Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Approved Plans OPW21-0212

of 14

Page text read automatically using OCR, there may be inaccuracies

        Notes:
        - Place the rootball on a firm base.                                                                                 Notes:
        - Thoroughly water the root ball immediately after planting.                                                         - Place the rootball on a firm base.
        - Cultivate sides of excavated hole 50mm deep.                                                                       - Thoroughly water the root ball immediately after planting.
        - Do not disturb kerb, road pavement or road side drainage works.                                                    - Cultivate sides of excavated hole 50mm deep.
        - Tease out roots on side of rootball when planting.                                                                 - Do not disturb kerb, road pavement or road side drainage works.
        - Ensure top of rootball is not buried; expose and set flush with finished level.                                    - Tease out roots on side of rootball when planting.
                                                                                                                             - Ensure top of rootball is not buried; expose and set flush with finished level.
                                                                                            Set soil level at top of
                                                                                            rootball (at flare of trunk)
                                                                                                                                                                                                                                          Notes:
                                                                                            Pull away mulch                                                                                                                               - Place the rootball on a firmed base to achieve required FSL.
                                                                                            from base of plant                                                                                                                            - Thoroughly water the root ball immediately after planting.
                                                                                                                                                                                                                                          - Number of stakes will vary with pot size. Refer plant schedule.
                                                                                            Form mulch berm                                                                                                                               - Cultivate sides of excavated hole 50mm.
        50x50x2400 HW Timber stake:
        Place 600mm into the ground. Do                                                     to the perimeter of                                                                                                                                                                                                                                                              90mm∅ capped slotted pipe
        not place through rootball. Secure                                                  the rootball                     Hardwood stake: Place 600mm                                                                                                                                                                                                                     75mm below top of planter
        with hessian ties by looping in a                                                                                    into the ground. Do not place                                                                                                                                                                                                                   connected to drainage system
        figure eight pattern.                                                                                                through rootball. Secure with                                                                                                                                                                                                                   per Hydraulic Engineer
                                                                                                                             ties by looping in a figure eight                                                                                                                                                              River stone to
                                                                                                                             pattern.                                                                                                                                                                                       top of pipe
        Raise plant 20-30mm above                                                           Distance to local                                                                                                                             Hardwood Stake:                                                                                                                    Mulch
                                                                                            authority                        Raise plant 50mm above                                                                                                                                                                                                                          - refer to plans for organic or
        top of kerb.                                                                                                                                                                                                                      25x25x90mm Place 600mm
                                                                                            requirments                      finished surface level.                                                                                                                                                                                                                         inorganic locations
                                                                                                                                                                                                                                          into the ground. Do not
        Do not excavate                                                                                                      Mulch: Pull away from base                                                                                   place through rootball.
        within 50mm of                                                                                                       of plant.                                                                                                    Secure with ties by looping
                                                                                                                             Form an earthen basin                                                                                                                                                                                                                           Light weight podium mix per
        edge restraint or                                                                                                                                                                                                                 in a figure eight pattern.




                                                                                                                                                                                                                                                                                                                                                                    varies
                                                                                                                             around base of plant.                                                                                                                                                                                                                           specification
        pavement.                                                                             100
                                                                                                      Top of Kerb                                                                                                                         Mulch: Pull away from
                    FSL                                                                                                                                                                                                                   base of plant.                                                                                                                     Geotextile fabric
                                                                                                                                                                                                                                          Form an earthen basin                                                                                                              30mm Atlantis drainage cell
                             50                                                                                               Topsoil blend
                                          300




                                                                                                                                                                                                                  min 300
                                                                                                                                                                                                                                          around base of plant.                                                                                                              or similar approved
                                                                                                 2
        Topsoil blend                                                                                                        Water retention additive
                                  1                                                          1                                                                                                                                                                                                                                                                               Topping slab - If required.
                                      1                                                                                      Fertiliser: Do not allow                                                         1                                                                                                                                                              Depth varies to achieve falls
                                                                                                                                                                                                                                          Topsoil blend                                                                                                                      to drain.
                                                                                                                             fertiliser to come in                                                        1
        Bio-degradable Geo-fabric                                                                                                                                                                                                         Fertiliser: Do not allow
                                                                                                                             contact with roots.                                                                                                                                                                                                                             Waterproofing and protection
        Water retention                                                                                                                                                                                                                   contact with roots.
                                                                                                                                                                             width (w)                                                                                                                                                                                       - to Architect's Specification.
        additive                                                                                                             10 - 20mm Drainage gravel
                                                                                                                                                                               2xw                                                                                                                                                                                           Podium / basement slab
        100mm drainage gravel in                                                                                                                                                                                                          Water retention additive
                                                                                                                                                                                                                                                                                                                                                                             - refer Engineer's detail.
        heavy or poor draining soils.                                                            Connect drainage gravel
                                                                                                 to back of kerb, subsoil
        Incorporate slow release organic
        fertilizer and water retention
                                                                                                 drainage where
                                                                                                 applicable                    2 45-200ltr PLANTING                                                                                              3 140-300mm PLANTING                                                                             4 PODIUM PLANTER
        additives to backfill per                                                                                            CD-200 1:10@A1, 1:20@A3                                                                                           CD-200 1:10@A1, 1:20@A3                                                                          CD-200 1:10@A1, 1:20@A3
        Manufacturer's recommendations

                                                                                                                                  FSL
              1 STREET TREE PLANTING                                                                                                                                                                Mulch
           CD-200 1:10@A1, 1:20@A3                                                                                                                                                                  - to 100mm depth
                  All trees to have 100% NATSPEC inspection prior to delivery to site
                                                                                                                                                                                                    Soil blend or site topsoil
                                                                                                                                                                                                    - to 300mm depth

           Notes:                                                           FSL
                                                                                              (X)




           - All timber to be CCA pressure treated to
                                                                                                                                                                                                    Cultivated subgrade
           AS1604, Hazard 5, rough sawn pine.                                                        Timber edge                                                                                    - to 150mm depth
           - All timber edges to be arissed to comply
           with council standards.
           - All timber ends to have one coat of                                                     Stakes
           Cuprinol or equal prior to installation.
           - Stakes to be 400mm into ground at max.
           1200mm centres, or as required to obtain                                                  Existing/compacted
           smooth curves. Top of stake to finish                                                     /subgrade/subase
           20mm below top of timber edge. Where
           timber edges meet at corners provide                                                                                      6 GARDEN BED TYPE 1                                                                                         7 GARDEN BED TYPE 2
           double stakes.                                                                                                         CD-200 1:10@A1, 1:20@A3                                                                                     CD-200 1:10@A1, 1:20@A3
           - All fixings to be hot dipped galv.
           - Leading edge is to be free of burrs and
           splinters.                                                                                                                                                                            Turf as specified



                                                                                                                                                                                                                                          Street trees must be set back
                                                                                                                                                                                                 Topsoil
            TIMBER EDGE           STAKES        (X) = Height above                                                                                                                               - to 100mm depth
                 38                 50          finished surface level     FIXINGS
                                                                                                                                                                                                 Cultivate subgrade


                                                                                                                                                                                                                                          1.0m behind back of kerb.
                                                                               50mm Bugle Headed                                                                                                 - to 150mm depth
                                                   FLUSH
                                                                               Batten Screws.
             100




                                                    20mm                       75mm Bugle Headed                                                                                                 Existing subgrade


                                                                                                                                                                                                                                          Refer to approval conditions.
                                                                               Batten Screws.
                                                    100mm
                                                                               100mm Bugle Headed
                                                    150mm                      Batten screws.
            100x38mm

                                  50x50mm
                                                                                                                                   8 TURF PROFILE
              5 EDGE TYPE 1- STREET TREES
           CD-200 1:5@A1, 1:10@A3
                                                                                                                            Turf profile    scale 1:5
                                                                                                                                                 CD-200 1:5@A1, 1:10@A3


                  Timber garden edge



                                                                                                                 NOOSA COUNCIL
                                                                                                                APPROVED PLANS
                                                                                                                                                                                                                                                                     Revision         Date                   Amendment                  Drawn        Checked
                                                                                                              OPW21/0212 24 AUG 2021                                                                                             APPROVAL ONLY
CONSTRUCTION DETAILS
                                                                                                                                                                                                                                                                         A         2021.07.14              For Approval                   XL           CS
                                                                                                                                                                                                                                 NOT FOR CONSTRUCTION                    B         2021.07.14              For Approval                   XL           CS
                                                                                                               As annotated by Council                                                                                                                                   C         2021.07.20              For Approval                   XL           CS
CD-200                                                                      scale as noted                                                                                                                                                                               D         2021.08.10       RFI Response - For Approval           CS           CS



31 BOTTLEBRUSH AVENUE, NOOSA HEADS
20281                       COLE PROJECTS QLD PTY LTD

Log in to download the original (Approved Plans OPW21-0212.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.