Council archive · source document
MCU14/0051 & OPW14/0274: APP A. Proposal Plans
Plans and drawings: the text below has words only, no drawings.
PROPOSED RESIDENCE FOR: Tu Projects Lot 1 No. 28 Nannygai Street Noosaville QLD 4566 Report Status Date WORKPLACE HEALTH AND SAFETY REPORT 27/06/2014 COMPLETED- DISCUSSED WITH AND PROVIDED TO CLIENT ALONG WITH WORKING DRAWINGS WORKPLACE HEALTH AND SAFETY REPORT COMPILED IN ACCORDANCE WITH WORK HEALTH AND SAFETY ACT 2011 IDENTIFIED HAZARD AREAS 1. FALLS, SLIPS AND TRIPS A) WORKING AT HEIGHTS DURING CONSTRUCTION WHEREVER POSSIBLE, COMPONENTS FOR THIS BUILDING SHOULD BE PREFABRICATEDOFF-SITE OR AT GROUND LEVEL TO MINIMISE THE RISK OF WORKERS FALLING MORE THAN 2 METRES. HOWEVER, CONSTRUCTION OF THIS BUILDING WILL REQUIRE WORKERSTO BE WORKING AT HEIGHTS WHERE A FALL IN EXCESS OF 2 METRES IS POSSIBLE ANDINJURY IS LIKELY TO RESULT FROM SUCH A FALL. THE BUILDER SHOULD PROVIDE A SUITABLE BARRIER WHEREVER A PERSON IS REQUIRED TO WORK IN A SITUATION WHEREFALLING MORE THAN 2 METRES IS A POSSIBILITY. DURING OPERATION OR MAINTANENCE CLEANING AND MAINTANENCE OF WINDOWS, WALLS, ROOF OR OTHER COMPONENTS OF THIS BUILDING WILL REQUIRE PERSONS TO BE SITUATED WHERE A FALL FROM A HEIGHT IN EXCESS OF 2 METRES IS POSSIBLE. WHERE THIS TYPE OF ACTIVITY IS REQUIRED, SCAFFOLDING, FALL BARRIERS OR PERSONAL PROTECTIVE EQUIPMENT SHOULD BE USED IN ACCORDANCE WITH RELEVANT CODES OF PRACTICE, REGULATIONS OR LEGISLATION. ANCHORAGE POINTS FOR PORTABLE SCAFFOLD OR FALL ARREST DEVICES HAVE BEEN INCLUDED IN THE DESIGN FOR USE BY MAINTANENCE WORKERS. ANY PERSONS ENGAGED TO WORK ON THE BUILDING AFTER COMPLETION OF CONSTRUCTION WORK SHOULD BE INFORMED ABOUT THE ANCHORAGE B) SLIPPERY OR UNEVEN SURFACES FLOOR FINISHES SPECIFIED FINISHES HAVE BEEN SELECTED TO MINIMISE THE RISK OF FLOORS AND PAVED AREAS BECOMING SLIPPERY WHEN WET OR WHEN WALKED ON WITH SHOES/FEET. ANY CHANGES TO THE SPECIFIED FINISH SHOULD BE MADE IN CONSULTATION WITH THE DESIGNER OR, IF THIS IS NOT PRACTICAL, SURFACES WITH AN EQUIVALENT OR BETTER SLIP RESISTANCE SHOULD BE CHOSEN. THE OWNER IS RESPONSIBLE FOR THE SELECTION OF SURFACE FINISHES IN THE PEDESTRIAN TRAFFICABLE AREAS OF THIS BUILDING. SURFACES SHOULD BE SELECTED IN ACCORDANCE WITH AS HB 197:1999 AND AS/NZ 4586:2004. STEPS, LOOSE OBJECTS ADN UNEVEN SURFACES DUE TO DESIGN RESTRICTIONS FOR THIS BUILDING STEPS AND/OR RAMPS ARE INCLUDED IN THE BUILDING WHICH MAY BE A HAZARD TO WORKERS CARRYING OBJECTS OR OTHERWISE OCCUPIED. STEPS SHOULD BE CLEARLY MARKED WITH BOTHE VISUAL AND TACTILE WARNING DURING CONSTRUCTION, MAINTANENCE, DEMOLITION AND AT ALL TIMES WHEN THE BUILDING ACTS AS A WORKPLACE. BUILDING OWNERS AND OCCUPIERS SHOULD MONITOR THE THE PEDESTRIAN ACCESS WAYS AND IN PARTICULAR ACCESS TO AREAS WHERE MAINTANENCE IS ROUTINELY CARRIED OUT TO ENSURE THAT SURFACES HAVE NOT MOVED OR CRTACKED SO THAT THEY BECOME UNEVEN AND PRESENT A TRIP HAZARD. SPILLS, LOOSE MATERIAL, STRAY OBJECTS OR ANY OTHER MATERIAL THAT MAY CAUSE A SLIP OR A TRIP HAZARD SHOULD BE CLEANED OR REMOVED FROM ACCESS WAYS. CONTRACTORS SHOULD BE REQUIRED TO MAINTAIN A TIDY WORKSITE DURING CONSTRUCTION, MAINTANENCE SHOULD BE STORED IN DESIGNATED AREAS WAY FROM ACCESS WAYS AND WORK AREAS. 2. FALLING OBJECTS LOOSE MATERIALS OR SMALL OBJECTS CONSTRUCTION, MAINTENANCE OR DEMOLITION WORK ON OR AROUND THIS BUILDING IS LIKELY TO INVOLVE PERSONS WORKING ABOVE GROUNDLEVEL OR ABOVE FLOOR LEVELS. WHERE THIS OCCURS ONE OR MORE OF THE FOLLOWING MEASURES SHOULD BE TAKEN TO AVOID OBJECTS FALLING FROM THE AREA WHERE THE WORK IS BEING CARRIED OUT ONTO PERSONS BELOW. 1. PREVENT OR RESTRICT ACCESS TO AREAS BELOW WHERE THE WORK IS BEING CARRIED OUT 2. PROVIED TOEBOARDS TO SCAFFOLDING OR WORK PLATFORMS. 3. PROVIDE PROTECTIVE STRUCTURE BELOW THE WORK AREA. 4. ENSURE THAT ALL PERSONS BELOW THE WORK AREA HAVE PERSONAL PROTECTIVE EQUIPMENT. BUILDING COMPONENTS DURING CONSTRUCTION, RENOVATION OR DEMOLITION OF THIS BUILDING, PARTS OF THE STRUCTURE INCLUDING FABRICATED STELWORK, HEAVY PANELS AND MANY OTHER COMPONENTS WILL REMAIN STANDING PRIOR TO OR AFTER SUPPORTING PARTS ARE IN PLACE. CONTRACTORS SHOULD ENSURE THAT TEMPORARY BRACING OR OTHER REQUIRED SUPPORT IS IN PLACE AT ALL TIMES WHEN COLLAPSE WHICH MAY INJURE PERSONS IN THE AREA IS POSSIBILITY. MECHANICAL LIFTING OF MATERIALS AND COMPONENTS DURING CONSTRUCTION, MAINENANCE OR DEMOLITION PRESENTS A RISK OF FALLING OBJECTS. CONTRACTORS SHOULD ENSURE THAT APPROPRIATE LIFTING DEVICES ARE USED, THAT LOADS ARE PROPERLY SECURED AND THAT ACCESS TO AREAS BELOW THE LOAD IS PREVENTED OR RESTRICTED. 3. TRAFFIC MANAGEMENT PARKING OF VEHICLES OR LOADING/UNLOADING OF VEHICLES ON THIS ROADWAY WAY CAUSE A TRAFFIC HAZARD. DURING CONSTRUCTION, MAINENANCE OR DEMOLITION OF THIS BUILDING DESIGNATED PARKING FOR WORKERS AND LOADING AREAS SHOULD BE PROVIDED. tRAINED TRAFFIC MANAGEMENT PERSONNEL SHOULD BE REPONSIBLE FOR THE SUPERVISION OF THE AREAS. CONSTRUCTION OF THIS BUILDING WILL REQUIRE LOADING AND UNLOADING OF MATERIALS ON THE ROADWAY. DELIVERIES SHOULD BE WELL PLANNED TO AVOID CONGESTION OF LOADING AREAS AND TRAINED TRAFFIC MANAGEMENT PERSONNEL SHOULD BE USED TO SUPERVISE THESE AREAS. BUSY CONSTRCUCTION AND DEMOLITION SITES PRESENT A RISK OF COLLISION HERE DELIVERIES AND OTHER TRAFFIC ARE MOVING WITHIN THE SITE. A 4.SERVICES RUPTURE OF SERVICES DURING EXCAVATION OR OTHER ACTIVITY CREATES A VARIETY OF RISKS INCLUDING RELEASE OF HAZARDOUS MATERIA. EXISTING SERVICES ARE LOCATED ON OR AROUND THIS SITE. WHERE KNOWN, THESE ARE IDENTIFIED ON THE PLANS BUT THE EXACT LOCATION AND EXTENT OF SERVICES MAY VARY FROM THAT INDICATED. SERVICES SHOULD BE LOCATED USING AN APPRIOPRIATE SERVICES (SUCH AS DIAL BEFORE YOU DIG), APPROPRIATE EXCAVATION PRACTICE SHOULD BE USED AND, WHERE NECESSARY, SPECIALIST CONTRACTORS SHOULD BE USED. (IN LOCATIONS WITH UNDERGROUND POWER) UNDERGROUND POWER LINES ARE LOCATED IN OR AROUND THIS SITE. ALL UNDER-GROUND POWER LINES MUST BE DISCONNECTED OR CAREFULLY LOCATED AND ADEQUATE WARNING SIGNS USED PRIOR TO ANY CONSTRUCTION, MAINTENANCE OR DEMOILITION WORK COMMENCING. (IN LOCATIONS WITH OVERHEAD POWERLINES) OVERHEAD POWERLINES ARE ON OR NEAR THIS SITE. THESE POSE A RISK OF ELECTROCUTION IF STRUCK OR APPROACHED BY LIFTING DEVICES OR OTHER PLANT AND PERSONS WORKING ABOVE GROUND LEVEL. WHERE THERE IS A DANGER OF THIS OCCURING, POWER LINES SHOULD BE, WHERE PRACTICAL, DISCONNECTED OR RELOCATED. WHERE THIS IS NOT PRACTICAL ADEQUATE WARNING SIGNS IN THE FORM OF BRIGHT COLOURED TAPE OR SIGNAGE SHOULD BE USED OR A PROTECTIVE BARRIER PROVIDED. 5.MANUAL TASKS COMPONENTS WITHIN THIS DESIGN WITH A MASS IN EXCESS OF 25KG SHOULD BE LIFTED BY 2 OR MORE WORKERS OR BY MECHANICAL LIFTING DEVICE. WHERE THIS IS NOT PRACTICAL, SUPPLIERS OR FABRICATORS SHOULD BE REQUIRED TO LIMIT THE COMPONENT MASS. ALL MATERIAL PACKAGING, BUILDING AND MAINENANCE COMPONENTS SHOULD CLEARLY SHOW THE TOTAL MASS OF PACKAGES AND WHERE PRACTICAL ALL ITEMS SHOULD BE STORED ON-SITE IN A WAY WHICH MINIMISES BENDING BEFORE LIFTING. ADVICE SHOULD BE PROVIDED ON SAFE LIFTING METHODS IN ALL AREAS WHERE LIFTING MAY OCCUR. CONSTRUCTION, MAINTENANCE AND DEMOLITION OF THIS BUILDING WILL REQUIRE THE USE OF OF PORTABLE TOOLS AND EQUIPMENT. THESE SHOULD BE FULLY MAINTAINED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND NOT USED WHERE FAULTY OR (IN THE CASE OF ELECTRICAL EQUIPMENT) NOT CARRYING A CURRENT ELECTRICAL SAFETY TAG. ALL SAFETY GUARDS OR DEVICES SHOULD BE REGULARLY CHECKED AND PERSONAL PROTECTIVE EQUIPMENT SHOULD BE USED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATION. 6. HAZARDOUS SUBSTANCES POWDERED MATERIAL MANY MATERIALS USED IN THE CONSTRUCTION OF THIS BUILDING CAN CAUSE HARM IF INHALED IN POWDERED FORM. PERSONS WORKING IN OR ON THE BUILDING DURING CONSTRUCTION , OPERATIONAL MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD VENTILATION AND WEAR PERSONEL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION WHILE USING POWDERED MATERIAL OR WHEN SANDING, DRILLING CUTTING OR OTHERWISE DISTURBING OR CREATING POWDERED MATERIAL. TREATED TIMBER THE DESIGN OF THIS BUILDING INCLUDES PROVISION FOR THE INCLUSION OF TREATEDTIMBER WITHIN THE STRUCTURE. DUST OR FUMES FROM THIS MATERIAL CAN BE HARMFUL. PERSONS WORKING ON OR IN THE BUILDING DURING OPERATIONAL CONSTRUCTION, MAINTENANCE OR DEMOLITION OF THE BUILDING SHOULD ENSURE GOOD VENTILATION AND WEAR PERSONEL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION WHILE USING POWDERED MATERIAL OR WHEN SANDING, DRILLING CUTTING OR OR USING TREATED TIMBER IN A WAY THAT MAY CAUSE HARMFUL MATERIAL TO BE RELEASED. DO NOT BURN TREATED TIMBER. SYNTHETIC MINERAL FIBRE FIBREGLASS, ROCKWOOL, CERAMIC AND OTHER MATERIALS USED FOR THERMAL OR SOUND INSULATION MAY CONTAIN SYNTHETIC MINERAL FIBRE WHICH MAY BE HARMFUL IF INHALED OR IF IT COMES INTO CONTACT WITH SKIN, EYES OR OTHER SENSITIVE PARTS OF THE BODY. PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION OF HARMFUL MATERIAL SHOULD BE USED WHEN INSTALLING, REMOVING OR WORKING TIMBER FLOORS THIS BUILDING CONTAINS TIMBER FLOORS WHICH HAVE AN APPLIED FINISH. AREAS WHERE FINISHES ARE APPLIED SHOULD BE KEPT WELL VENTILATED DURING SANDING AND APPLICATION AND FOR A_ PERIOD AFTER INSTALLATION. PRESONAL PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE MANUFACTURER'S RECCOMENDATIONS FOR USE MUST BE CAREFULLY CONSIDERED AT ALL TIMES. 7. CONFINED SPACES EXCAVATION CONSTRUCTION OF THIS BUILDING AND SOME MAINTENANCE ON THE BUILDING WILL REQUIRE EXCAVATION AND INSTALLATION OF ITEMS WITHIN EXCAVATIONS. WHERE PRACTICAL, INSTALLATION SHOULD BE CARRIED OUT USING METHODS WHICH DO NOT REQUIRE WORKERS TO ENTER THE EXCAVATION. WHERE THIS IS NOT PRACTICAL, ADEQUATE SUPPORT FOR THE EXCAVATED AREA AHOULD BE PROVIDED TO PREVENT COLLAPSE. WARNING SIGNS AND BARRIERS TO PREVENT ACCIDENTAL OR UNAUTHORISED ACCESS TO ALL EXCAVATIONS SHOULD BE PROVIDED. ENCLOSED SPACES ENCLOSED SPACES WITHIN THE BUILDING MAY PREVENT A RISK TO PERSONS ENTERING FOR CONSTRUCTION, MAINTENANCE OR ANY OTHER PURPOSE. THE DESIGN DOCUMENTATION CALLS FOR WARNING SIGNS AND BARRIERS TO UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED THROUGHOUT THE LIFE OF THE BUILDING. WHERE WORKERS ARE REQUIRED TO ENTER ENCLOSED SPACES, AIR TESTING EQUIPMENT AND PERSONAL PROTECTIVE EQUIPMENT SHOULD BE PROVIDED. SMALL SPACES SOME SMALL SPACES WITHIN THIS BUILDING WILL REQUIRE ACCESS BY CONSTRUCTION OR MAINTENANCE WORKERS. THE DESIGN DOCUMENTATION CALLS FOR WARNING SIGNS AND BARRIERS TO UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED THROUGHOUT THE LIFE OF THE BUILDING. WHERE WORKERS ARE REQUIRED TO ENTER SMALL SPACES THEY SHOULD BE SCHEDULED FOR SHORT PERIODS OF TIME. MANUAL LIFTING AND OTHER MANUAL ACTIVITY SHOULD BE RESTRICTED IN SMALLSPACES. 8. PUBLIC ACCESS PUBLIC ACCESS TO CONSRTUCTION AND DEMOLITION SITES AND TO AREAS UNDER MAINTENANCE CAUSES RISK TO WORKERS AND PUBLIC. WARNING SIGNS AND SECURE BARRIERS TO UNAUTHORISED ACCESS SHOULD BE PROVIDED. WHERE ELECTRICAL INSTALLATIONS, EXCAVATIONS, PLANT OR LOOSE MATERIALS ARE PRESENT THEY SHOULD BE SECURED WHEN NOT FULLY SUPERVISED. 9. OPERATIONAL USE OF BUILDING THIS BUILDING HAS BEEN DESIGNED TO THE REQUIREMENTS OF SPECIFIC BUILDING CLASSIFICATION IDENTIFIED WITHIN THE DRAWINGS. WHERE A CHANGE OF USE OCCURS AT A LATER DATE A FURTHER ASSESSMENT OF THE WORKPLACE HEALTH AND SAFETY ISSUES SHOULD BE UNDERTAKEN, IN ACCORDANCE WITH THE PROVISIONS OF THE WORKPLACE HEALTH AND SAFETY ACT 2011 OR SUBSEQUENT REPLACEMENT ACT. (WHERE THE SPECIFIC USE OF THE BUILDING IS NOT KNOWN AT THE TIME OF THE COMPLETION OF THIS REPORT AND A FURTHER ASSESSMENT OF THE WORKPLACE HEALTH AND SAFETY ISSUES SHOULD BE UNDERTAKEN AT THE TIME OF THE FIT-OUT FOR THE END USER.) 10. OTHER HIGH RISK ACTIVITY ALL ELECTRICAL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE: MANAGING ELECTRICAL RISKS AT THE WORKPLACE, AS/NZ3012 AND ALL LICENSING REQUIREMENTS. ALL WORK USING PLANT SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE: MANAGING RISKS OF PLANT AT THE WORKPLACE. ALL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE: MANAGING NOISE AND PREVENTING HEARING LOSS AT WORK. DUE TO THE HISTORY OF SERIOUS INCIDENTS IT IS RECOMMENDED THAT PARTICULAR CARE BE EXERCISED WHEN UNDERTAKING WORK TRAFFIC MANAGEMENT PLAN SUPERVISED BY TRAINED TRAFFIC MANAGEMENT FAR BULK INSULATION MATERIAL. INVOLVING STEEL CONSTRUCTION AND CONCRETE PLACEMENT. ALL THE POINTS. PERSONNEL SHOULD BE ADOPTED FOR THE WORK SITE. ABOVE APPLIES. We reserve the fight ‘e ater designs colours and Please Read Carefully Builder: Client: . Title: Issue/Rev.| Plot Date Description Drawing No: Scale: N/A il been taken inthe preparation of this document the | This plan certified correctis the one referred to in the contract & Tu Projects Unit 1: 217.58 sqm |__cA_| 11/06/2014] Concept Drawings Designed By LY Shop 8 & 9 H20 Broadwater | Particulars contained herein are not to be! « acigcations and | understand change hereafter may not be ‘ Workplace Health & Safety | (),,: >: 217.58 sqm | €B (b) | 22/06/2014] Re-design as requested - alternate facade a rn Sos ae SE | oie tee pla supacdeal oe pens pas or detches Lot 1 No. 28 Nannygai Street Soe am oe Fee abta | Rael eae ne 2 or) 36 foowner PK oes Sandon ite sovvonts or agents for ony ene o| Owner /s Date. Noosaville Design Name: ta en [ep] 26/06/2014) Amendments as requested Checked 8) cy ¥ erinfooianthatdesgncomay | PEt, 5 sea oF agents for any evors a ststnentnnnsntnientnisnsnnsestneuee ots Unit 4: 222.41 sqm pa} 27/06/20141 Pre os q see y: www.iwantthatdesign.com.au_ ‘own enquiries to satisf emselves in relation to reuminal rawings Issuer voeamvaiarn ease suaizae [atime SY ‘emses THN OY OW ner / § annninenintnnnnannnninnieDARC cn QLD 4566 Custom Total: 876.07 sqm 7 3 Job No: 4416SM Intellectual Property: Designs cannot be copied in part or full All designs remain Intellectual Property of | Want That Design Pty Ltd at all times, with all rights reserved. Single use permission for construction, preliminary and marketing purposes will be granted only upon receiving full payment. Design files will NOT be released without prior written contractual agreement in advance of the design work being undertaken and clients acceptance of | Want That Design's Terms, Conditions of Trade, Rates and Service Notes. Full Terms & Conditions of Trade are available at wonw.iwantthatdesign.com.au_or contact orders@iwantthatdesiqn com.au to attain details. Attaining copyright in full or part will only be acknowledged in written format from the Director/s of | Want That Design. teamwork//Design-Mgr-PC/40 Nannygai Street - PA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0051 & OPW14/0274: APP A. Proposal PlansRelated documentApplication case desk ↗
MCU14/0051 & OPW14/0274: APP A. Proposal PlansRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.