07/1452 - Preliminary building works assessable against planning scheme [As Published]

of 23

Page text read automatically using OCR, there may be inaccuracies

 

C) Fro |
as NG@KORK Ye Checklist - Applications Involving Land /
Development & Land Use Sections

 

 

IDAS APPLICATION
REFERS,
This checklist should be used for any IDAS application. Please check each of the following items before ackepting-arr|
application at the counter.

 

 

 

 

4. APPLICATION FORMS ree
4.1. Form PartA
4.1.1. Ensure that the form is fully completed. V1

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [4]

1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [A
2. REFERRAL INFORMATION. - * :
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. 7]

3.” ENVIRONMENTALLY RELEVANT ACTIVITIES |
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

4. " FORM 2.- REQUEST TO CHANGE APPROVAL -— . *

4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

‘5. PLANS?) ep.

 

 

 

 

 

 

5.1 Ensure that at feast 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6: ‘SUPPORTING INFORMATION 77 ke

 

 

6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). {f the application is accompanied by a covering letter, ensure that it is

 

capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

 

   
 
 

 

 

 

 

 

 

7. SORBET Sea TTT eB
7.4 Ensure that the application fee, as ; determined from the ‘Council’ Ss adopted scale of fees, L/L
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form. /

 

 

Y

   

Receiving Officer fs Date .. 73 ffs

Having completed this form and accepted th application, please deliver both to the following IDAS Application Receiving

trays:-

« Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

«  fthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

«  {fthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

¢  inall other circumstances — AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP 1 g:\ant\forms\application checklist.doc

Log in to download the original (07_1452 - Preliminary building works assessable against planning scheme [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.