Skip to the record
For the highest quality transcripts.

Council archive · source document

2017-05-04_Request for Extension to Relevant Period_REV A · 152006.1999

Attached to the e-mail Request for Extension to Relevant Period 152006.1999.01.

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  DEOs                                                            Comments
            efficient delivery and functioning of the
            infrastructure. Bulk water supply infrastructure is
            protected from encroachment from sensitive uses.

DIVISION 15 OVERALL OUTCOMES FOR TEWANTIN AND DOONAN LOCALITY
 Overall Outcomes                                              Comments
 12.7.1 The overall outcomes are the purpose of the Tewantin & Doonan Locality Code.
 12.7.2 The overall outcomes sought for the Tewantin & Doonan Locality are the following—
 a) New uses and works are located, designed and managed       a) Complies. The development has been located, designed
 to—                                                           and managed:-
         i)    be compatible with other uses and works;             i)        To be compatible with other uses and works
         ii) maintain the safety of people and works;                         through appropriate design layout including
         iii) avoid significant adverse impacts on the                        road network design compatible with adjacent
               amenity enjoyed by users of other premises                     and surrounding uses;
               including acoustic and visual qualities; and         ii)       To appropriately cater for the safety of people
         iv) avoid significant adverse effects on the natural                 and works and is consistent with current
               environment, including native habitat removal,                 standards including bushfire management (refer
               fragmentation and attrition;                                   conditions 57 to 62), flooding requirements
                                                                              (refer conditions 68 to 73);
                                                                    iii)      To ensure no adverse impacts on amenity of
                                                                              adjoining or surrounding premises as vegetation
                                                                              buffers will be retained which will maintain
                                                                              visual qualities. It is noted that proposed
                                                                              allotments adjoining Walter Hay Drive will be
                                                                              provided with acoustic attenuation through
                                                                              mounding and landscaping treatments.
                                                                              Reference is made to conditions 9 to 13 of the
                                                                              development approval in respect to acoustic
                                                                              requirements.
                                                                    iv)       Vegetation clearing is limited to ensure no
                                                                              significant impacts on the natural environment.
                                                                              Development has been designed around already
                                                                              disturbed/ cleared areas on the site.
 b) Development is consistent with the Priority                b) An Adopted Infrastructure Charges Notice has been issued
 Infrastructure Plan in Part 15.                               for the site. Therefore, relevant contributions towards
                                                               applicable trunk networks within the locality will be provide
                                                               contributions towards priority infrastructure networks.
 c) Urban development is limited to land within the Urban      c) The site is situated on the edge of the Urban Growth
 Growth Boundary as shown on Map ZM9;                          Boundary and is considered to be an appropriate extension of
                                                               existing urban and rural residential
 d) The Tewantin & Doonan Locality retains its primary role    d) The development primary role will be for providing
 of providing housing for permanent residents;                 housing for permanent residents.
 e) Tewantin is a vibrant riverside and lakeside urban area    e) The proposed development is for rural residential
 with a traditional town character and identity within a       development in close proximity to the township of Tewantin
 vegetated, waterfront setting;                                and is compatible with adjacent and surrounding land uses.
 f) Within the town of Tewantin the distinct character of      f) Not applicable. The site is not located within the town of
 existing residential neighbourhoods is retained, and          Tewantin.
 housing offers high levels of residential amenity,
 convenience, accessibility and servicing, while maintaining
 the low density and low scale synonymous with the local
 character;
 g) & h)                                                       Not Applicable
 j) Rural settlement, at varying densities consistent with the j) The proposed development for rural residential lots has
 environmental constraints of the area, offer high levels of   been designed to achieve appropriate density consistent with
 amenity and moderate to high levels of convenience,           the environmental constraints on the site. The development



JFP Ref: M1775 REV. A                                                                                                  Page 7

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-05-04_Request for Extension to Relevant Period_REV A.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.