EGX_PROD_n5390549_28_Eenie_Creek_Road,_Noosaville_Part_of_L3_on_SP246584
Attached to the e-mail MCU16/0081 - Energex advice agency response - 28 Eenie Creek Road Noosaville.
2 November 2016
J & G Knowles & Associates Pty Ltd
C/- Project Urban
PO Box 6380
Maroochydore QLD 4558
Attention: Scott Sobey
cc Noosa Council
PO Box 141
Tewantin QLD 4565
Attention: Denis Wallace
Dear Scott,
Development Application – Material Change of Use of Premises
(Multiple housing Type 3 - Retirement & Special Needs) located at 28
Eenie Creek Road, Noosaville, described as Part of Lot 3 on SP246584.
Applicant Ref: 15104
Council Ref: MCU16/0081
Our Ref: HBD 5390549 346062
We refer to the above referenced Development Application which has been
referred to Energex Limited in accordance with the Sustainable Planning Act
2009.
This site is subject to Easement D on RP177294 in favour of Energex for
high voltage 132kv overhead powerlines.
In accordance with its jurisdiction under Schedule 7 of the Sustainable
Planning Regulation 2009, Energex Limited recommends approval of the Enquiries
Angela Collins
proposed Material Change of Use of Premises (Multiple housing Type 3 -
Telephone
Retirement & Special Needs), subject to the following conditions being (07) 3664 5766
imposed by the Assessment Manager: Facsimile
(07) 3664 9829
1. This application is approved in accordance with the below referenced Email
plans. Any alterations to these plans should be resubmitted to angelacollins
Energex for comment: @energex.com.au
Corporate Office
Approved Plans 26 Reddacliff Street,
Title Plan Number Issue Date Newstead QLD 4006
CONCEPT SITE CON04 D3 19/09/2016 GPO Box 1461
Brisbane Qld 4001
Telephone (07) 3664 4000
Facsimile (07) 3025 8301
www.energex.com.au
Energex Limited
ABN 40 078 849 055
Reference: HBD 5390549 346062
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 4 pages
Page 2
2
ACCESS AND
EXISTING
ELECTRICAL
EASEMENT
LAYOUT PLAN
CONCEPT SITE CON05 D3 19/09/2016
ACCESS ROAD
CROSS
SECTIONS
132kV LINE PE2943-01 D 31/10/2016
PROFILE OVER
PROPOSED
DEVELOPMENT
DESIGN - - 14/06/2016
RESPONSE
PLAN
SITE PLAN - - 14/06/2016
LANDSCAPE LCP3 - 23/05/2016
CONCEPT
PLAN
CONCEPT SKC01 - April 2016
STORMWATER
MANAGEMENT
PLAN SHEET 1
CONCEPT SKC02 - April 2016
STORMWATER
MANAGEMENT
PLAN SHEET 2
2. All easement conditions must be maintained.
3. Satisfactory clearance from your proposed structure to the existing (and/or
future) electricity wires must be maintained in accordance with the Electrical
Safety Regulations 2013.
4. Detailed civil design drawings showing any proposed cut and fill levels on the
easement and the location of the Energex assets in relation to the proposed
development must be approved by Energex before any works can commence
on site.
5. No civil works are to occur within 5 metres of any part of an Energex Structure
(e.g.- tower base, pole or stay) without Energex approval.
6. Lighting structures are not permitted in the easement without prior written
consent of Energex. Lighting designs for proposed developments (e.g. road,
carparks etc) on the easement are likely to require reduced height structures.
Please submit detailed design to Energex for approval. These drawings must
clearly show the following;
Proposed height of the lighting structures and the ground level at the
structure base,
Relative (to lighting structures) ground levels at Energex structures
(towers, pole etc) either side of the lighting structures, and
Reference: HBD 5390549 346062
Did you know Energex has a referral website?
https://www.energex.com.au/home/our-services/connections/development-application-referrals
Page 3
3
The location of the Energex structures in relation to the proposed
lighting
7. Proposed underground services such as stormwater, sewerage, water and the
like are to be kept to the outer edge of the easement. Services crossing the
easement should be as near as practicable to right angles to the overhead
conductor direction and not within 10 metres of any tower, pole or stay.
Pipelines and crossings are to be clearly marked. Please submit the
relevant design drawings to the Energex for review. The identification,
assessment and mitigation of any possible hazards in the service due to
electromagnetically induced voltages, is the responsibility of the Developer.
8. At all times the following clearance must be maintained from the top of any
machinery moving in the vicinity of energised conductors:
132kV and 110kV conductors – 4.5m minimum clearance
Should it be necessary to transport equipment or extend any equipment, such
that these clearances cannot be confidently maintained, you are required to
contact our office to ascertain whether a Safety Officer is required on–site. All
operators of machinery are to be made aware of the presence of high voltage
conductors.
9. Any proposal for landscaping on the easement must have prior approval from
Energex. Please submit the relevant landscaping design to Energex for
approval. When considering landscape designs the planting of trees must be
kept to the edges of the easement and not under any overhead conductors.
When mature, plants or trees must not grow in excess of 3.5meters in height.
Please visit https://www.energex.com.au/home/safety/safety-around-the-
network/safetree-plants for a full list of safetree plants.
Any further works should be in accordance with Energex Standard Guidelines MD-
03/12 for general conditions when considering works either on an Energex easement
or in the vicinity of Energex assets. These are attached for your reference.
ENERGEX Limited would like to advise that Noosa Council should treat this response
as a properly made submission, as per Section 292 (3) of the Sustainable Planning Act
2009.
Should you require any further information on the above matter, please contact Angela
Collins on (07) 3664 5766.
Yours faithfully,
Angela Collins
Town Planner
Property Services
Energex Limited
Reference: HBD 5390549 346062
Did you know Energex has a referral website?
https://www.energex.com.au/home/our-services/connections/development-application-referrals
Page 4
4
Standard Guidelines MD-03/12
When considering Works, either on Energex easements or in the vicinity of Energex
assets, please be aware of the following general conditions:
Satisfactory clearance from your proposed structure to the existing (and/or future)
electricity wires must be maintained in accordance with the Electrical Safety
Regulations 2013.
All previous conditions must be adhered to and Energex may, at its discretion, audit
the finished development to check that it conforms to the conditions of the
development.
Detailed civil design drawings showing any proposed cut and fill levels on the
easement and the location of the Energex assets in relation to the proposed
development must be approved by Energex before any works can commence on
site.
No civil works are to occur within 5 metres of any part of an Energex Structure
(e.g.- tower base, pole or stay) without Energex approval.
If the minimum 5m horizontal separation to the Energex structure cannot be
achieved, the Developer must consult Energex with regards to allowable
construction methods. This may include full depth shoring of the excavation sides
for a minimum of 5 metres either side of the structure.
Any excavations deeper than 5m must have a minimum horizontal separation from
the excavation to any tower, base or pole at least equal to the excavation depth.
The excavation is not to be left open overnight and backfill is to be compacted in
150mm layers in the immediate vicinity of the structure.
10 metres clear access must be provided around all towers and pole structures
after the completion of any works on the easement.
Natural ground level on the easement should not be disturbed without Energex
approval.
Final ground levels should slope gently to the edge of the easement, surrounding
area or kerb such that pooling of water on the easement is avoided and conductor
ground clearances are not decreased.
Stockpiling of spoil on the easement is prohibited.
Lighting structures are not permitted in the easement without prior written consent
of Energex. Lighting designs for proposed developments (e.g. road, carparks etc)
on the easement are likely to require reduced height structures. Please submit
detailed design to Energex for approval. These drawings must clearly show the
following;
Proposed height of the lighting structures and the ground level at the structure
base,
Relative (to lighting structures) ground levels at Energex structures (towers,
pole etc) either side of the lighting structures, and
The location of the Energex structures in relation to the proposed lighting
Reference: HBD 5390549 346062
Did you know Energex has a referral website?
https://www.energex.com.au/home/our-services/connections/development-application-referrals
Page 5
5
Proposed underground services such as stormwater, sewerage, water and the like
are to be kept to the outer edge of the easement. Services crossing the easement
should be as near as practicable to right angles to the overhead conductor direction
and not within 10 metres of any tower, pole or stay. Pipelines and crossings are
to be clearly marked. Please submit the relevant design drawings to the Energex
for review. The identification, assessment and mitigation of any possible hazards in
the service due to electromagnetically induced voltages, is the responsibility of the
Developer.
Any cut in the vicinity of a structure or between a structure and the road kerb will
need to be stabilised by a retaining wall. The retaining wall design and location is
to be submitted to Energex for approval.
Any costs incurred by Energex as a result of the works on the easement are to be
met by the property Developer / owner.
Access to the easement and access along the easement must be available to
Energex personnel and heavy equipment at all times. Energex will require the
Developer / owner to supply and install gates where fencing prohibits access to and
along the easement area. To enable travel along the easement at anytime the
gates must be series locked with an Energex padlock. Both the padlock and a
design drawing of an acceptable gate will be provided by Energex.
At all times the following clearance must be maintained from the top of any
machinery moving in the vicinity of energised conductors:
132kV and 110kV conductors – 4.5m minimum clearance
33kV and 11kV conductors – 3m minimum clearance
Should it be necessary to transport equipment or extend any equipment, such
that these clearances cannot be confidently maintained, you are required to
contact our office to ascertain whether a Safety Officer is required on–site. All
operators of machinery are to be made aware of the presence of high voltage
conductors.
Any proposal for landscaping on the easement must have prior approval from
Energex. Please submit the relevant landscaping design to Energex for approval.
When considering landscape designs the planting of trees must be kept to the
edges of the easement and not under any overhead conductors. When mature,
plants or trees must not grow in excess of 3.5meters in height. Please visit
https://www.energex.com.au/home/safety/safety-around-the-network/safetree-
plants for a full list of safetree plants.
Reference: HBD 5390549 346062