INTEGRATED PLANNING ACT 1997

. en Version 19.0, 2 March 2007

 

Form 1 Development A

    

IDAS Assessment

Checklist

(Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

 

“This cheetilst was formesy referred ta as the “Referrals Checklist”. Same of the ‘Guides' lo using the IDAS Application Forms continue lo refer to Ihis document 2s the
“Roforrals Checks. The name of this checkst was changed from 25 July 2006 to more aocurally deseribe is function.

2 Under tha IPA and IDAS framework, an application may require assessmeni by the local Counc? andior ceviah Quecnsland Stale entiies (2.9. Environmental Protection
‘Agenoy, Dept, of Natural Resournes and Water, Cuueenstand Heritage Council etz:}

»

‘This chocklist is provided to assist applicants lo determine whan an application mquiras assess:neni by a Quoenstand State enlty and may also assist the applicant to

determina the assessment manages" for the application,

ena

‘Therefore, the completion of af] questions in section 4 of this checkdist is mandatory for all appicalions father than those requiring the completion of Parts A & Bonty).
111s the responsibly of the applicant to accurately completa this checklist

‘Section 2is mandatory onfy ithe proposed development is located in any part of a wid rer area declared under the Wiki Rivers Act 2005,

Depending on the nakire of the application, an applicable State entity may be either Ihe assessment managar or an [DAS referral agency for the appfication,

‘The assessment manayer forthe application wil ely on the information provided In this checklist (as well ax any material lodged in support of the appcation) fo identity

‘ayy applicable veferral agancies for lhe applicallon in the Acknowledgement NoGce, The assessment manager wit aso rely on this information wha identifying if the
‘coordination?

appication triggers rateura

9. To-assial you In answering the folowing questions a saries of guides aro available free from the IPA webske sww.ipa cf oov.au. Guide 25 exptains the role of the IDAS.
‘Assezsment Checklist in tha [DAS application proosss, and its retatonship to the Form 1 development application.

10. Any other parts of Form 1 Uxat this chocklist requires fo be completed are avaliable from the Councl or the applicable Stas eniity, or can be dowrdoaded tree trom
ews ipaald 207.04,

11. Section 3 provides advice ebout the referrals that can ba required for applications for buiding work assessable agains! the Buiding Reguiation 2006,

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The folowing stale aesessmani triggers apply lo development othar than for bullding work assessable against the Buikding Reguiztion 2006.

  

Environmentally relavant activity
For more information refer to Guida 4.
{Unless you anewered ‘none of tha ebove" Qt,
the eppicaion mqures assessment by the
‘pdkoicistenng authority’.

{an erty, other than the sdrinistoring

     
   

The appiication involves: tick applicable boxtes)

(1) an environmentally relevant activity (ERA) for which a code for environmental compliance
has not been made -complste Part G of Farm 4

(i) _amobile or temporary ERA for which a cade of environmental compliance has not been
Made - complete Part G of Form 1

[EX] (ii) none of the above

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, ai the time of lodgement, fails to provida the

completed (DAS Assessment Checklist (if applicabls).

 

OFFICE USE ONLY (applicable to assessment manager)

 

DATE RECEIVED

 

 

REFERENCE NUMBER/S '

 

 

 

1) Tha assamamment mensger i roaponaitie fr exsassing and daciding an IDAS appiceion. The eesessiment manager for an application is presenbadim echede 3A of the PA.
2. Fer additonal micrmaton rater o Guide B ‘Does cry appitcation digger ihe reierra coordination prncesa?”
3) The ‘ecraisetering aathority’ mary be chor the Ervsonsnental Prolactin Agency, the relevant loca govemment (for @ devctved ERA) or tha Queenatand Department of Pricary Induaties and

Frabwriaa (tr a dalagaind ERA).

Paget

INTEGRATED, AD. 1997

State-controlled road mattors

For more information rofer to Gado 3.

Unies you answered “none of the above fo 22,
the application figgens relerd to the Deoaamen!
ofan Roads (DUR) as acaterral agency.

In certain croumstances DMR wil be an advios:
axpncy, while in ober croumctances DUR wil

IDAS Assessment Checklist, Version 19.0, 2 March 2007
2. The application involves: (tick applicable boxes)
(1 ®@ development on land contiguous' to a Stata controlled road and for - *
(2 (a) material change of use assessable agains! the planning scheme;
DD ) reconfiguring 2 fot unless -
+ the total number of tots is not increased; and

 

 

be a concuranca agancy. « the tota! number of lots abutling the State-controlled road is not increased;
Schecide 201 fw Raadaion wi exsist you 11 (6) operational work (not essocioted with 0 meteial change of uso assessable agains! the
concurrence agency for Ihe applicaton. planning scheme or reconfiguring @ lot mentioned in (b) above)—
«associated with access to a State-contollad road; or
for filing or excavation; or
* involving the redirection or intensification of sita stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm¥ that directs stormwater to a
State-controfled road.
CO @ development on land not contiguous to a State-controlled road and -
C1 (a) material change of usa —
» assessable against the local government's planning scheme, and
+ mentioned in schedule § of the IP Regulation and exceeding the thresholds set by
that schedule;

(1 &) reconfiguring a tot tor a purpose mentioned In schedule 5 of the IP regulation

and exceeding the thresholds set _by that schedulo;

C1 () operational work (not associated with a material change af use assessable agains! the

planning scheme or reconfiguring a lot mentioned in (b) above}

assessable against the local government's planning scheme; and

¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds sel by

thal schedule,

{2 (i) none of the above

Clearing vegetation 3. The application involves: (tick applicable boxfes)
Fer more dormant Gath 12 (1 material change of use -
Se ete eres (a) assessable against the planning scheme;
Decent ot Nae Basra on Mt {b) on alot containing -
Wan aginoy ober fan NRW ise ssseseraent * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
mmarcagar for the application, NRW is 2 » if there is no property map of assessable vegetation for tha lot - remnant vegetation;
cxnaxreece agency fr fe sppcakon nahn {c) where the existing use of the tand is @ rural or environmental use; and
tying ca (yr plein ris (4) where the size of the land is 2 hectares or larger - complete Purt J of Form
ered NRW rect oes na Dqi) reconfiguring a lot -

(a) ona kot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegelation for
the lot, remnant vegetation;

{b) where the size of the lot before the reconfiguration is 2 hactares or larger,

(c) where 2 or more lats are created; and

(d)_ where the size of any lot created Is 25 hectares or smatiet - complete Part J of Form

Ci) operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 6 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i} or reconfiguring a lot mentioned in (fi) - complete Pat J of
Form 1

BR] (w)_ none of the above.
Strategic portland 4, The apptication involves:
rovaaaty hevamen Pett te (2.@ development on strategic port land as defined In the Transport Infrastructure Act 1994 (Tl
= he relevant Port Auth
sessment araoar fr he applcalon. Act) - complete Part of Form 1
{fyou Schad (@} Quaenstand Transports a DD @i) a material change of use that is inconsistent with the land use plan approved under the
‘enneurronce agency for the application. Tl Act for the strategic port land - complete Part ! of Form t

 

BR Gi) none of the above

 

4 Land configuocs In a Stato-contolled road is dened in schechée 14 of the 1P Resguinkon to masa laod - ¥ pest of be tond ia wehin 100m of fhe Stala-conteclied road, or that is partof# hvture State

contrated road,

Page2

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0616 - MCU - Multiple Houseing Type 2 Duplex [As Published].pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.