Report for Minor Change to Existing Approval - 7 Arakoon Cres, Sunshine Beach

of 25

Page text shows just the words. Original shows the document exactly as it was published.

                                      solid colours or reflective surfaces.

PO21                                  AO21                                             Complies with AO21
Filling    and    excavation  for Filling and excavation for operation
operational works do not directly, works are designed and constructed
indirectly or cumulatively cause to ensure overland flow and/or
adverse impacts external to the flooding is not worsened, impeded,
development site by:               or otherwise diverted to adversely
1.       causing ponding of water affect     other    properties    or
on the site or nearby land;        downstream   environments.
2.      increasing flooding, which
adversely affects the safety or use
of   any     land   upstream     or
downstream; or
3.      adversely affecting the
flow of water in any overland flow
path.


Low Density Housing Code

Performance Outcome                   Acceptable Outcome                               Response

Removal homes                         AO2.1 Any part of a removal home                 Not applicable
PO2 A removal home—                   that is affected by termite attack,
1.     does   not have an             borers,    dry   rot   or   severe
adverse impact on the amenity         weathering or is damaged as a
of the premises or surrounding        consequence of relocation, is
premises; and                         repaired or replaced using new or
2.      maintains the safety of       sound second-hand materials.
people and property.
                                      AO2.2 Where located within the                   Not applicable
                                      urban boundary, external surfaces
                                      of the building are cleaned and
                                      painted.

                                      Editor’s Note— the urban boundary is
                                      indicated on the zone maps contained
                                      within Schedule 2.

                                      Editor’s Note— applicants will be required to
                                      pay a performance bond to Council before
                                      final building approval is granted. The bond
                                      is held by Council until all external building
                                      works are completed to a satisfactory level,
                                      usually within a 12 to 24 month time frame.




                                                                                                            18
Log in to download the original file

Report for Minor Change to Existing Approval - 7 Arakoon Cres, Sunshine Beach.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.