LATE RFI Attachment 5 - Advice from Traffic and Transport Plus

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

                                             Oct Traffic Report
24.   My conclusions / recommendations are:
             a. The proposed use is well located to minimise travel of vehicles associated with the use, being located
                adjacent to the Cooroy-Tewantin road corridor and being co-located with service station uses.
             b. The proposed use has a smaller traffic generating function than the approved shopping precinct, and
                as such will have a lower impact on road capacity and amenity to nearby residents than the approved
                use.
             c. The access solutions for the subject site are safe and adequate. The existing Elm Street / Diamond
                Lane intersection will be utilised for egress and DTMR’s crash database shows no history of casualty
                crashes at this location in 20 years.
             d. Alternative locations for the proposed use at industrial precincts at Jarrah Street and Holts Road
                would be less complementary and would involve larger diversions of vehicles from the Cooroy-
                Tewantin road corridor and an increase in unfamiliar users in an industrial area. A carwash use is
                not likely to be complementary to uses in the industrial precinct, and will reduce the opportunity for
                uses more appropriate to those locations (from a traffic engineering perspective) to locate there.
             e. From a traffic engineering perspective, the proposed development can be approved, with reasonable
                and relevant conditions.

      Yours faithfully



      Noel Kay – RPEQ #26424
      Traffic & Transport Plus




      20221115_10608_TTPlusReport.docx



                                                                                                            018
Log in to download the original file

LATE RFI Attachment 5 - Advice from Traffic and Transport Plus.pdf · 11.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.