Original source · versioned page text
2020-10-15 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 15 OCTOBER 2020
6 51901.3614.01, 51901.3786.02, 51992.479.01, 51994.1249.01, 51994.1048.01 &
MCU13/0081.01 – MINOR CHANGE TO MULTIPLE DEVELOPMENT APPROVALS FOR
47 MULTIPLE DWELLINGS, ENTERTAINMENT & DINING - TYPE 1 FOOD & BEVERAGE
AND RETAIL BUSINESS - TYPE 1 LOCAL AND TYPE 2 SHOP & SALON – 71 HASTINGS
STREET, NOOSA HEADS
The following material was presented to the meeting in relation to this item:
Cr Stockwell – refer to Attachment 5
Manager Development Assessment – refer to Attachment 6
Motion
Moved: Cr Jurisevic
Seconded: Cr Stewart
That Council note the report by the Development Planner to the General Committee Meeting
dated 12 October 2020 regarding Application No. 51901.3614.01, 51901.3786.02,
51992.479.01, 51994.1249.01, 51994.1048.01 & MCU13/0081.01 to make a minor change
to existing approvals for a mixed use development commonly known as Netanya and situated
at 71 Hastings Street, Noosa Heads and:
A. Approve the change.
B. Include the following additional conditions on 51901.3614.01, 51901.3786.02,
51992.479.01, 51994.1249.01, 51994.1048.01 and MCU13/0081.01:
Additional conditions – 15 October 2020
Approved Plans
1. Development authorised by this approval must be undertaken generally in
accordance with the Approved Plans. The approved plans are listed in the
following table and may be amended by these conditions and annotations on the
plans.
Plan No. Rev Plan Name – Prepared by Date
19021 E Cover Sheet, prepared by Sprout Architects 5/08/2020
SD00.00
19021 E Locality & Register, prepared by Sprout Architects 5/08/2020
SD00.01
19021 E New Works - First Floor Site Plan, prepared by Sprout 5/08/2020
SD10.01 Architects
19021 E New Works - Second Floor Site Plan, prepared by Sprout 5/08/2020
SD10.02 Architects
19021 E New Works - Third Floor Site Plan, prepared by Sprout 5/08/2020
SD10.03 Architects
19021 E New Works – Fourth Floor Site Plan, prepared by Sprout 5/08/2020
SD10.04 Architects
19021 I New Works – Ground Floor, prepared by Sprout 6/10/2020
SD20.00 Architects
19021 E New Works – First Floor, prepared by Sprout Architects 5/08/2020
SD20.01
19021 E New Works – Second Floor, prepared by Sprout 5/08/2020
SD20.02 Architects
19021 E New Works – Third Floor, prepared by Sprout Architects 5/08/2020
SD20.03
19021 E New Works – Roof Terrace, prepared by Sprout Architects 5/08/2020
SD20.04 As annotated by Council
19021 E New Works – Elevations, prepared by Sprout Architects 5/08/2020
SD30.00
19021 E New Works – Elevations, prepared by Sprout Architects 5/08/2020
Page 13 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.