IDAS Assessment Checklist, Version 21.3, 9 May 2008

a INTEGRATED PLANNING ACT 1997
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER

AREA
ls any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?

4.2
No -Gowat3 [] Yes

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999

43
applies?
IX] No -Gowast [_] Yes

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2}, (3) or (5)), or from a dam constructed on a watercourse or lake?

BX No -Gowa4s [7] Yes - Answer (a) and (0) below

44

Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or

45
interfering with artesian water (other than using a water truck to pump water)?
4 No Goto 04.6 Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency

{s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking

46
overland flow water (other than using a water truck to pump water)?
BX] No -Gotoas7 [[] Yes - Answer (a) and (b) below
ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or

47
interfering with subartesian water (other than using a water truck to pump water)?

[XJ No -Gowass [[] Yes

Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for

4.8
interfering with overland flow water (vther than using a water truck to pump water)?
BX] No -Gowoas9 [_] Yes - Answer both (a) and (b) below

ls the proposed operational work for the following?
D Yes

49
For the construction of a referable dam as defined under the Water Act 2000 [ No
(& No OO Yes

(i)
To increase the storage capacity of a referable dam by more than 10%

(ii)
If yes to either or both (i) or (it) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as

Concurrence Agency.

TIDAL WORK; WILD RIVER AREA
Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?

4.10
[BX] No -Gotwoasi1 ([] Yes - Answer (a) and (b) below

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1689 - Operational Works - Signage [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.