MCU14/0051 & OPW14/0274: APP A. Proposal Plans

of 36

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

PROPOSED RESIDENCE FOR:

Tu Projects
Lot 1 No. 28 Nannygai Street

 

 

Noosaville

QLD 4566
Report Status Date
WORKPLACE HEALTH AND SAFETY REPORT 27/06/2014

COMPLETED- DISCUSSED WITH AND PROVIDED TO
CLIENT ALONG WITH WORKING DRAWINGS

 

 

 

 

WORKPLACE HEALTH AND
SAFETY REPORT

COMPILED IN ACCORDANCE WITH WORK HEALTH
AND SAFETY ACT 2011

IDENTIFIED HAZARD AREAS

1. FALLS, SLIPS AND TRIPS

A) WORKING AT HEIGHTS DURING CONSTRUCTION

WHEREVER POSSIBLE, COMPONENTS FOR THIS BUILDING SHOULD BE
PREFABRICATEDOFF-SITE OR AT GROUND LEVEL TO MINIMISE THE RISK OF
WORKERS FALLING MORE THAN 2 METRES. HOWEVER, CONSTRUCTION OF THIS
BUILDING WILL REQUIRE WORKERSTO BE WORKING AT HEIGHTS WHERE A FALL
IN EXCESS OF 2 METRES IS POSSIBLE ANDINJURY IS LIKELY TO RESULT FROM
SUCH A FALL. THE BUILDER SHOULD PROVIDE A SUITABLE BARRIER WHEREVER
A PERSON IS REQUIRED TO WORK IN A SITUATION WHEREFALLING MORE THAN
2 METRES IS A POSSIBILITY.

DURING OPERATION OR MAINTANENCE

CLEANING AND MAINTANENCE OF WINDOWS, WALLS, ROOF OR OTHER
COMPONENTS OF THIS BUILDING WILL REQUIRE PERSONS TO BE SITUATED
WHERE A FALL FROM A HEIGHT IN EXCESS OF 2 METRES IS POSSIBLE. WHERE
THIS TYPE OF ACTIVITY IS REQUIRED, SCAFFOLDING, FALL BARRIERS OR
PERSONAL PROTECTIVE EQUIPMENT SHOULD BE USED IN ACCORDANCE WITH
RELEVANT CODES OF PRACTICE, REGULATIONS OR LEGISLATION.

ANCHORAGE POINTS FOR PORTABLE SCAFFOLD OR FALL ARREST DEVICES HAVE
BEEN INCLUDED IN THE DESIGN FOR USE BY MAINTANENCE WORKERS. ANY
PERSONS ENGAGED TO WORK ON THE BUILDING AFTER COMPLETION OF
CONSTRUCTION WORK SHOULD BE INFORMED ABOUT THE ANCHORAGE

 

B) SLIPPERY OR UNEVEN SURFACES FLOOR FINISHES

SPECIFIED FINISHES HAVE BEEN SELECTED TO MINIMISE THE RISK OF FLOORS
AND PAVED AREAS BECOMING SLIPPERY WHEN WET OR WHEN WALKED ON
WITH SHOES/FEET. ANY CHANGES TO THE SPECIFIED FINISH SHOULD BE MADE
IN CONSULTATION WITH THE DESIGNER OR, IF THIS IS NOT PRACTICAL,
SURFACES WITH AN EQUIVALENT OR BETTER SLIP RESISTANCE SHOULD BE
CHOSEN.

THE OWNER IS RESPONSIBLE FOR THE SELECTION OF SURFACE FINISHES IN THE
PEDESTRIAN TRAFFICABLE AREAS OF THIS BUILDING. SURFACES SHOULD BE
SELECTED IN ACCORDANCE WITH AS HB 197:1999 AND AS/NZ 4586:2004.

STEPS, LOOSE OBJECTS ADN UNEVEN SURFACES

DUE TO DESIGN RESTRICTIONS FOR THIS BUILDING STEPS AND/OR RAMPS ARE
INCLUDED IN THE BUILDING WHICH MAY BE A HAZARD TO WORKERS
CARRYING OBJECTS OR OTHERWISE OCCUPIED. STEPS SHOULD BE CLEARLY
MARKED WITH BOTHE VISUAL AND TACTILE WARNING DURING
CONSTRUCTION, MAINTANENCE, DEMOLITION AND AT ALL TIMES WHEN THE
BUILDING ACTS AS A WORKPLACE.

BUILDING OWNERS AND OCCUPIERS SHOULD MONITOR THE THE PEDESTRIAN
ACCESS WAYS AND IN PARTICULAR ACCESS TO AREAS WHERE MAINTANENCE
IS ROUTINELY CARRIED OUT TO ENSURE THAT SURFACES HAVE NOT MOVED OR
CRTACKED SO THAT THEY BECOME UNEVEN AND PRESENT A TRIP HAZARD.
SPILLS, LOOSE MATERIAL, STRAY OBJECTS OR ANY OTHER MATERIAL THAT MAY
CAUSE A SLIP OR A TRIP HAZARD SHOULD BE CLEANED OR REMOVED FROM
ACCESS WAYS.

CONTRACTORS SHOULD BE REQUIRED TO MAINTAIN A TIDY WORKSITE DURING
CONSTRUCTION, MAINTANENCE SHOULD BE STORED IN DESIGNATED AREAS
WAY FROM ACCESS WAYS AND WORK AREAS.

2. FALLING OBJECTS LOOSE MATERIALS OR SMALL OBJECTS
CONSTRUCTION, MAINTENANCE OR DEMOLITION WORK ON OR AROUND THIS
BUILDING IS LIKELY TO INVOLVE PERSONS WORKING ABOVE GROUNDLEVEL OR
ABOVE FLOOR LEVELS. WHERE THIS OCCURS ONE OR MORE OF THE
FOLLOWING MEASURES SHOULD BE TAKEN TO AVOID OBJECTS FALLING FROM
THE AREA WHERE THE WORK IS BEING CARRIED OUT ONTO PERSONS BELOW.
1. PREVENT OR RESTRICT ACCESS TO AREAS BELOW WHERE THE
WORK IS BEING CARRIED OUT
2. PROVIED TOEBOARDS TO SCAFFOLDING OR WORK PLATFORMS.
3. PROVIDE PROTECTIVE STRUCTURE BELOW THE WORK AREA.
4. ENSURE THAT ALL PERSONS BELOW THE WORK AREA HAVE
PERSONAL PROTECTIVE EQUIPMENT.

BUILDING COMPONENTS

DURING CONSTRUCTION, RENOVATION OR DEMOLITION OF THIS BUILDING,
PARTS OF THE STRUCTURE INCLUDING FABRICATED STELWORK, HEAVY
PANELS AND MANY OTHER COMPONENTS WILL REMAIN STANDING PRIOR TO
OR AFTER SUPPORTING PARTS ARE IN PLACE. CONTRACTORS SHOULD ENSURE
THAT TEMPORARY BRACING OR OTHER REQUIRED SUPPORT IS IN PLACE AT ALL
TIMES WHEN COLLAPSE WHICH MAY INJURE PERSONS IN THE AREA IS
POSSIBILITY.

MECHANICAL LIFTING OF MATERIALS AND COMPONENTS DURING
CONSTRUCTION, MAINENANCE OR DEMOLITION PRESENTS A RISK OF FALLING
OBJECTS. CONTRACTORS SHOULD ENSURE THAT APPROPRIATE LIFTING
DEVICES ARE USED, THAT LOADS ARE PROPERLY SECURED AND THAT ACCESS
TO AREAS BELOW THE LOAD IS PREVENTED OR RESTRICTED.

3. TRAFFIC MANAGEMENT

PARKING OF VEHICLES OR LOADING/UNLOADING OF VEHICLES ON THIS
ROADWAY WAY CAUSE A TRAFFIC HAZARD. DURING CONSTRUCTION,
MAINENANCE OR DEMOLITION OF THIS BUILDING DESIGNATED PARKING FOR
WORKERS AND LOADING AREAS SHOULD BE PROVIDED. tRAINED TRAFFIC
MANAGEMENT PERSONNEL SHOULD BE REPONSIBLE FOR THE SUPERVISION OF
THE AREAS.

CONSTRUCTION OF THIS BUILDING WILL REQUIRE LOADING AND UNLOADING
OF MATERIALS ON THE ROADWAY. DELIVERIES SHOULD BE WELL PLANNED TO
AVOID CONGESTION OF LOADING AREAS AND TRAINED TRAFFIC
MANAGEMENT PERSONNEL SHOULD BE USED TO SUPERVISE THESE AREAS.

BUSY CONSTRCUCTION AND DEMOLITION SITES PRESENT A RISK OF COLLISION
HERE DELIVERIES AND OTHER TRAFFIC ARE MOVING WITHIN THE SITE. A

4.SERVICES

RUPTURE OF SERVICES DURING EXCAVATION OR OTHER ACTIVITY CREATES A
VARIETY OF RISKS INCLUDING RELEASE OF HAZARDOUS MATERIA. EXISTING
SERVICES ARE LOCATED ON OR AROUND THIS SITE. WHERE KNOWN, THESE
ARE IDENTIFIED ON THE PLANS BUT THE EXACT LOCATION AND EXTENT OF
SERVICES MAY VARY FROM THAT INDICATED. SERVICES SHOULD BE LOCATED
USING AN APPRIOPRIATE SERVICES (SUCH AS DIAL BEFORE YOU DIG),
APPROPRIATE EXCAVATION PRACTICE SHOULD BE USED AND, WHERE
NECESSARY, SPECIALIST CONTRACTORS SHOULD BE USED.

(IN LOCATIONS WITH UNDERGROUND POWER)

UNDERGROUND POWER LINES ARE LOCATED IN OR AROUND THIS SITE. ALL
UNDER-GROUND POWER LINES MUST BE DISCONNECTED OR CAREFULLY
LOCATED AND ADEQUATE WARNING SIGNS USED PRIOR TO ANY
CONSTRUCTION, MAINTENANCE OR DEMOILITION WORK COMMENCING.

(IN LOCATIONS WITH OVERHEAD POWERLINES)

OVERHEAD POWERLINES ARE ON OR NEAR THIS SITE. THESE POSE A RISK OF
ELECTROCUTION IF STRUCK OR APPROACHED BY LIFTING DEVICES OR OTHER
PLANT AND PERSONS WORKING ABOVE GROUND LEVEL. WHERE THERE IS A
DANGER OF THIS OCCURING, POWER LINES SHOULD BE, WHERE PRACTICAL,
DISCONNECTED OR RELOCATED. WHERE THIS IS NOT PRACTICAL ADEQUATE
WARNING SIGNS IN THE FORM OF BRIGHT COLOURED TAPE OR SIGNAGE
SHOULD BE USED OR A PROTECTIVE BARRIER PROVIDED.

5.MANUAL TASKS

COMPONENTS WITHIN THIS DESIGN WITH A MASS IN EXCESS OF 25KG SHOULD
BE LIFTED BY 2 OR MORE WORKERS OR BY MECHANICAL LIFTING DEVICE.
WHERE THIS IS NOT PRACTICAL, SUPPLIERS OR FABRICATORS SHOULD BE
REQUIRED TO LIMIT THE COMPONENT MASS. ALL MATERIAL PACKAGING,
BUILDING AND MAINENANCE COMPONENTS SHOULD CLEARLY SHOW THE
TOTAL MASS OF PACKAGES AND WHERE PRACTICAL ALL ITEMS SHOULD BE
STORED ON-SITE IN A WAY WHICH MINIMISES BENDING BEFORE LIFTING.
ADVICE SHOULD BE PROVIDED ON SAFE LIFTING METHODS IN ALL AREAS
WHERE LIFTING MAY OCCUR. CONSTRUCTION, MAINTENANCE AND
DEMOLITION OF THIS BUILDING WILL REQUIRE THE USE OF OF PORTABLE
TOOLS AND EQUIPMENT. THESE SHOULD BE FULLY MAINTAINED IN
ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND NOT USED
WHERE FAULTY OR (IN THE CASE OF ELECTRICAL EQUIPMENT) NOT CARRYING A
CURRENT ELECTRICAL SAFETY TAG. ALL SAFETY GUARDS OR DEVICES SHOULD
BE REGULARLY CHECKED AND PERSONAL PROTECTIVE EQUIPMENT SHOULD BE
USED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATION.

6. HAZARDOUS SUBSTANCES

POWDERED MATERIAL

MANY MATERIALS USED IN THE CONSTRUCTION OF THIS BUILDING CAN CAUSE
HARM IF INHALED IN POWDERED FORM. PERSONS WORKING IN OR ON THE
BUILDING DURING CONSTRUCTION , OPERATIONAL MAINTENANCE OR
DEMOLITION SHOULD ENSURE GOOD VENTILATION AND WEAR PERSONEL
PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION
WHILE USING POWDERED MATERIAL OR WHEN SANDING, DRILLING CUTTING
OR OTHERWISE DISTURBING OR CREATING POWDERED MATERIAL.

TREATED TIMBER

THE DESIGN OF THIS BUILDING INCLUDES PROVISION FOR THE INCLUSION OF
TREATEDTIMBER WITHIN THE STRUCTURE. DUST OR FUMES FROM THIS
MATERIAL CAN BE HARMFUL. PERSONS WORKING ON OR IN THE BUILDING
DURING OPERATIONAL CONSTRUCTION, MAINTENANCE OR DEMOLITION OF
THE BUILDING SHOULD ENSURE GOOD VENTILATION AND WEAR PERSONEL
PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION
WHILE USING POWDERED MATERIAL OR WHEN SANDING, DRILLING CUTTING
OR OR USING TREATED TIMBER IN A WAY THAT MAY CAUSE HARMFUL
MATERIAL TO BE RELEASED. DO NOT BURN TREATED TIMBER.

SYNTHETIC MINERAL FIBRE

FIBREGLASS, ROCKWOOL, CERAMIC AND OTHER MATERIALS USED FOR
THERMAL OR SOUND INSULATION MAY CONTAIN SYNTHETIC MINERAL FIBRE
WHICH MAY BE HARMFUL IF INHALED OR IF IT COMES INTO CONTACT WITH
SKIN, EYES OR OTHER SENSITIVE PARTS OF THE BODY. PERSONAL PROTECTIVE
EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION OF HARMFUL
MATERIAL SHOULD BE USED WHEN INSTALLING, REMOVING OR WORKING

TIMBER FLOORS

THIS BUILDING CONTAINS TIMBER FLOORS WHICH HAVE AN APPLIED FINISH.
AREAS WHERE FINISHES ARE APPLIED SHOULD BE KEPT WELL VENTILATED
DURING SANDING AND APPLICATION AND FOR A_ PERIOD AFTER
INSTALLATION. PRESONAL PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED.
THE MANUFACTURER'S RECCOMENDATIONS FOR USE MUST BE CAREFULLY
CONSIDERED AT ALL TIMES.

7. CONFINED SPACES

EXCAVATION

CONSTRUCTION OF THIS BUILDING AND SOME MAINTENANCE ON THE
BUILDING WILL REQUIRE EXCAVATION AND INSTALLATION OF ITEMS WITHIN
EXCAVATIONS. WHERE PRACTICAL, INSTALLATION SHOULD BE CARRIED OUT
USING METHODS WHICH DO NOT REQUIRE WORKERS TO ENTER THE
EXCAVATION. WHERE THIS IS NOT PRACTICAL, ADEQUATE SUPPORT FOR THE
EXCAVATED AREA AHOULD BE PROVIDED TO PREVENT COLLAPSE. WARNING
SIGNS AND BARRIERS TO PREVENT ACCIDENTAL OR UNAUTHORISED ACCESS
TO ALL EXCAVATIONS SHOULD BE PROVIDED.

ENCLOSED SPACES

ENCLOSED SPACES WITHIN THE BUILDING MAY PREVENT A RISK TO PERSONS
ENTERING FOR CONSTRUCTION, MAINTENANCE OR ANY OTHER PURPOSE. THE
DESIGN DOCUMENTATION CALLS FOR WARNING SIGNS AND BARRIERS TO
UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED THROUGHOUT THE
LIFE OF THE BUILDING. WHERE WORKERS ARE REQUIRED TO ENTER ENCLOSED
SPACES, AIR TESTING EQUIPMENT AND PERSONAL PROTECTIVE EQUIPMENT
SHOULD BE PROVIDED.

SMALL SPACES

SOME SMALL SPACES WITHIN THIS BUILDING WILL REQUIRE ACCESS BY
CONSTRUCTION OR MAINTENANCE WORKERS. THE DESIGN DOCUMENTATION
CALLS FOR WARNING SIGNS AND BARRIERS TO UNAUTHORISED ACCESS.
THESE SHOULD BE MAINTAINED THROUGHOUT THE LIFE OF THE BUILDING.
WHERE WORKERS ARE REQUIRED TO ENTER SMALL SPACES THEY SHOULD BE
SCHEDULED FOR SHORT PERIODS OF TIME. MANUAL LIFTING AND OTHER
MANUAL ACTIVITY SHOULD BE RESTRICTED IN SMALLSPACES.

8. PUBLIC ACCESS

PUBLIC ACCESS TO CONSRTUCTION AND DEMOLITION SITES AND TO AREAS
UNDER MAINTENANCE CAUSES RISK TO WORKERS AND PUBLIC. WARNING
SIGNS AND SECURE BARRIERS TO UNAUTHORISED ACCESS SHOULD BE
PROVIDED. WHERE ELECTRICAL INSTALLATIONS, EXCAVATIONS, PLANT OR
LOOSE MATERIALS ARE PRESENT THEY SHOULD BE SECURED WHEN NOT FULLY
SUPERVISED.

9. OPERATIONAL USE OF BUILDING

THIS BUILDING HAS BEEN DESIGNED TO THE REQUIREMENTS OF SPECIFIC
BUILDING CLASSIFICATION IDENTIFIED WITHIN THE DRAWINGS. WHERE A
CHANGE OF USE OCCURS AT A LATER DATE A FURTHER ASSESSMENT OF THE
WORKPLACE HEALTH AND SAFETY ISSUES SHOULD BE UNDERTAKEN, IN
ACCORDANCE WITH THE PROVISIONS OF THE WORKPLACE HEALTH AND
SAFETY ACT 2011 OR SUBSEQUENT REPLACEMENT ACT.

(WHERE THE SPECIFIC USE OF THE BUILDING IS NOT KNOWN AT THE TIME OF
THE COMPLETION OF THIS REPORT AND A FURTHER ASSESSMENT OF THE
WORKPLACE HEALTH AND SAFETY ISSUES SHOULD BE UNDERTAKEN AT THE
TIME OF THE FIT-OUT FOR THE END USER.)

10. OTHER HIGH RISK ACTIVITY

ALL ELECTRICAL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE
OF

PRACTICE: MANAGING ELECTRICAL RISKS AT THE WORKPLACE, AS/NZ3012 AND
ALL

LICENSING REQUIREMENTS. ALL WORK USING PLANT SHOULD BE CARRIED OUT
IN ACCORDANCE WITH CODE OF PRACTICE: MANAGING RISKS OF PLANT AT
THE WORKPLACE. ALL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH
CODE OF PRACTICE: MANAGING NOISE AND PREVENTING HEARING LOSS AT
WORK. DUE TO THE HISTORY OF SERIOUS INCIDENTS IT IS RECOMMENDED
THAT PARTICULAR CARE BE EXERCISED WHEN UNDERTAKING WORK

 

 

 

 

 

 

 

 

 

 

 

 

 

TRAFFIC MANAGEMENT PLAN SUPERVISED BY TRAINED TRAFFIC MANAGEMENT FAR BULK INSULATION MATERIAL. INVOLVING STEEL CONSTRUCTION AND CONCRETE PLACEMENT. ALL THE
POINTS. PERSONNEL SHOULD BE ADOPTED FOR THE WORK SITE. ABOVE APPLIES.
We reserve the fight ‘e ater designs colours and Please Read Carefully Builder: Client: . Title: Issue/Rev.| Plot Date Description Drawing No: Scale: N/A
il been taken inthe preparation of this document the | This plan certified correctis the one referred to in the contract & Tu Projects Unit 1: 217.58 sqm |__cA_| 11/06/2014] Concept Drawings Designed By LY
Shop 8 & 9 H20 Broadwater | Particulars contained herein are not to be! « acigcations and | understand change hereafter may not be ‘ Workplace Health & Safety | (),,: >: 217.58 sqm | €B (b) | 22/06/2014] Re-design as requested - alternate facade
a rn Sos ae SE | oie tee pla supacdeal oe pens pas or detches Lot 1 No. 28 Nannygai Street Soe am oe Fee abta | Rael eae ne 2 or) 36 foowner PK
oes Sandon ite sovvonts or agents for ony ene o| Owner /s Date. Noosaville Design Name: ta en [ep] 26/06/2014) Amendments as requested Checked 8) cy
¥ erinfooianthatdesgncomay | PEt, 5 sea oF agents for any evors a ststnentnnnsntnientnisnsnnsestneuee ots Unit 4: 222.41 sqm pa} 27/06/20141 Pre os q see y:
www.iwantthatdesign.com.au_ ‘own enquiries to satisf emselves in relation to reuminal rawings Issuer
voeamvaiarn ease suaizae [atime SY ‘emses THN OY OW ner / § annninenintnnnnannnninnieDARC cn QLD 4566 Custom Total: 876.07 sqm 7 3 Job No: 4416SM

 

 

 

 

 

 

 

 

 

 

 

 

Intellectual Property: Designs cannot be copied in part or full All designs remain Intellectual Property of | Want That Design Pty Ltd at all times, with all rights reserved. Single use permission for construction, preliminary and marketing purposes will be granted only upon receiving full payment.
Design files will NOT be released without prior written contractual agreement in advance of the design work being undertaken and clients acceptance of | Want That Design's Terms, Conditions of Trade, Rates and Service Notes. Full Terms & Conditions of Trade are available at
wonw.iwantthatdesign.com.au_or contact orders@iwantthatdesiqn com.au to attain details. Attaining copyright in full or part will only be acknowledged in written format from the Director/s of | Want That Design.

teamwork//Design-Mgr-PC/40 Nannygai Street - PA

 

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0051 & OPW14_0274_ APP A. Proposal Plans.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.