Skip to the record
Accept no substitutions.

Council archive · source document

08/1689 - Operational Works - Signage [As Published] · 142008.1689

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

we

~

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

Form 1 Development Application

 

Part E

Building &/or operational works assessable
against a planning scheme

 

 

 

(Nature of the works ee ae sj
1. Nature of work that requires assessment against a planning scheme:
LJ Building work - Complete Table A X] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?

([] Roadworks (J Stormwater (_] Water infrastructure (J Sewerage infrastructure
[] Landscaping () Earthworks L] Drainage Works IX] Signage
[] Clearing vegetation under the planning scheme ([] Other - Specify below

(ii) What type of approval is being sought? (wOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

DX] Development Permit [J Preliminary approval ([] Both (specify betow)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?

{XjNo  (_] Yes - Specify the number of lots being created

{iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
a lot)

[J No  &X] Yes - Complete Table B(a)

 

Table B(a) List of approval references ~* Date approved Date approval lapses (if known)

 

1 2006/1594 - Reconfiguring a Lot (5 Lots) 28-Nov-2007

 

2 2007/1273 - Material Change of Use (Showroom and 24-Aug-2008
Commercial Business
3 2007/1264 - Material Change of Use (Commercial 06-Feb-2008
Business)
4 2007/1841 - Materiai Change of Use (Industrial Type 1 13-May-2008
& 2 and Education Type 3)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour} |$ 75000

 

Mandatory Information Cm eee oe : 7 “]

3. Confirm that the following mandatory information accompanies this application TS
¥

nfirmatjod-of4 .

en deernent a, Pig bf Igement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the i .

extent of any cut and fil) Gonfirper : pverrthe Stat

 

 

 

 

 

 

 

 

 

 

[oy : |
OFFICE USE ONLY 26 SEP 2008 “|
eA_SoRL
Date Received Reference Numbers Aa Front Counter so 7 |

 

 

 

 

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1689 - Operational Works - Signage [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.