NOOSA COUNCIL IDAS Development Application Decision Notice                                                    3 of 6




                                       Noosa Council Conditions
                                       INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     Development undertaken in accordance with this approval must generally comply with the approved plans
       of development. The approved plans are numbered 07/64-1 and 07/64-2 prepared by John Norden and
       Associates dated April 2007 and drawing number D15 prepared by Superior Jetty Construction dated 29
       May 2003 and as may be amended by these conditions and annotations made on the plans.

2.     Structures should be designed and constructed such that they are free standing within the waterway and
       are not connected to or behind the revetment wall.

3.     Jetties should have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the revetment
       wall.

4.     A rigid handrail shall be fitted on one side of the walkway.

5.     No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they
       provide support for the handrail.

6.     There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond the
       revetment wall.

7.     Lighting associated with the use shall be designed, installed, operated, and maintained in accordance
       with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.

8.     Rock scour protection, wrapped in geotextile, extends 750 mm from the face of the revetment wall in this
       locality. Piles are to be located clear of this rock protection.

9.     The jetty is to be used for private purposes only with no commercial operations to be undertaken.

10.    Boat repair activities will not be permitted on site.

11.    Wastewater and sullage shall only be disposed of at approved pumpout facilities.

12.    The mooring facility shall not be utilised for live-aboard purposes.

13.    Any construction and post construction activity is not to impact on the condition of the waterway, and is to
       be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental
       Protection (Water) Policy 1997.

14.    The approval or conditions do not constitute a ruling on structural safety and the applicant must make
       their own arrangement to ensure adequacy of design and work. Also any approval granted does not
       warrant that such plans and specifications have been checked in detail, nor does not warrant that such
       plans and specifications have been checked in detail, nor does it absolve the owner of the land from
       complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or
       relevant statues and/or statutory regulations in the execution and/or performance of said works. The
       Council does not accept any responsibility for the accuracy of such plans and specifications as approved.

15.    Certification by a Registered Professional Engineer of Queensland that states that the jetty and boat lifting
       device have been constructed in accordance with best practice methods and are structurally sound shall
       be submitted to Council prior to the return of any bond monies held by Council. A final inspection and
       approval of the structure by Council’s Inspector is also required prior to the return of any bond monies
       held by Council. Please contact Council’s Land Development Section to arrange the inspection.

16.    The jetty and boat lifting device shall be licensed with the Council upon completion of the structural work
       and shall be licensed annually thereafter.

17.    The Development Permit for a operational works of use of premises lapses if the use has not happened
       by 30 May 2009, unless an application to extend the currency is approved by Council.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@e806498b\@[email protected]

Used in these records

About this file

File size
30 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00000924.001 [As Published].pdf · 30 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.