NOOSA COUNCIL IDAS Development Application Decision Notice                                                  5 of 10


25.    All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
       paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
       prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
26.    Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
       storage 3000 litres per attached dwelling) that is installed to ensure water from the tank is used for
       external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
       swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All
       rainwater tanks are to be designed and installed in accordance with the Queensland Development Code
       (QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
       building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted
       for Building Works and Operational Works approval and any overflow shall be directed to the road
       frontage in Belmore Terrace.

27.    All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
       collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
       drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage
       system in Belmore Terrace. Plans of the drainage design shall be prepared by a Registered Professional
       Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works.
       The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
       system at any one location is 25 litres/second and the outlet points shall be located within the
       prolongation of the side boundary lines of the subject site.

28.    All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
29.    The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
       accordance with Council’s standards and requirements at no cost to Council.

30.    The existing sewer main that is located in the adjoining property at the rear of the site and the ‘zone of
       influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the
       finished surface level) shall be accurately located and determined by a licensed Surveyor and shown on
       all plans submitted for Operational Works approval.
     To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
     damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
     exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within
     1.5m of the centreline of the sewer main, whichever is the greater. As such the applicant shall amend
     Operational Works plans including Building plans to ensure compliance.
Town Water Supply
31.    The site shall be connected to Council’s existing town water supply and be constructed in accordance with
       Council’s standards and requirements at no cost to Council.

32.    Each individual water connection to the water reticulation system shall extend to the property boundary
       and be metered. All fees for the supply of water meters shall be paid to the Council.

33.    All water meters must be located outside the property boundary and in an easily assessable location to
       facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
       fences or locked gates. In this regard approval of the water meter configuration and location must be
       obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
       hydraulic drawings.
Earthworks
      Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
      Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
      or the blockage of, or interference with, any natural watercourses.
34.    Earthworks carried out on site shall not affect the structural integrity of any of the existing fences and/or
       structures and/or lands that border the development site. Fences that are affected shall be replaced prior
       to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced
       shall be clearly shown on the plans submitted for Operational Works approval.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@58034f92\@[email protected]

Used in these records

About this file

File size
50 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002357.001 [As Published].pdf · 50 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.