24553_C11_Erosion And Sediment Control Notes And Details-[A]

From the archive MCU21 0146 land clearing.zip, inside MCU21/0146 - Response to Request for Information - Noosa Civic 28 Eenie Creek Road Noosaville email 1 of 2. File date in the archive: 2021-11-03 14:18.

of 1

Page text shows just the words. Original shows the document exactly as it was published.

      NOTES:                                                                                 OPERATION AND MAINTENANCE                                                                                                                                                                                                                                                 PROVIDE SAND BAGS ACROSS FLOW PATH. PROVIDE
                                                                                         16. IN ACCORDANCE WITH NSC ESC GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED:                                                            5m                                                                                                                                 TURF AROUND SAND BAGS, TO A MINIMUM OF 1m IN
                                                                                                                                                                                                  CONSTRUCTION SITE                    MIN
      SEDIMENT CONTROL                                                                                  ·              AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY
                                                                                                                       (WHEN WORK IS NOT                                                                                                                CATTLE GRID 3.0m NOM WIDTH
                                                                                                                                                                                                                                                                                                                                                                       FRONT AND 2m BEHIND. EXTENT TO BE DETERMINED
                                                                                                                                                                                                                                                                                                                                                                       ON SITE BY SUPERINTENDENT.




                                                                                                                                                                                           100 NOM
      1. ALL EROSION AND SEDIMENT CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL                                                                                                                                                               SET 300mm ABOVE GROUND
         EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS.                               OCCURRING   ON  SITE)
                                                                                                        ·              WITHIN 24 HOURS OF EXPECTED RAIN; AND
      2. EROSION AND SEDIMENT CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE                 ·              WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT
         CONTRACTORS RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED                                   INTENSITY AND
         NECESSARY THROUGHOUT CONSTRUCTION.                                                                                                                                                                                                                       10m                                  M E NT
      3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A
                                                                                                                       DURATION TO MOBILISE SEDIMENT ON SITE).                                                                                                          MIN                     A LIGN
         FUNCTIONAL ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL 17. IN ACCORDANCE WITH NSC ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR IN                                                                                                            ER TY
                                                                                                                                                                                                                                                                                    P
         SUCCESSFUL OFF MAINTENANCE OF WORKS.                                                 ACCORDANCE WITH THE FOLLOWING TABLE:                                                                                                                                              PRO                        EL
                                                                                                                                                                                                                                                                                                         N                                                                                                                     2m
      4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE                                  MAINTENANCE SCHEDULE                                                                                                                                                          CHA
                                                                                                                                                                                                                                                                                                       N                                                                                                                               min.




                                                                                                                                                                                                                300
                                                                                                                                                                                GEOFABRIC FABRIC,                                                                                              D
         SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:                                                                                    TIMEFRAME FOR COMPLETION     BIDIM A24 OR                                                                                          AN                   AY
         a. STRIPPING OF TOPSOIL AND GRASS.                                                  ESC  MEASURE            MAINTENANCE      TRIGGER                                                                                                                                        R B                   D W
                                                                                                                                                            OF MAINTENANCE           EQUIVALENT                                                                                   KE
                                                                                                                                                                                                                                                                                                   G ROA TURFED AREA
         b. BULK EARTHWORKS TO THE SITE.                                                     SEDIMENT BASINS WHEN SETTLED SEDIMENT EXCEEDS THE VOLUME OFWITHIN 7 DAYS OF THE                                                                                                                   TIN                                                                                                                                                          1m
         c. SERVICES INSTALLATION.                                                                            THE  SEDIMENT  STORAGE  ZONE (SEE COUNCIL'S      INSPECTION                                                                                                                X I S                                                                                                                                                                   min
                                                                                                                                                                                 RUNOFF TO BE DIRECTED                                                              M IN               E                                                                                                                                                                               .
                                                                                                                  SEDIMENT  BASIN DESIGN GUIDELINES)
         d. PAVEMENT CONSTRUCTION.                                                                                                                                               TO A SEDIMENT TRAP                                                             3m
      5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED                                                                                                                                                                                                                                                                                                                                                                                      DIRE
         IN WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL          OTHER ESC THE CAPACITY OF ESC MEASURES FALLS BELOW 75%     BY THE END OF THE DAY                                                                                                                                   SANDBAGS                                                                                                                                                              CTIO
         APPLICATIONS.                                                                          MEASURES                                                                                                                                                                                                                                                                                                                                                                                    NO
                                                                                                                                                                                            UNBOUND PAVEMENT MATERIAL (GRAVEL) TO                                                                                                                                                                                                                                                             F FL
      6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION                                                                                                  GRADING B, TABLE 9 OF DMR SPECIFICATION                                                                                                                                                                                                                                                                       OW
         WITH THE APPROVED DRAWINGS.                                                                                                                                                        MRS11.05, EXCLUDE MATERIAL FINER THAN AS
      7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE                                                                                                          SIEVE 2.36mm.                                                                                                                                                                                                                                            NOTE:
         SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH   GENERAL                                                                                                                            TEMPORARY CONSTRUCTION ENTRY/EXIT
                                                                                                                                                                                                                                                                                                                                                                                                                                                      EXTENT AND SETOUT OF CHECK DAMS TO BE
                                                                                                                                                                                                                                                                                                                                                                                                                                                      PROPOSED ON SITE BY CONTRACTOR TO THE
         ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.                        18. CIVIL CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF
      8. IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILEDALL  IN STAGES OF WORK FOR APPROVAL BY THE SUPERINTENDENT.                                                                  NTS                                                                                                                                                                                                                             SATISFACTION OF THE SUPERINTENDENT
         SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE                                                                                                                                                                                                                                                                                                                   SAND BAG CHECK DAM
         AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH
         AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.                                                                                                                                                                                                                                                                                                             NTS
                                                                                                                                                                                                          INLET GRATE TO BE             SILT FENCE ON BACK OF KERB
                                                                                                                                                                                                          WRAPPED IN FILTER
      OVERALL                                                                                                                                                                                             FABRIC AND SECURED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 FIX TO TOP OF STAKE WITH
      9.                                                                                                                                                                                                                                                                                                                                                                                                                                                         SHADECLOTH FASTENER OR
             a.   TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE                                                                                                                                                                                                                                                                                                                                                                        TIE TO STEEL PICKET.
                  WHERE POSSIBLE.
             b.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL
                  BEFORE COMMENCING UP-SLOPE EARTHWORKS.
             c.   IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE                                                                                                                                                                                                                                                                                                              GEOTEXTILE FABRIC
                  EITHER MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS                                                                                                                                                                                                                                                                                                            AND SL42
                  ARE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS.                                                                                                                                                                                                                                                                                                                                                                                                        50x50 HW STAKE OR STEEL
                                                                                                                                                                                    FIELD INLET SEDIMENT BARRIER                                                                                                                    ∅100 SLOTTED PIPE WRAPPED
                                                                                                                                                                                                                                                                                                                                                                                                               OVERLAND FLO                                                PICKET 1200 MIN LONG
                                                                                                                                                                                    NTS                                                                                                                                             IN GEO-FABRIC SOCK                                                                                   W
      SEDIMENT FENCE
      10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                                                                                                                                                                             PROVIDE WEIGHT TO CENTER OF
                                                                                                                                                                                                                                                                                                                          PIPE TO AVOID FLOATATION




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 200
          CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS SF-01 AND
          SF-02 SEDIMENT FENCE.
                                                                                                                                                                                                                                                                                                                  INLET GRATE TO BE WRAPPED
                                                                                                                                                                                                                                                                                                                  IN FILTER FABRIC AND SECURED                                                                           BACKFILL
      TEMPORARY CONSTRUCTION ENTRY/EXIT
      11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO
          INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
          DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES ONLY),
          EXIT-03 - ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT -
          VIBRATION GRID.                                                                                                                                                                                                                                                            GULLY PIT SEDIMENT BARRIER
                                                                                                                                                                                                                                                                                     NTS                                                                                                                                               SEDIMENT FENCE -
      KERB INLET                                                                                                                                                                                                                                                                                                                                                                                                                       ALTERNATIVE 1
      12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                                                                                                                                                                                                                                                                                               NTS
          CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-03 KERB
          INLET SEDIMENT TRAPS.                                                                                                                                                                                                                                                                      3000 MAX. (WITHOUT
                                                                                                                                                                                                                                                                                                     SL42 FABRIC, 2000 MAX C)                                                                                                                                          FIX TO TOP OF STAKE WITH
      CHECK DAMS                                                                                                                                                                                                                                                                                                                                                                                                                                                       SHADECLOTH FASTENER OR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       TIE TO STEEL PICKET.
      13. FOR CHECK DAM STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION
          CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING RCD-01 CHECK                                                                                                                                                                                   SL42 FABRIC TO AS 1304                                                                                                          GEOTEXTILE FABRIC
          DAMS.                                                                                                                                                                                                                                                                                                                                                                                                 AND SL42                                                      50x50 HW STAKE OR STEEL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              PICKET 1200 MIN LONG
                                                                                                                                                                                                                                                                           DISTURBED AREA                                                                                                            OVERLAND FLO
      REVEGETATION                                                                                                                                                                                                                          DIR
                                                                                                                                                                                                                                                ECT
                                                                                                                                                                                                                                                                                                                                                                                                                                W                    300
      14. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL                                                                                                                                                             ION                                                                                                                                                                                             MIN
                                                                                                                                                                                                                                                           OF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            NOM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            150
          ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION                                                                                                                                                                      FLO
          GENERAL.                                                                                                                                                                                                                                                    W
                                                                                                                                                                                                                                                                                                                                                                    GEOTEXTILE FABRIC
      FIELD INLET                                                                                                                                                                                                                                                                                                                                                                                       CRUSHED OR GRANULAR
      15. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                                                                                                                                                                                                    POSTS OR STEEL PICKETS                                    MATERIAL, GRADING TO
          CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-02                                                                                                                                                                                                                                                       DRIVEN 600MM INTO GROUND                                  TABLE 4 OF QT
          GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP.                                                                                                                                                                                                                                                                                                                                                SPECIFICATION MRS11.03.




                                                                                                                                                                                                                                                                      600 MAX
                                                                                                                                                                                      HEADWALL                     SANDBAGS STACKED TWO
                                                                                                                                                                                      TYPE VARIES                  HIGH 1m FROM PIPE INLET
                                                                                                                                                                                                                                                                                                                                   100 MIN HORIZONTAL
                                                                                                                                                                                                                                                                                                                                   OVERLAP OF FABRIC
             NOTE                                                                                                                                                                                                                    DIRECTION OF
             1.   FOR EROSION AND SEDIMENT CONTROL LAYOUT
                                                                                                                                                                                                                                     FLOW                                                                                 UNDISTURBED AREA
                                                                                                                                                                                                                                                                                                                                                                                                                                       SEDIMENT FENCE -
                  PLAN REFER DRG No. C10                                                                                                                                                                                                                                                       BACKFILL
                                                                                                                                                                                                                                                                                                                                                                                                                                       ALTERNATIVE 2
             2.   CONTRACTOR TO PROVIDE FINAL ESC DESIGN TO                                                                                                                                                                                                                                                                                                                                                                             NTS
                                                                                                                                                                                                                                                                          200
                  SUIT PROPOSED CONSTRUCTION METHODOLOGY
                                                                                                                                                                                                                                                                                                                                                                                                                                                           ISSUED FOR
                                                                                                                                                              HEADWALL INLET SEDIMENT PROTECTION
                                                                                                                                                              NTS
                                                                                                                                                                                                                                                                                                     SEDIMENT FENCE DETAIL
                                                                                                                                                                                                                                                                                                     NTS                                                                                                                                       APPROVAL
                                                                                                                                                                                                                                                                                      Client                                           Discipline                                                     Status                           Title
                                                                                                                                                                                                                                                                                        STOCKWELL DEVELOPMENT GROUP PTY LTD             CIVIL                                                          APPROVAL                          EROSION AND SEDIMENT CONTROL
                                                                                                                   RPEQ CERTIFICATION
                                                                                                          PROJECT NUMBER:    24553
                                                                                                                                                                                                                                                                                      Project Name                                     Designed By                    Checked By                      Approved By
                                                                                                                                                                                                                                                                                                                                                                                                                                         NOTES AND DETAILS
                                                                                                          PROJECT NAME:      HOFFMAN DRIVE                                                                                                                                              NOOSAVILLE RESIDENTIAL APARMENTS                DM                              MVI                            MVI
                                                                                                                                                                                                            Sunshine Coast Office
                                                                                                          DATE:              19.08.21                                                                       Level 3, 2 Emporio Place                                                    HOFMAN DRIVE                                   Project No.                    Drawn By                        Scale at A1
                                                                                                                                                                                                            Maroochydore, Queensland 4558, Australia                                                                                    24553                           KS                             NTS
                                                                                                          CERTIFIED BY:      MICHAEL VAN ITALLIE                                                            PO Box 5014, Maroochydore BC, Queensland 4558
                                                                                                                                                                                                                                                                                        NOOSAVILLE
                                                                                                          RPEQ NUMBER:       13469                                                                          T 1300 657 402          F +617 3871 2266                                                                                    The concepts and information contained in this document are the copyright of ADG               Drawing No.                                             Revision
A      19.08.21   ISSUED FOR APPROVAL                                                          KS   DM                                                                                                                                                                                                                                  Engineers (Aust) Pty Ltd. Use or copying of the document in whole or in part without the
                                                                                                          SIGNATURE:         ..............................                                                 E [email protected] W www.adgce.com
Rev        Date   Description                                                                  By   Chk                                                                                                               BRISBANE / DARWIN / GOLD COAST / MELBOURNE / PERTH /
                                                                                                                                                                                                                                                                                                                                        written permission of ADG Engineers (Aust) Pty Ltd constitutes an infringement of copyright.     C11                                                       A
                                                                                                                                                                                                                            SUNSHINE COAST / SYDNEY / TOOWOOMBA                                                                         Do not scale drawings. If in doubt, ask!
Log in to download the original file

24553_C11_EROSION AND SEDIMENT CONTROL NOTES AND DETAILS-[A].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.