGNAGE LAYOUT
1800m? q Sig
ROOF
BIORETENTION FILTER & RAINGARDEN MAINTENANCE CHECKLIST
BODY . :
CORPORATE NAME: DATE:
RESPONSIBILITY CENTRE . .
MANAGEMENT NAME: DATE:
OWNER NAME: DATE:
PROVIDE NAME AND DETAILS OF
MONTHLY CONSULTANT IF APPOINTED:
INSPECTION QUARTER
FREQUENCY 6—MONTHLY
DROUGHT
AFTER EVENT
INSPECTION ITEMS YES __|No ACTION REQUIRED
Overall appearance healthy?
Overall appearance clean?
Gross litter _on surface?
Sediment accumulation at inlet?
Sediment accumulation on pebble surface?
Sediment accumulation at pipe outlets?
Sediment accumulation in bypass chamber?
Erosion at forebay?
Erosion at overflow?
Any other erosion?
Damage of support structure?
Any other traffic damage present?
Damage to grates and lids?
Visual plant health ok?
Weeds apparent? Weeding required?
Watering required?
Irrigation functional?
Replanting required?
Mowing/slashing/pruning required?
Surface clogging visible?
Excess ponding evident?
Flushing required?
Point of discharge inspected (pit/headwall/swale/creek)?
OTHER
OBSERVATIONS
SIGNATURE & DATE:
1155m? 5
ee
DRIVEWAY
BIO RETENTION SYSTEM
RETENTION TANK
TREATMENT TRAIN
RECEIVING WATERWAYS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date
Issue Notes Date
For Development Approval] X 20-05-15
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic ::
\-
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
contact: Reinhold Koenning MiEAust RPEQ No 7023
CLIENT :
| & L KIPPEN
ARCHITECT :
LL IAN GORTON DESIGN J
(PRoJect: 73 RENE STREET >
NOOSAVILLE
LIGHT INDUSTRIAL
DRAWING TITLE:
STORMWATER
QUALITY
MAINTENANCE
AND SPECIFICATIONS
Design] RH. checked] hb [Date | 20-05-15 | Dwg. No. ‘AMD.
SCALE : N/A on at u.no.] 4 of 4 2999-4 J
RPD:— LOT 1 SP 244573
Used in these records
Attachment C - Stmwater Man Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.