07/1842 - MCU - Detached House [As Published] · 132007.1842
Nterenw we Checklist - Applications Involving Land
Development & Land Use Sections
ia
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1. APPLICATION FORMS , - se 7 ~F 7 at
1.1. Form1 PartA
1.1.1. Ensure that the form is fully completed. “|
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 _ If the owner of the iand is a company, either ACN No. or Company Seal required.
1.2. Form‘ Part B-O Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [4]
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. v
2. REFERRAL INFORMATION ~ PO
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. Zhe
3. T ENVIRONMENTALLY RELEVANT ACTIVITIES ©0000 0 TL CATA las
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct appfication
fee is paid and recorded on the application.
‘4. | FORM 2-REQUEST TO CHANGE APPROVAL ~ ee ee as a
4.4 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. PLANS ,- a are a.
wi ee ela
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
cme oe
6.: “SUPPORTING INFORMATION — een ce ee an
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering fetter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
7. “FEE "° Sn andin es Sek ee mea
7.1. Ensure that the application fee, as $ determined from the Council s adopted scale of fees, Y
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. “
Sm a mam eatery, were moa came ame me moe nae maamegy ate ae
Receiving Officer ..... P> essen
Having completed this form and accepted the appfication, please deliver both to the following [DAS Application Receiving
trays:-
* Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.
« Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
¢ Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
¢ —tnalt other circumstances — AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
rE Si U2 a fy,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 28 pages
Page 2
Part A, Version 2.4, 29 May 2006
The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 1. Street address: fncludinghouse number, street name, suburb/ocality name & postcode) (if applicable)
Alltand the subject of the application, must be .
identified. However, a description ofthe land is not | 436 La Ke. Flot Road . Roreew i ‘ Q LA “SES
required in relation to a mobile or temporary 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Environmentally Relevant Activity (ERA). ry
Advice for completing Q2 - Q2 applies if hoes} RPS ORO
development is proposed within a water body or b — si -
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be P i
@ for coms ri . land can ~~
identified by a lot on plan description, These details | lot ] on R.P PS2 C20 |
be obtai tle d ts oF through Ce
Iowal pana mn file documents or hrough he | 4 The above description is for: (tick applicable box)
However, if the land on which the development is i) the land on which the development is proposed; or
proposed does not have a tot on plan description (ie. p
the develooment is proposed in a water body or ~ Ci (ii) the land adjoining the water body or watercourse, within which the development is
watercourse} provide — proposed; or
i iption for th fe
0 pe ean ariba aiid ° D (ii) the water body or watercourse.
ii) GPS coordinates where there i
" adiciningadiacent Tan (eg. In Moreton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (nm? or ha):
Advice for compteting Q? - Q7 does not apply if the
development is within a water body or watercourse. | } LL | 2 3, & hae
Advice for completing Q8 - 08 applies if q . ie gj . a
developments within a local government area, 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
Note: Areas below high water mark af pat within a [ Fa rich of NOOSE, |
government's area untess provid under T
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if i . 5 oy re -
Geveloomantis on stelegic pot land ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port land tidal area, For mare details refer to Guide 11 [
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
If there is insufficient room available, details may be
provided in an atiachment to the appleation. L ke Ef. C4 ne
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
Pp
ponds with @ total area of 7 ha for which wastes are released into waters etc).
[_ svhgle le steukjee Awellyy
t
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
Part A must always be accompanied by other [
completed parts of Form 1. Far information about
when a part of Form 1 may apply refer to Guide 4.
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identify who is making the apptication. The
applicant need at be the owner of the tand. c § eek if ws | ele el
When signing and lodging this application 14. Contact number: 16. Facsimile number/e-mait address:
The applicant is responsible for ensuring the _
information provided is correct. The assessment | 0? 326 g 2 JO 9 |
Tanages, any referral agency & the Chief Executive .
{where applicable) wil rely on this information when | 17. Postal address:
assessing and deciding the apptication. ~
the applicant is a company - a contact person | S4& David Ave j2QId ow QL 4045 |
‘must be shown. 18. Signature: 19. Date:
( FALOF
Joka / | #222
4
LX
/
Page 3
a
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes that an 7
application must contain, or be supported by, the Name Signature Date
written consent of the land owners, if the application
involves:
(i) amaterial change of use;
(i) reconfiguration of alot,
{ii) work on land below high-water mark & nat within a
canal as defined under the Coastal Protection and
Management Act 1995;0°
(iv) work on rail corridor !and defined under the
Transport Infrastructure Act 1994.
Section 3.8.1(2)(a) of tha IPA provides that
landowner’s consent is not required for a mobile or
temporary ERA .
For more information refer to Guide 1.
lepedreante.. LF AA.
(sen)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Saction 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entiterent be given for applications that
involve a prescribed State resource. [XINNO - go to 024 (YES - goto 022
Section 3.2. t(10)(a){ii) of the IPA prescribes that an . tye . .
application ativan oe to be aropety made 22. This application is accompanied by evidence: (tick applicable box)
without evidence of the resource entitlement, C1 (i) of the allocation of, or entitlement to, the resource — attach evidence and go to 023(vi)
Advice for completin: & 22 >
Refer to scheduta 10 of the /ntegrated Planning C (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence i i: i i f, or entitl rce -
rotuired by the Slaten support ofthe lodging ofthis development is consistent with an allocation of, or entitlement to, the resource - go
development application. lo
CI (i) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go fo 23
Advice for completing Q23 23. Evidence of the resource entitlement:
The information in {i) - (v) is mandatory if evidence is
required under 022 (i) or (i) above, (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the _ applicable)
application involves any water of riverine quarry (ii) Name of delegated officer
material under the Water Act 2000.
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 {vi) must be iil iti
completed the evidences tne tiie. (iii) Position of — officer
(iv) Signature of delegated officer
(vy) Date
(vi) pen date of evidence t —
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
Decent oo ab olte Parmoake 2 YES (CI NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
An application should be accompanied dy detaits to . qi
support the proposal & enable the assessment Plan / Drawing / Report Number Title
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope ofthe proposal J Pomme pr represen cescncccccccccecseseccc css
and any potential impact.
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (epplicable to assessment manager's) a
DATE RECEIVING OFFICER'S , REFERENCE
Free) «=p SO | RECENED l (a TED, NAMEIS fs Aree a4 | RUBBERS lo hh Syr|
Notification of Engagement of Private Certifier (Optional forma,
To Council, | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement| / / Accreditation Number. __ Name:. Signature:
Page 4
INTEGRATED PLANNING ACT 1997
AN Form 1 Development Application
Material change of use
assessable against a local government’s planning scheme
Part D, Version 2.0, 4 October 2004
i
<<
Qu.
Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local govemments planning scheme.
Nature of the application
A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.
1.
This application is for: (tick 1 or both if applicable)
Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme (2.
consideration of the proposal concept)
AND/OR
{R) Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of “gross floor area” go to Lot ~ YU x i
the planning scheme against which the [L i an RO RSLOLO t Pon3 o\ Noose 1 Co ah a\
application will be assessed. U t J
3. Existing gross floor area: {if applicable) [ \ q U Sa modcte ]
y
4. Are there any existing easements on the land?
NO
(1 YES ~ attach plans of the location and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
[ Vv acanrkt \and To Sv ania cei pertiod Bure Mia inan |
UY we)
6. Number of employees: | |
7. Operating days and hours: L. |
Associated building works details (if |§ Site cover: |
applicable) ‘ ,
area” and “storey” go to the planning scheme .
jainst which th ication will b \ .
aaessed, © appication wave 10. Number of on-site car parking spaces: Wl
11. Number of storeys / maximum height above natural ground:
12, Numberotempbyess «= [SYN
43. Hours and days the use will operate —[ SiC |
Associated operational works details | 14. Details of associated operational works (eg, landscaping, cut and fil, drainage, road works etc.)
{if applicable)
[
LJ
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED
REFERENCE
NUMBERIS
Page 5
INTEGRATED PLANNING ACT 1997 Part J, Version 4.1, 4 September 2006
Form 1 Development Application
a . Z [=
Clearing native vegetation <
Completion of all applicable questions on Part J is mandatory for all applications involving assessment against the Vegetation Management Act 1999
(VMA) for the clearing of vegetation.
Part J does not apply to vegetation clearing assessable against a Council's planning scheme or local law. Where the clearing is assessable against the
planning scheme, Part E of the form applies.
For further information about vegetation clearing under the VMA refer to Guide 12 Vegetation clearing made assessable under schedule 8 of the IPA.
Nature of application 1. This application is for: (tick applicable box) -
Operational work: clearing of nativa vegetation is (J (a) operational work for the clearing of vegetation where the clearing is made assessable
regulated under the VMA. under Schedule 8 of the IPA - complete 02, 3, 4, 5&6
Schedule 8 of the IPA makes the Gearing of
patie which the VMA applies assessable (b) a material change of use if - complete Q7 only
However, the clearing of native vegetation in (i) the tot contains -
cerlain circumstances is exempt development . WN 0} Fe
water Schedule Bcf the IPA. a, a category 1, 2 or 3 area shown on a property map of assessable vegetation; or
Exempt development includes, for example, b. if there isno property map of assessable vegetation for the lot - remnant
clearing to the extent necessary to build a single vegetation; and
id lot and jated mn oe : .
bulging of stu, Tae cain a oe ese (ii) the existing use is a rural or environmental use; and
has been approved under the IPA and clearing that {iii) the size of the land is 2 hectares or larger.
is for essential management or routine
management as defined In Schedule 10 of the IPA,
iguration of a lot if ~ complete Q7
Matera change of uso (MCU) an NCU (J (c) reconfiguration of a lot if - complete Q7 only
application that meats the referral triggers in Q1(b) (i) the lot contains -
Oe oe ene a. acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
Reconfiguration of a fot (Rat): a Ral that meets b. ifthere is no property map of assessable vegetation for the lot - remnant
the referral triggers in Q1{c) must be referred to vegetation; and
NRMW for concurrence assessment, using this. a . wos
form. (ii) the size of the lot before the reconfiguration is 2 hectares or larger; and
(iii) 2 or more lots are created; and
(iv) the size of any lot created is 25 hectares or smaller.
Type of clearing 2. The type of vegetation clearing (ie. clearing for a “relevant purpose’) proposed by this application is: (tick
2 and 3 onty apply ifthe application is for applicable box/es) -
STE et foes ora ot vegetation as Ci) under a project declared to be a significant project under the State Development and
Public Works Organisation Act 1971, section 26;
CI (ii) necessary to controt non-native plants and declared pests;
(C1 iii) to ensure public safety;
Di (iv) for establishing a necessary fence, firebreak, road or other built infrastructure, if there is
no suitable altemative site for the fence, firebreak, road or infrastructure;
Lv) as the natural and ordinary consequence of other assessable development for which a
development approval as defined under the integrated Planning Act 1997 (IPA) was
given, or a development application as defined under the IPA was made before 16 May
2003;
LD Wi) for fodder harvesting;
OO (vii) ‘for thinning;
C1 (viii) for clearing of encroachment;
CA (ix) for an extractive industry;
(J (x) for clearing regrowth on leases issued under the Land Act 1994 for agriculture and
grazing purposes.
Page 6
INTEGRATED PLANNING ACT 1997 Type of clearing (cor) Q3 only applies if the application is far operational work for the clearing of vegetation as identified in Qiifa} above. Section 22A(1} af the VMA provides that, if a vegetation clearing application is not for a relevant purpose the application is taken not to be a property made application and the assessment manager must refuse to receive the application. An appfication is for a relevant purpose if the chief executive of NRMW is satisfied the proposed Gearing ts a relevant purpose. Refevant purposes are prescribed under saction 22A(2) of the VMA_ Advice for compteting Q3 Confirmation from the chief executive NRMW or delegate that the application is for a refevant purpose is required for at vegetation clearing applications. ‘Submissions seeking confirmation from the chief executive NRMW or delegate must include information that demonstrates how the proposed Clearing is for a relevant purpose. Submissions are accepted at all NRMW Service Centres and will be forwarded fo the nearest Vegetation Services office. Part J, Version 4.1, 4 September 2006 . Is this application accompanied by confirmation that the chief executive of NRMW is satisfied the vegetation clearing application is for the relevant purpose/s identified in question 2? OyYes [L1No Confirmation is provided by either: (tick applicable box): DA letter of confirmation from the chief executive of NRMW, or delegate, is attached to this application; OR (1 The applicant requests that the chief executive of NRMW or delegate, considers whether the vegetation clearing application is for the relevant purpose identified in question 2 and completes the section below: Name of Delegated Officer Position of Delegated Officer Signature of Delegated Officer Date / / Note: If confirmation is not provided, this application is not a properly made application. Property vegetation management pian (PVMP) A property vegetation management plan (PVMP) ‘Must accompany all vegetation clearing applications and must contain aif the information Wentified in Q5 & 6. The PVMP Is to refer to the vegetation identified In Q1 above. The PVMP may also include any ather Information the applicant considers will assist in the assessment of the application. For an application for operational work, the relevant code is the regional vegetation management code applying to the area of the application. Its a not a requirement for a PVMP to be provided with an MCU and/or RaL application that is referred to NRMW for the assessment of clearing. ls a PVMP attached to this application? Oyes oO NO — a PVMP must accompany ail applications for vegetation clearing . The PVMP accompanying this application addresses the following matters: (tick if applicable) (11(i) ‘the location and extent of the area proposed to be cleared — compiete 06; C1 (ii) the purpose of the clearing; (1 (iii) details of the way the proposed clearing meets the performance requirements of the relevant code or policy for the area. . The location and extent of the area proposed to be cleared in this application is shown by - (a) amap showing - C1(i)_ the boundary of the area on an image base; and (i) five (5) or more points visible in the image base that correspond to identifiable fixed features; and U1 fil) the Map Grid of Australia 1994 coordinates and zone references for each point, acquired by GPS or similar system of satellites that receives and processes information; and Ci (iv) a description of the feature that each point represents; OR [J (b) a description of the boundary of the area by reference to Map Grid of Australia 1994 coordinates and zone references for the area.
Page 7
INTEGRATED PLANNING ACT 1997
Part J, Version 4.1, 4 September 2006
Clearing as a result of aMCU or Rat |7. Confirm by ticking the applicable box(es), that the following details are provided in plans and
Q7 only appfes to MCU and Ral applications. written information supporting the application:
This information is required for al MCU and Ral. Ki . os .
applications. A (i) Details of how the application meets the performance requirements of the NRMW
For a MCU application the relevant poficy is the concurrence agency policy for Material Change of Use (MCU) and/or the NRMW
rece assessing materal change of use concurrence agency policy for Reconfiguration of a Lot (RaL).
Far a Ral. application the relevant poficy is the oh The location and extent of:
NRMW policy for assessing reconfiguration of a lot
applications, = allinfrastructure associated with the development, including proposed building
Note: Clearing as part of and as a consequence of
the MCU/Ral. incudes:
{2) Gearing of assessable vegetation that will be -
approved or authorised by the MCU/Ral. -
approval,
(b) additional clearing under exemptions that would
apply as a result of the approval; and
{c) clearing that will be necessary to accommodate
the proposed use and development of the
premises,
Where clearing of remnant vegetation is not
envelopes and underground or above ground services;
all proposed allotment boundaries;
all proposed roads, easements, vehicle and pedestrian access and parking;
any proposed clearing or consequential clearing that will result from the development
including firebreaks and fire management lines, excavations and stockpiling of soil and
Clearing that will be necessary in order maintain the infrastructure proposed, following
its construction.
identified in the application, any future clearing of Please note: A copy of the original MCU and/or Ra application and Acknowledgement Notice
a rermart vegetation will require a separate must be provided when referred to NRMW.
wal,
PLEASE NOTE: PART J of Form 4 cannot be accepted by the assessment manager unless accompanied by PART A. The assessment manager may refuse to accept
an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1,
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED
REFERENCE
NUMBER/S
Page 8
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 20, 2 April 2007
Form 1 Development Application
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the "Referrals Checklist”. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the focal Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.),
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
Therefore, the completion of afl questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.
Section 2 is mandatory only if the proposed development Is located in any part of a witd river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application will rely on the information provided in this checklist (as wel! as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2.
9. — Toassist you in answering the following questions a series of guides are avaitable free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.
11, Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
PNOOPE
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4. JAI) an environmentally relevant activity (ERA) for which a code for environmental compliance
the apntoaton mate ecessment by fe at, has not been made - complete Part G of Form 1
administering authority’, C1 (i) a mobile or temporary ERA for which a code of environmental compliance has not been
{fan entity, other than the administering Made - complete Part G of Form
authority, is the assessment manager for the oO (iii) none of the above
application, the administering authonity is a
concurrence agency for the application in relation
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water
Act 2000 is required.
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable fo assessment manager)
DATE RECEIVED |__ REFERENCE NUMBER'S |
1 The assessment manager is responsible for assessing and deciding an IDAS application, The assessment manager for an application is prescribed in schedule 8A ol the IPA.
2. For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 9
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: (tick appficable bowes)
For more information refer to Guide 3. a . .
Unless you “pone ofthe above" to 02, Ai) devetopment on land contiguous? to a State controlled road and for
the application triggers referral io the Department (a) material change of use assessable against the planning scheme;
of Main Roads (OMR) as a referral sgenny. | )} reconfiguring a lot unless -
In certain circumstances DMR will be an advice . . .
agency, while in other circumstances DMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 oe P Renulabion wi assist you b Oo operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)-
associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
O (ii) development on tand net contiguous to a State-controlled road and -
C1 (a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
LO (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (¢) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
« assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
C1 (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12, (i) material change of use -
! ed“ * to 03, . .
Pe don ratte saesamertty Be. % (a) assessable against the planning scheme;
Department of Natural Resources and Water ining -—
(NRW), (b) on a lot containing
ff an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation;
iotemater for the application in relation (c) where the existing use of the land is a rural or environmental use; and
Ifyou ticked 034) oF (i), your application requires (d)_ where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of Oo {ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. -
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
C1 (ili) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
Ci (iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
If you ticked (i) - the relevant Port Authority is the
assessment manager for the apptication.
Wf you ticked (i) Queensland Transport is a
concurrence agency for the application.
CD () development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part / of Form 1
( (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part! of Form 1
[ALGi none of the above
4 Land contiguous to a State-controlted road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controtied road; or that is part of a future State-
controlled road.
Page 2
Page 10
INTEGRATED PLANNING ACT 1997 Acid sulfate soils For more information refer to Guide 10. Unless you answered “none of the above” to Q5, the application requires assessment by Department of Natural Resources and Water (NRW). if an agency other than NRW is the assessment manager for the application, NRW is an advice agency for the application in relation to this matter. IDAS Assessment Checklist, Version 20, 2 April 2007 The application involves development on land situated in an identified® local government area and where the surface of the tand is: (tick applicable box) (i) below 20m AHD® and the development will involve the excavation of 1000m3or more of soil or sediment at or below 5m AHD, or CD (ii) at or below 5m AHD and the development will involve filling the site with 1000m® or more of material $M (ii) none of the above Major hazard facilities or possible major hazard facitities For more information refer to Guide 17. tf you answered "YES" to Q6, the application requires assessment by the Department of Emergency Services (DES). If an agency other than DES is the assessment manager for the application, DES is a concurrence agency for the application in relation to this matter. Water related development under the Water Act 2000 For more information about items (a) -(f}, refer to Guide 15, For more information about item (g), refer to Guide 14 Does my application involve assessment of a referable dam? Unless you answered “none of the above" to Q7, the application requires assessment by the Department of Naturat Resources and Water (NRW). ff an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in relation to this matter. Removal of quarry material from a 8. watercourse For more information refer to Guide 16, Hf you answered "YES" to Q8, the application requires assessment by the Department of Natural Resources and Water (NRW), If an agency other than NRW is the assessment manager for the application, NRW Is a concurrence agency for the application in Telation to this matter. Note: Part G of Form 1 is required to be completed as the activity of removing quarry material from a watercourse is also an Environmentally Relevant Activity (ERA). Does the application involve a material change of use for a major hazard facility or possible major hazard facility as defined under the Dangerous Goods Safety Management Act 2001? 4 NO [YES - complete Part L of Form 1 The application involves: (1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is: (tick applicable box/es) CJ (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or dam) - complete Part Ke, Ks, Ka, Ks, or Ko of Form 1 whichever is applicable; (b) for an artesian bore anywhere in the State, no matter what the use - complete Part Ky of Form 1, (J (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered by a water resource plan, for use for purposes other than stock and/or domestic use - complete Part Ky of Form 1; C1 (a) for a subartesian bore, in certain declared subartesian areas, for use for stock and/or domestic purposes - complete Part K: of Form 7; Ce) for taking overland flow water in certain areas covered by a water resource plan - complete Part Ke of Form 7; Of for interfering with overland flow water in a drainage and embankment area - complete Part Kioof Form 1 (J (9) for constructing a referable damé or works that will increase the storage capacity of a referable dam by more than 10% - complete Part Ks of Form 1; OF Siti none of the above. Does the application involve development for the removal of quarry material from a watercourse? requiring an allocation notice under the Water Act 2000? INO [YES - complete Parts Ky and G of Form 1 5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Surdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, ‘sis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday. Australian Height Datum (AHD). Referable dam is defined under the Water Act 2000. Watercourse is defined in sch 10 of the IPA. wane The declared ground water areas are listed in Guide 13 Development in a declared catchment area, Page 3
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or }9. The application involves operational work that iS: ( tick the applicable box/es)
work in coastal management district C1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For + - ‘
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, oF
hae seed nae ctte sae'oc8 (ij) tidal work that is prescribed tidal work" other than in a canal"? complete Part P of Form 1; or
te: appcatn requires somnoeal y te , Diiii) carried out w waitin 13 oa ree district under the Coastal Act and for - complete
tran ae hepatic San ise assessment Ow constructing or insaling works n a watercourse between MHWS, and HAT (ie '
ene re sen tobe assessable againat the Water Ac 2000;
Local goverment is the assessment manager (1b) constructing a canal’? intended to be connected to tidal waters,
for all prescribed tidal work.
rapes (1 (©) _ constructing an artificial waterway;
(1 (d)_ reclaiming tand under tidal water,
(J (e) disposing of dredge spoil or other solid waste material in tidal water;
( ( _ interfering with quarry material on State coastal land above high-water mark;
(21 (a) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
{JJ (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
Qa liv) none of the above.
Operational work below high water | 10. The application involves operational work that is: (tick the applicable box/es)
mark : . . CO (i) tidal work'3 as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For . . A 9
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, Of
ne goverment ae areas mn vole 1 Gi) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
Inless you answered “none of the above" to se . wae + be
ato, ihn application triggers referral to CO (ii) carried out within a coastal management district's under the Coastal Act and for -
Queensland Transport (QT) (Maritime Safety i ‘i i i jal in ti _
(ld) as a concurrence agency. Oa wisposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager ‘
for all prescribed tidal work. (1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
(1 (©) constructing a canal'2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
PE (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. C(i) a material change of use assessable under a planning scheme involving operational
Or i apatect toqures aseesonent y the work carried out completely or partly in a coastal management district's
Environmental Protection Agency (EPA). C1 (ii) a material change of use assessable under a planning scheme involving building
Hf an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
f ication, EPA is . . .
conaene agency fare appican in « the construction of a new premises with a GFA'S of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?
Ui (iii)_ reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
Li (iv) reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'2 - complete Part M of Form 1
& (v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11. Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a loca! government tidal area.
12 Canal means canal as defined under the Coasta! Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidat work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
416 GFA is defined in sch 14 of tha [PA to mean the gross floor area. For a definition of how to calculated GFA, go to the pianning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
Page 12
INTEGRATED PLANNING ACT 1997 Development within the limits of a port For more information refer to Guide 18. For information about prescribed tidal work refer to Guide 24. If you answered “YES” to Q12, the application triggers referral to the Port Authority. The Port Authority is a concurrence agency if the development is - within 200m of a shipping channel or an entry and exit shipping corridor for the port ¢ within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage or spoil grounds; © within 1000m of a planned port facility identified in a land use plan approved under the Transport Infrastructure Act 1994. tn all other situation the Port Authority is an advice agency. IDAS Assessment Checklist, Version 20, 2 April 2007 Does the application involve development below high water mark’? and within the timits of a port under the Transport infrastructure Act 1994? bjno (DYES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work Marinas For more information refer to Guide 18. For information about whether a marina is prescribed tidal work refer to Guide 24. The tocal government is the assessment manager for all prescribed tidal work. Hf you answered “YES" to 013, the application triggers referral to Queenstand Fire and Rescue Service as an advice agency. 13. Does the application involve operational work that is tidal work for a marina’ with more than 6 vessel berths? Tino (71 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work Tidal works in strategic port land tidal areas For more information refer to Guide 18. Unless you answered “NO” to Q14, the relevant Port Authority is the assessment manager for the apptication and the Environmental Protection Agency (EPA) and Queenstand Transport (QT) are concurrence agencies for the application. Heritage For further information refer to Guide 19. If you answered "YES" to Q15, the application triggers referral to the Queensland Heritage Council as concurrence agency for the application. Unless you answered “none of the above" to Q15(b), the application involves referral to the Environmental Protection Agency as an advice agency for the application 15. 4. Does the application involve tidal works within a strategic port land tidal area2°? (No (11 YES - complete Part M of Form 1 Does the application involve development in a heritage registered place as defined under the Queensiland Heritage Act 1992? ano (11 YES - complete Part C of Form 1 15(b)The application involves: (tick applicable boxes) (1 (i) amaterial change of use assessable against the planning scheme and the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; CI (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; none of the above. “pi Declared catchment areas For more information, including a list of the declared catchment areas within Queensland, refer to Guide 13. Unless you answered “none of the above" to Q16, the application requires assessment by the Department of Natural Resources and Water (NRW). If an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in relation to this matter. 16. The application is in an area declared to be a catchment area under the Water Act 2000 and involves: (tick the applicable box/es) Oi) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares; (1 (ii) development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994, none of the above 7) 1 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. 19 Marina is defined in the Transporl Operations (Maritime Polfution) Regulation 1995. 20. Strategic port land tida! areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page5
Page 13
INTEGRATED PLANNING ACT 1997
Contaminated tand
Applications involving material change of use
and/ or reconfiguring a tot may trigger this
referral.
For more information refer to Guide 5.
Untess you answered “none of the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
telation to this matter.
17.
{DAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es)
CA (i): reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(0) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
Ci (ii) a material change of use —
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexptoded ordnance -
complete Part N of Form 1
ii none of the above
Electricity infrastructure
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above” to
Q18, the application triggers referral to the
agency to which the easement is qranted in
favour of as advice agency.
18.
The application involves: (tick the applicable box/es)
(1 (i) reconfiguring a lot where any part of the lot is -
« subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
« any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
¢ any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site,
Kw none of the above.
Diii
Oi)
Ow
Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
(P Requiation.
If you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
if an agency ather than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
‘Bano
LC yYes
Page 6
Page 14
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Requiation.
Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).
Fisheries matters
For more information refer to schedule 2of the IP
Requlation.
Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(OPIaF).
If an agency other than DPI8F is the assessment
manager far the application, OPI&F is a
concurrence agency for the application in
relation to items (i) - (iv) and an advice agency
in relation to item (v).
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
C1 (i) a material change of use of premises —
(a) ina Major Development Area in the Urban Footprint for -
© (i) anurban activity -
(1s inan area included in a structure plan where the IPA, section 3.1.6
applies;
C_sinanarea not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
impact assessment is required under the relevant planning scheme
C0 (ii) intensive animal husbandry, or
(J (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
(1 (i) anurban activity and not specified in section 2.4(2); or
C2 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for —
01 (i) anurban activity and not specified in section 2.10(2);
OD (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
C (iii) intensive animal husbandry
(ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
fa (iii) none of the above
21. The application involves: {tick the applicable box/es)
(C1 (i)_ an assessable material change of use for aquaculture - complete Part 01 of Form 1,
(1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
(ili) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
O tw)
Ow
assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
Rw
development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
none of the above.
Page?
Page 15
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation.
Uniess you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.
22.
The application involves: (lick the applicable box/es)—
(1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
U1 (ii) reconfiguring a lot—
(D(a) onland that is completely or partly within a public transport corridor, and the
total number of lots increases;
(1b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
(J (c)__ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1 @) _ for aresidential purpose within the 25 ANEF contour for an airport,
((e) _ for a residential purpose resulting in 100 or more allotments.
D (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a tot mentioned in (ii)
above, on land that—
(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(1 (b) will result in work that encroaches into an airport's operational airspace.
Yl {iv) none of the above.
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the 1P Requiation.
Unless you answered "none of the above”, the
application triggers referral to QT as a
concurrence agency.
23.
The application involves: (tick the applicable box/es)—
(i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
CO (ii) reconfiguring a lot—
(J (a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
((c) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(O(a) onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
Ce) onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(0 (f) for aresidential purpose resulting in 100 or more allotments.
C1 (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—
(D(a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
CO (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
g2l (iv) none of the above.
Moonie to Brisbane pipeline
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above’, the
application triggers referrat to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice.
24.
The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
Oi (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
LU (ii) reconfiguring a fot
CO (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a fot, and the
work is located wholly or partly in the easement.
FA) none of the above.
Page 8
Page 16
INTEGRATED PLANNING ACT 1997 Koala habitat area For more information, refer to Guide 26 and schedule 2 of the IP Requlation. Unless you answered "none of the above”, the application requires referral to the Environmental Protection Agency as a concurence agency. IDAS Assessment Checklist, Version 20, 2 April 2007 25. The application involves: (tick the applicable box/es)— () (i) a material change of use of premises in a koala conservation area or koala sustainability area made assessable under a planning scheme, that is not for a domestic activity and will result in - (1 (a) clearing of native vegetation over an area greater than 2500m?, (1 () anew building and any reasonably associated structure with a total footprint greater than 1000m2, LJ (c) an extension to an existing building and any reasonably associated structure if the extension has a total footprint greater than 1000m?; (1d) extracting gravel, rock or sand from an area greater than 5000m?, LJ (e) excavating or filling an area greater than 5000m?, (1 () additional traffic in a koala conservation area or koala sustainability area, between 6p.m. on a day and 6a.m. on the following day. O (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will result in - (a) an increased number of lots; C0 (b) clearing of native vegetation over an area greater than 2500m?. LO (it) operational work in a koala conservation area or koala sustainability area made assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with reconfiguring @ lot mentioned in (ii) above) that will result in the clearing of native vegetation over an area greater than 2500m2. C (v) operational work in a koala conservation area or koala sustainability area made assessable under a planning scheme (not associated with a material change of use mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity and will result in - (1 (a) clearing of native vegetation over an area greater than 2500m2, (1 (b) extracting gravel, rock or sand from an area greater than 5000m?; C1 (e) excavating or filling an area greater than 5000m?. Wild river area For more information, refer to Guide 27 (f you answered YES to Q26, you must also complete section 2 of this checklist. This will enable you to determine if your application can proceed in a wild river area and which referral agency will assess your apptication against the Wild Rivers Code, or if the proposed development is “prohibited” in a wild river area. Note: Development can be ‘prohibited’ in a wild fiver area because the application cannot be accepted by the assessment manager. 1 (v) none of the above. 26. Does the application involve development in a wild river area declared under the Wild Rivers Act 2005? LINO (DD Yes Preliminary Approval if you answered YES to Q27, the application triggers referral to the Department of Local Govemment, Planning, Sport and Recreation as an advice agency. 27. Does the application involve a development for which preliminary approval is sought under Section 3.1.6 of the integrated Planning Act 1997? no Cyes Wetlands Domestic activity means the construction or use of a single residence on a lot and any reasonably associated building or structure. Examples of a building or structure that could be reasonably associated with a single residence include: caretaker's residence, granny flat, building or structure used for a home business. Note: Wetland is defined in the Integrated Planning Regulation 1998. Unless you answered “none of the above" to Q28, the application involves referral to the Environmental Protection Agency as an advice agency for the application. 28. The application involves: (tick the applicable boxes) - (i) a material change of use, other than for a domestic activity, assessable against the planning scheme that is in or within 100m of a wetland; Ui ii) reconfiguring a lot - In or within 100m of a wetland that will result in LJ (a) more than 10 lots being created; or (J (b) lots less than 5 hectares; aw none of the above Page 9
Page 17
INTEGRATED PLANNING ACT 1997
DAS Assessment Checklist, Version 20, 2 Aprit 2007
Conservation Estate
Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes".
Unless you answered "none of the above" to
Q29, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
29. The application involves: (tick the applicable box’es}—
(i) a material change of use for urban purposes that is in or within 100m of any of the
following -
(C1 (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(1 (b) a State forest or timber reserve under the Forestry Act 1959;
(J (c) amarine park under the Marine Parks Act 2004;
{1 (d) a recreation area under the Recreation Area Management Act 1988;
(J (e) a world heritage area listed under the World Heritage Convention;
LJ (Brisbane forest park under the Brisbane Forest Park Act 1977.
O (ii) reconfiguring a lot if -
(a) any part of the lotis situated in, or within 100m of, any of the following -
(J (i) aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
LJ (ii) a State forest or timber reserve under the Forestry Act 1959;
(iii) a marine park under the Marine Parks Act 2004;
Oi (iv) arecreation area under the Recreation Area Management Act 1988;
(L(y) aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
[J (b) ‘the reconfiguration involves more than 10 lots being created, or any lot
; resulting from the reconfiguring is less than 5ha;
Rain none of the above.
Page 10
Page 18
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
SECTION 2 - ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)
Wild River Area
Itthe responsibility of the applicant to
determine if the development is proposed In
a wild river area,
Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nrw.gid.gov.au or
contacting the department by email on:
wild [email protected]
Note on Referrals
Referrals for development in a wild river area
(other than for agricultural activities and animai
husbandry activitles) are not changed from the
existing referral arangements.
Notes on development assessable
against the Wild Rivers Code
For information regarding development in a wild
river area, see the relevant wild river declaraton
and Guide 27, The retevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wid river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.
Applications for some new developments will nat
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area {PA}, must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river deciaration.
1.
Which wild river area is the development proposed in?
Lane (hooboe Borel Hoot?
The proposed development is to be located in: (tick the applicable bowes)
[1)) ahigh preservation area (HPA);
ii) a preservation area (PA) ;
Citi) a wild river floodplain management area (FMA);
Oo iv) a wild river nominated waterway;
(J v) a designated urban area (DUA).
Environmentally relevant activities
(ERAs) in a designated urban area
lfyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
temaining questions in Section 2.
If you answered NO to Q2, please complete the
remaining questions in Section 2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
pe NO (7) YES (ensure you have completed Part G of Form 1)
Clearing native vegetation
if YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.
if YES and you ticked Q4 box i} the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted.
Note: ff clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
\s the application operational work for clearing native vegetation in a HPA?
O NO O YES (ensure you have completed Part J of Form 1)
If YES, is the clearing?
1 i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
‘Bx ii) in a HPA outside a registered area of agriculture?
Page 14
Page 19
INTEGRATED PLANNING ACT 1997 Works in tidal areas, coastal management districts and fish habitat areas If you answered YES to Q5, and ticked any boxes in Q6), your application is required to be assessed against and must comply with the Wild Rivers Code. If you answered YES to Q5 and ticked box i) in Q6, your application is required to be referred to the EPA. Note: If specified works are proposed in a local government area, it is prescribed tidal work - the relevant local government will be the assessment manager with the EPA as a concurrence agency Hfyou answered YES to 05, and ticked box ii) or ii) in Q6, your application requires referral to OPIF. Hyou answered NO to Q5 and ticked box i} in Q6, the application will not be accepted. If you answered NO to Q5, ticked box ii) in Q6 and the development is necessary to install authorised works or infrastructure where a development permit is not required, or if a tequired permit is held, the application must be assessed against and must comply with the Wild Rivers Code. Applications for purposes other than specified works or as described above will not be accepted. lf you answered NO at Q6 and ticked box ifi) in Q6, the application may be made if the works are ina PA. These applications must be assessed against and must comply with the Wild Rivers Code. The application will not be accepted if the development is proposed to be located in a HPA. For more information about specified works refer to Guide 27 Residential, commercial or industrial development lf you answered YES to Q7, your application is not subject to wild river requirements. Provided there are no other aspects of this development that require assessment against the relevant wild fiver declaration or Wild Rivers Code, you do not need to complete the remaining questions in Section 2. \f you answered NO to Q? and ticked either box i) or ii) in Q8, the assessing agency is the relevant local government. The apptication must be assessed against and must comply with the Wild Rivers Code. 5. 6. 7. IDAS Assessment Checklist, Version 20, 2 April 2007 Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- Development in a wild river area} NO (yes The application is for one or more of the following: (J i) Operational works that is tidal works or works in a coastal management district (ensure you have completed Part M and/or Part P of Form 1); oF oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have completed Part O2 of Form 1); OF (1 it) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1). ‘s the application for residential, commercial or industrial development in a designated urban area? Kves LINno If NO, does the application for residential, commercial or industria development involve: (C1 i) a material change of use made assessable in a local government planning scheme (ensure you have completed Part D of Form 1); or LJ ii) operational works associated with reconfiguring a lot (ensure you have completed Part F of Form 1). Animal husbandry activities If you answered YES to Q9 your application requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Note: Applications for animal husbandry activities will not be accepted if proposed in a HPA. For more details and a definition of animal husbandry activities see the Wild Rivers Act 2005 and refer to Guide 27. Does the application involve a material change of use for animal husbandry activities (as defined under the Wild Rivers Act 2005) in a PA? 5s NO [1 YES (ensure you have completed Part R of Form 1} Agricultural activities Ifyou answered YES to Q10, your application requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Note: Applications for agricultural activities will not be accepted if proposed in a HPA. For more details and a definition of agricultural activities see the Wild Rivers Act 2005 and refer to Guide 2. The production of fodder in a PA, and pasture improvement using low impact soil disturbance techniques is not an agricuttural activity as defined under the Wild Rivers Act 2005. For more information see Guide 27. 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in a PA? Dino If YES is the application for: (J i) a material change of use; or Lo ii) operational works. Oo YES (ensure you have completed Part Q of Form 1) Page 12
Page 20
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.
Hf you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 iii) your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
12.
13.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
NO (J YES {ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
J i) assessable works
(7 ii self-assessable works
(iii) exempt works
Works that interfere with overland
flow water
The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.
if you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
If you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW.
against the relevant part of the Wild Rivers Code
and must comply with the code.
if you ticked Q15 iii) your application is not
subject to wild river requirements.
Applications for devetopment that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works 16.
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
{fyou answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
14.
Nino
15.
Does the application involve works that interfere with overland flow water in a FMA?
oO YES (ensure you have completed Part Kto of Form 1)
If YES, is the application for works stated in the relevant wild rivers declaration to be?
1 i) assessable works
LD) ii) self-assessable works
(J iii) exempt works
Does the application involve building or raising waterway barrier works in a PA?
(ky NO Oo YES (ensure you have completed Part O3 of Form 1)
Aquaculture (non ERA) 17.
Applications for aquaculture in a HPA will not be
accepted.
if you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
fyYlno (11 YES (ensure you have completed Part Os of Form 1)
Works that interfere with waterina | 18.
watercourse
Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not | 49,
be accepted.
Ina PA, applications for instream dams and
weirs may be accepted in nominated waterways.
if you ticked box ii) in Q19, your application will
not be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
Mare information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www, new.gid.aov.au or contacting the
department by email on:
[email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
0 1 YES (ensure you have completed the relevant Part K of Form 1)
If YES,
(Ji) The application is for an instream dam or weir; or
(J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 13
Page 21
INTEGRATED PLANNING ACT 1997
Environmentally retevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of
some ERAS is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)
lf you answered NO to 20 you do not need to
complete Qs 21-24.
lf you answered YES to 20 and the
development is in a PA, your application must be
assessed by the administering authority?*
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.
Ifyou answered NO to 021, you do not need to
complete Q22. If you answered YES to Q21 you
are required to complete Q22.
H you answered NO to 022, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,
if you answered NO to Q23 and the development)
is proposed in the HPA the application will not be
accepted, If you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
if you answered YES to 24 the application will
fot be accepted. If you answered NO to 024,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
Hf the development is proposed in a designated
urban area there may be no wild river
requirements, See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAS in a
designated urban area).
(DAS Assessment Checklist, Version 20, 2 April 2007
20. Does the application involve an ERA?
[Ano {_] YES (ensure you have completed Part G of Fort)
ls the application for an ERA 20 instream?
Ql NO Oyes
22. Is a quarry allocation notice held for the proposed ERA 20 instream?
‘Kno Clyes
23. Does the application involve any of the following in a HPA?
i) alevel 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
Wl NO (yes
Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— not low impact; and
— not for a residential complex in the area, or for specified works.
Kno Cves
21.
Documentation
if you answered NO to 025, your application
May be subject to an information request and
. processing of the application may be delayed.
25. Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?
LNno Clyes
2 The administering authority may be either the EPA, or if devolved or delegated, the focal govemment, DPIF or NRW.
Page 14
Page 22
Zon °F LNIOd N33NOS) SSeS Hae Wien Ro eatee o wrote a SHG 1 LOE
oe mane tee rang oe yay eh weno 1 ni 0830 veer sees ee ee SO
sAey] sO tho a . a
N¥ld SLISlQNIGINa J1avivoO Idd A3SOd0ddIIBIIG oY JOOp}N Ta a ee oD
20H 390/044 oN” suasco] aa .
{
QO0\: \- 31V28 (-»
wbs Od rr! *WLOL , ~
ubs @D9¢ ‘Olle ISOdONd NV 1d ALIS Ey,
SES, lS cocar :
wbs 9909 ‘SLINN ONIT
eu race WaSY ALIg dqvou Iva IyV 1
HIAVW JO ALNIOD ¢ @ _ HOOT _y ©)
VSOON JO Hla - 5
OLD2G8 ‘IA VO'| 107 ‘ 3 3
Py e e
NO|Ldla9S30 AlLasdOad 8 % E
ASSN
5014 man
960d SSS
7 00006
* ®@
{
1
|
{
q
| J
‘ W @goRel ©
Page 23
. -ON GOP Lir C00 (10) Md VITveuSIY Ka OTD aNVESRIG paw 8 on © OM io0z Amr #0400 qvou LAD SPW 885 TOD NYAS ENG Ge SMO HL om RPRRTTi ww, SDOOI.O0.00 :aey| ON Buyanig OS:} :ejD95S) siamid ® AH3SHS H SAW o—!, jerenitiy olzv bo Bog eHet aS NV1d 4oo7s] ONIaTING shavivooisa dasoddueh AIG ©} JOOP INQ ee oS 201411 1490fo41g oe a Bhar ava pas ; . : SINSXNSY pon pg A Oy & a0 3001 Gung jo aul g ladda Savsdo aad SV ADNAIDidd3 42e5NA *JLON Oll¥d AsadAOD N3HOLID Avmizazea diaWAoD 49A0 JOO: SAMO Bujsds jo ou tee] tee ][t + ++e[ tee ]t + OS *|- JWI NV Id A001
Page 24
7ON GOP LLGr OOZE (LO) M4 VITVAUSTY far OT anveseta aeTRDe
V | ZOb'e GM Woo Ainp 78400 avou Wldd NasaQ8 Rio) Sra NY ENG GW SONIC 323 wine el Segoe Brae SOO). 2OOG
RABY] :ON Bulmosg OS:} 2e1D9S sluntid V 2 AH3SHS H SW a—°, Eqaniny o1er BD BRNNO SET TOM "
NVld ONINVYS 2% ONILOOS|ONIGING JVLVOO IY GIsOdOdd y9a11g G) 400pInO zemaptaeay “yo?
OULL :poefoud onc,* suecolavainad
r,! ra! ry! . (-»
Le siviad Na OL saN1003 DNINTV Le a4 as
NV Id ONINVald P ENILOOS \ = _/
reg a gS Lol, ra
Li, L.J L. Li ae io
— Ved NO $LSOd SHSOLX9L eo
$'IV130 ONS OL SENILOOS ee .
| ee ee |
— — |
|
ee Pi ba
n hey) 1 |
Pt
lift |
BS ri eth poet roc et
Pt dd td |
| A
| |
| Pl fl
Z Pld ld
IL
— __
a __
— __
| ee a |
| _ yn WEE — { |
a — ™
aa S1IV130 ®NA OL SENILOOS i; oo.
Ce Vel NO S1S0cl SHS9LX4L OT ,
aa een OE
Page 25
. <ON gor UGr G2 (LO) Md VITVaiISTIV tly OTD INVESRI = fore OM Zooz Alnr 26100 lod NAa80 SOGEEMOCYS SARK BOIS3H | 193d NOOALNO 4 ggpraDe Qvouw wid : IHDRUGOO SH MVE GOEIO CRY GONE 363 ae rs 8 Pree amas SOOO D600 H W J] :on Gumoag] OS?! IDSs] SINMMId VW % AHASHS HS onto preesnmeemmpenroro SNOILVA373) ONIGIING NaVLV9013u d3sod08dg AIG G) JOOP N CER MOONS GTR SAOT NTS SUT aes yD sOULL :y9e[04aq oe siaieo| “avo : Q¢ ‘|: 3196 f- CIN ONAMD NOILVASTA 1SV3 HLION \ =) i Ui i Ui in | 04 ‘| 31v98 (- / ainta3e NOILWASTS 1SaMm HINES \ = _/ oe i a. in ui i
Page 26
g | zoe am “ON GOP g LASy ote (U0) Ss vimausty Kv TD aweseS : Zooz Aine +8400 qvou 171 4 ? MRD NNER GORI Che GONE 23H cor ee ST Se ea GROW OO rAsyl :ON Bulmnsg OS:| :e/D9S sland ¥ W re SNOILVA313 SNIGTING shavivools oO SOd08d ' + Ciencias ROONA Hive + Gala 130 S000 ONO b SMAI] Lea] et 199410 ©‘ s00pINg lewenrsny Diz» Px) PIUEN Grol koG'O'd 5 INTO] LOLOv9Z|_V 81) 3y90efo1g oN suawo| aah 06 ‘|: AVI (- » _ Ginn NID NOWLWAR13 AvMazazae Lo) pr 7 4 ,7 1m y 1 oy wu Lug, cua cus cuy ro-4 x3 Led cmt I= 11 4 Le os: 39s (-\ - (nn a3@) NOILVAZ13 AvmaZz33aa Lo)
Page 27
TON Of cole GM :0N Buimnag zooe Ainr avoy 1v14 Slamlid V 2% AH33 ONIGIING J1sV1LVI0O13e SNOILVA313 SOd0ud LUSY OOZE (LO) Ud = WITPRAISTIV Ici GIO SNvasRa OOHAMOCY 3H SARIC YOIG2N | L9RIG ACOALIO 30 IRDRUGOO 3H NVNSY GNG30 ONY SONTHVAIO 353HL 30110 ©)100pINO ne wou puodxQauegou £02 FOC COO ‘GON S680 9999 20 TRAN sa7Ep A AINE Preneny O1zb MO DOS SrEt OP Od SESiINGITD. LOG] ¥ SINAN? FUVOFAR SINSWONSLY - 7 =11 Lo4 =31 Li4 | L JASN] NI3I2S 193SNI 1 HSAW HLM ONINSAO NOILV ILNSA 52%062 S1A3SNI NA3895 LOSSNI RGJW HLIM SONINSO NOLLVILNSA OOrxOOrx2 ram 4 =3 Lug rT 4 4002) ONINTIV WE Ir 31V26 (- NOUVASTA 1S3M HLS 4008 aN Ones NOILWA i231 Lid ON | I Loo n Q) 1Y3SNI N3FAIS ISSN} HSaW LIM NINO NOILV TUNSA 057x047 SLASSNI NAZIS 193SNi 1 HS3W HLIM SONINSAO NOILY THLNSA OOr*OOrx7 sams (>) 313 1$V4 HLNOS r I Ll J =3 | Lisa YY
Page 28
xm LAND USE SECTION FEES wim MENLOLOSTA : RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Materia! Change of Use - Code/Impact Consistent Lso 521 Inconsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period : 521 Operational Works - Landscaping 521 . Bldg Work assessable against the Planning Scheme §21 PRE LODGEMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING Purchase Advertised Applications §23 JETTIES Jetty Application Fee 524 Jetty Bond 51 (Category 4) BONDS : Performance Bond 51 (Category 9) SIGNS . Registration Fee . 222 s@Beu FEE . Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ 6SO NAME: HAW Sthoche 2 A Ahan» ADDRESS: SY Bast Ave. . Garden LeobS” FILENO: _Oo7/ !Syp DATE: 1 2/7/09 RECEIPTNO: | YZSSY_C Signature of TP Officer: CS free ~ 7 AUTHORITY NO: . . / [3 deen] (H+ |
Page 29
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES @.
Used in these records
07/1842 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.