Council archive · source document
07/1842 - MCU - Detached House [As Published] · 132007.1842
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or }9. The application involves operational work that iS: ( tick the applicable box/es)
work in coastal management district C1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For + - ‘
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, oF
hae seed nae ctte sae'oc8 (ij) tidal work that is prescribed tidal work" other than in a canal"? complete Part P of Form 1; or
te: appcatn requires somnoeal y te , Diiii) carried out w waitin 13 oa ree district under the Coastal Act and for - complete
tran ae hepatic San ise assessment Ow constructing or insaling works n a watercourse between MHWS, and HAT (ie '
ene re sen tobe assessable againat the Water Ac 2000;
Local goverment is the assessment manager (1b) constructing a canal’? intended to be connected to tidal waters,
for all prescribed tidal work.
rapes (1 (©) _ constructing an artificial waterway;
(1 (d)_ reclaiming tand under tidal water,
(J (e) disposing of dredge spoil or other solid waste material in tidal water;
( ( _ interfering with quarry material on State coastal land above high-water mark;
(21 (a) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
{JJ (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
Qa liv) none of the above.
Operational work below high water | 10. The application involves operational work that is: (tick the applicable box/es)
mark : . . CO (i) tidal work'3 as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For . . A 9
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, Of
ne goverment ae areas mn vole 1 Gi) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
Inless you answered “none of the above" to se . wae + be
ato, ihn application triggers referral to CO (ii) carried out within a coastal management district's under the Coastal Act and for -
Queensland Transport (QT) (Maritime Safety i ‘i i i jal in ti _
(ld) as a concurrence agency. Oa wisposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager ‘
for all prescribed tidal work. (1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
(1 (©) constructing a canal'2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
PE (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. C(i) a material change of use assessable under a planning scheme involving operational
Or i apatect toqures aseesonent y the work carried out completely or partly in a coastal management district's
Environmental Protection Agency (EPA). C1 (ii) a material change of use assessable under a planning scheme involving building
Hf an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
f ication, EPA is . . .
conaene agency fare appican in « the construction of a new premises with a GFA'S of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?
Ui (iii)_ reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
Li (iv) reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'2 - complete Part M of Form 1
& (v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11. Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a loca! government tidal area.
12 Canal means canal as defined under the Coasta! Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidat work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
416 GFA is defined in sch 14 of tha [PA to mean the gross floor area. For a definition of how to calculated GFA, go to the pianning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1842 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.