Original source · versioned page text
07/1452 - Preliminary building works assessable against planning scheme [As Published]
INTEGRATED PLANNING ACT 1997
RO OTe durne veal (ol
Operational &/or building work
assessable against a local government’s planning scheme
Part E, Version 2.1, 18 June 2007
E
a1
., Completion ofall question on Part E is mandatory for all applications involving the assessment of operational work and/of. iuilditig work assessable .:
Nature ofthe works | ne
The ‘types of work that are aSsessable against
a planning scheme are determined by the
scheme for a paiticular focal a goverment and
will vary across the State.
To determine the types of work that are
assessable under a particular planning
schemie, contact the relevant local
govemment.
‘The information in Q2 Is necessary for
statistical and planning purposes. ..
jainst a local govermment's planning schenie (including detailed engineering plans and other Dléns, detailed enginesning plans for subdivisional Works and conceptual
"design lens forengineering & building work when the ‘application does, pot involve ‘asséssment ofa material change, of use of premises at the same time):
Mo i eation 8 seeking approval at fick one (i) or both applicable}
Build’
ing work assessable agaist a planning Scheme - provieé details ote ospects outing’
work (6.9. building height greater than 8.5m; building work on high Jandslip tisk area)"
(J Operational Work assessable against a : planning ‘scheme # ! provide | delails of the faluire of the \.
operational work (6,9. roadworks; landscaping; drainage works, stomnvate water infristrucure; sewerage
infrastructure; earthworks; clearing vegetation’ signage). *
2.” Is the application for operational Work involving the creation of new lots? 4 : Mar Sp a
- fn Dyes - = specly mbar ciew bso be red btn ‘
3. ee ve the constriction of a canal thatis ssi wn reconfiguring a lot?
0: YES eo oe ce
A development peimit authorises *
development to occur, while. a preliminary
approval |s a step In the approval process
and: ‘does ctauthorise se development to occur,
Portable. Long Service: ‘Leave levy a
- applicable)
Prior to is issuing a development pemit ior the
‘works, the assessment manager is required
by: Jaw to “sight an approved form, issued by
Qléave, which signifies thatthe PLSL levy
has been pald,
For further information refer to
hitp/Aww.gleave aid .qov.au
eee is for: (tick one (1) or both i epplicibile)
Preliminary approval provide details of the ype of work 69. roadwork, stormwater, water and Sewerage
. Infrastructure, ete
° Fifee0 onmes a ZEW IRENA IA HOTEL ST PW
Oo Development permit: rovrde detals of the ype of (6g. rondo, stomwater, water and se sewe fe
vinffastructure, ete . i a
[ I
5." ‘wet subsequent toa previous’ ‘development pert or. prelinary eporval
, NO oO YES - ~ provide details. of ail previous onprovae .
ge Dais approval lapses ar i
/ f
tf
‘6... Is payment of a Portable Long Service Leave, (Pist) levy erlebl to the ropa
(2) YES - complete a7
LAKio - 07,84 9d0 ot apply
7. Has the PLSL levy been paid?
es complete 8
O ~ the applicable tevy must be ped béfore a dovopen permit can be given for the works
8 Howmuchwaspaid? a Soe a,
9. Whats the receipt number of the payment? , “ ,
| _ ————
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.