DRAFT Delegated Authority Report Appendix - PRELIMINARY APPROVAL · OPW11/0335

of 1

Text shows just the words. Original shows the document exactly as it was published.

Development Application Number OPW11/0335

DECISION DETAILS

The following type of approval has been issued:

Preliminary Approval for Operational Work for Stage 1(Engineering Works-Roadworks, Drainage Works, Landscaping, Stormwater, Earthworks, Water infrastructure, Sewerage infrastructure, Clearing vegetation under the planning scheme)

RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is 2 years starting the day that this development approval takes effect.

ASSESSMENT MANAGER CONDITIONS

Prior to the issue of a Development Permit for Operational Works, payment of the Compliance Bond as described in Condition 29 in the Judgement No. 4783 of 2011 dated 24 January 2012, must be made to Council.
Prior to the issue of a Development Permit for Operational Works, evidence of payment of Portable Long Service Levy, as required by Section 77 of the Building and Construction Industry (Portable Long Service Leave) Act 1991, must be submitted to Council.

APPROVED PLANS/DOCUMENTS

Not Applicable.

REFERRAL AGENCIES

Not Applicable

ADVISORY NOTES

The following Advisory Notes are intended to provide guidance to the applicant where necessary and inform the applicant of actions that Council may take with respect to the development site or the approval:

General
A Development Permit for Operational Works has not been issued because payment of the Compliance Bond as described in Condition 29 in the Judgement No. 4783 of 2011 dated 24 January 2012 has not been made.  Council may favourably consider changing the Preliminary Approval to a Development Permit via the Negotiated Decision process, if the applicant has made payment of the Compliance Bond.

Portable Long Service Leave Payment
A Development Permit for Operational Works has not been issued because evidence of payment of the Portable Long Service Leave Levy has not been submitted as required by the Building and Construction Industry (Portable Long Service Leave) Act 1991.  Council may favourably consider changing the Preliminary Approval to a Development Permit via the Negotiated Decision process, if the applicant has provided evidence of payment of the Portable Long Service Leave levy.

FURTHER DEVELOPMENT PERMITS REQUIRED

Development Permit for Operational Work for Stage 1(Engineering Works-Roadworks, Drainage Works, Landscaping, Stormwater, Earthworks, Water infrastructure, Sewerage infrastructure, Clearing vegetation under the planning scheme)

PROPERTY RECORD NOTATIONS

Not Applicable.

Page  2 of 2

FM1430/1-28/03/2012

	FM1430/1-28/03/2012

Used in these records

About this file

File size
63 KB (small file)
File type
DOC

No other editions are linked here.

Original file

Log in to download the original file

DRAFT Delegated Authority Report Appendix - PRELIMINARY APPROVAL.doc · 63 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.