Council archive · source document
REC14/0007 & OPW14/0253 Greenhaven Plans.
Plans and drawings: the text below has words only, no drawings.
APPLICATION
ONSITE MANAGEMENT PROCEDURES
OBJECTIVE:
CLEARING:
OBJECTIVE
04/06/2014
DESIGN REFERENCE
LEGEND TURFING DETAIL
N.T.S.
MANAGEMENT OF ESCP
I) CONTRACTORS RESPONSIBILITY
II) PRESTART MEETING
III) IMPLEMENTATION OF ESCP (DURING CONSTRUCTION)
IV) INSPECTION AND MONITORING PLAN DURING CONSTRUCTION
V) CONSTRUCTION PROGRAM
PERFORMANCE INDICATORS
DEFECTS LIABILITY PERIOD
No Date Amendment
Design: D.G.K. APPROVED CLIENT: BRUCE LANGFORD JONES COUNCIL REFERENCE:
consulting civil engineers project management services Drawn: D.G.K. PROJECT: PROPOSED 3 LOTS INTO 4 LOTS SUBDIVISION -
Pty. Ltd. ABN 68 067 110 169
P.O. Box 8200, Maroochydore D.C. QLD 4558 Date: 04/06/2014 ......................
MEMBER OF THE
AT: 8 STEVENS STREET, SUNSHINE BEACH DRAWING No: REV:
Phone (07) 5479 4220 Fax (07) 5479 4228
THIS PLAN IS COPY PROTECTED BY GREENHAVEN PROJECTS PTY. LTD.
INSTITUTE OF Checked: L.P. DATE: 04/06/2014
................. LOT 676 ON SP125656 & LOTS 675 & 697 ON RP48111
MUNICIPAL
ENGINEERING
GH2019/14/07 -
AUSTRALIA
Datum: A.H.D. SIZE A3 TITLE: EROSION AND SEDIMENT CONTROL PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REC14/0007 & OPW14/0253 Greenhaven Plans.Related documentApplication case desk ↗
REC14/0007 & OPW14/0253 Greenhaven Plans.Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.