NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 10
25. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
26. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 3000 litres per attached dwelling) that is installed to ensure water from the tank is used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All
rainwater tanks are to be designed and installed in accordance with the Queensland Development Code
(QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted
for Building Works and Operational Works approval and any overflow shall be directed to the road
frontage in Belmore Terrace.
27. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage
system in Belmore Terrace. Plans of the drainage design shall be prepared by a Registered Professional
Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
system at any one location is 25 litres/second and the outlet points shall be located within the
prolongation of the side boundary lines of the subject site.
28. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
29. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
30. The existing sewer main that is located in the adjoining property at the rear of the site and the ‘zone of
influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the
finished surface level) shall be accurately located and determined by a licensed Surveyor and shown on
all plans submitted for Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within
1.5m of the centreline of the sewer main, whichever is the greater. As such the applicant shall amend
Operational Works plans including Building plans to ensure compliance.
Town Water Supply
31. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
32. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
33. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
Earthworks
Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural watercourses.
34. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences and/or
structures and/or lands that border the development site. Fences that are affected shall be replaced prior
to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced
shall be clearly shown on the plans submitted for Operational Works approval.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@58034f92\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002357.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 50 KB (small file)
- File type
No other editions are linked here.