Council archive · source document
DRAFT Delegated Authority Report Appendix - PRELIMINARY APPROVAL · OPW11/0335
Development Application Number OPW11/0335 DECISION DETAILS The following type of approval has been issued: Preliminary Approval for Operational Work for Stage 1(Engineering Works-Roadworks, Drainage Works, Landscaping, Stormwater, Earthworks, Water infrastructure, Sewerage infrastructure, Clearing vegetation under the planning scheme) RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. ASSESSMENT MANAGER CONDITIONS Prior to the issue of a Development Permit for Operational Works, payment of the Compliance Bond as described in Condition 29 in the Judgement No. 4783 of 2011 dated 24 January 2012, must be made to Council. Prior to the issue of a Development Permit for Operational Works, evidence of payment of Portable Long Service Levy, as required by Section 77 of the Building and Construction Industry (Portable Long Service Leave) Act 1991, must be submitted to Council. APPROVED PLANS/DOCUMENTS Not Applicable. REFERRAL AGENCIES Not Applicable ADVISORY NOTES The following Advisory Notes are intended to provide guidance to the applicant where necessary and inform the applicant of actions that Council may take with respect to the development site or the approval: General A Development Permit for Operational Works has not been issued because payment of the Compliance Bond as described in Condition 29 in the Judgement No. 4783 of 2011 dated 24 January 2012 has not been made. Council may favourably consider changing the Preliminary Approval to a Development Permit via the Negotiated Decision process, if the applicant has made payment of the Compliance Bond. Portable Long Service Leave Payment A Development Permit for Operational Works has not been issued because evidence of payment of the Portable Long Service Leave Levy has not been submitted as required by the Building and Construction Industry (Portable Long Service Leave) Act 1991. Council may favourably consider changing the Preliminary Approval to a Development Permit via the Negotiated Decision process, if the applicant has provided evidence of payment of the Portable Long Service Leave levy. FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Operational Work for Stage 1(Engineering Works-Roadworks, Drainage Works, Landscaping, Stormwater, Earthworks, Water infrastructure, Sewerage infrastructure, Clearing vegetation under the planning scheme) PROPERTY RECORD NOTATIONS Not Applicable. Page 2 of 2 FM1430/1-28/03/2012 FM1430/1-28/03/2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DRAFT Delegated Authority Report Appendix - PRELIMINARY APPROVALRelated documentApplication case desk ↗
About this file
- File size
- 63 KB (small file)
- File type
- DOC
No other editions are linked here.