Approved Plans OPW21-0212
Notes:
- Place the rootball on a firm base. Notes:
- Thoroughly water the root ball immediately after planting. - Place the rootball on a firm base.
- Cultivate sides of excavated hole 50mm deep. - Thoroughly water the root ball immediately after planting.
- Do not disturb kerb, road pavement or road side drainage works. - Cultivate sides of excavated hole 50mm deep.
- Tease out roots on side of rootball when planting. - Do not disturb kerb, road pavement or road side drainage works.
- Ensure top of rootball is not buried; expose and set flush with finished level. - Tease out roots on side of rootball when planting.
- Ensure top of rootball is not buried; expose and set flush with finished level.
Set soil level at top of
rootball (at flare of trunk)
Notes:
Pull away mulch - Place the rootball on a firmed base to achieve required FSL.
from base of plant - Thoroughly water the root ball immediately after planting.
- Number of stakes will vary with pot size. Refer plant schedule.
Form mulch berm - Cultivate sides of excavated hole 50mm.
50x50x2400 HW Timber stake:
Place 600mm into the ground. Do to the perimeter of 90mm∅ capped slotted pipe
not place through rootball. Secure the rootball Hardwood stake: Place 600mm 75mm below top of planter
with hessian ties by looping in a into the ground. Do not place connected to drainage system
figure eight pattern. through rootball. Secure with per Hydraulic Engineer
ties by looping in a figure eight River stone to
pattern. top of pipe
Raise plant 20-30mm above Distance to local Hardwood Stake: Mulch
authority Raise plant 50mm above - refer to plans for organic or
top of kerb. 25x25x90mm Place 600mm
requirments finished surface level. inorganic locations
into the ground. Do not
Do not excavate Mulch: Pull away from base place through rootball.
within 50mm of of plant. Secure with ties by looping
Form an earthen basin Light weight podium mix per
edge restraint or in a figure eight pattern.
varies
around base of plant. specification
pavement. 100
Top of Kerb Mulch: Pull away from
FSL base of plant. Geotextile fabric
Form an earthen basin 30mm Atlantis drainage cell
50 Topsoil blend
300
min 300
around base of plant. or similar approved
2
Topsoil blend Water retention additive
1 1 Topping slab - If required.
1 Fertiliser: Do not allow 1 Depth varies to achieve falls
Topsoil blend to drain.
fertiliser to come in 1
Bio-degradable Geo-fabric Fertiliser: Do not allow
contact with roots. Waterproofing and protection
Water retention contact with roots.
width (w) - to Architect's Specification.
additive 10 - 20mm Drainage gravel
2xw Podium / basement slab
100mm drainage gravel in Water retention additive
- refer Engineer's detail.
heavy or poor draining soils. Connect drainage gravel
to back of kerb, subsoil
Incorporate slow release organic
fertilizer and water retention
drainage where
applicable 2 45-200ltr PLANTING 3 140-300mm PLANTING 4 PODIUM PLANTER
additives to backfill per CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3
Manufacturer's recommendations
FSL
1 STREET TREE PLANTING Mulch
CD-200 1:10@A1, 1:20@A3 - to 100mm depth
All trees to have 100% NATSPEC inspection prior to delivery to site
Soil blend or site topsoil
- to 300mm depth
Notes: FSL
(X)
- All timber to be CCA pressure treated to
Cultivated subgrade
AS1604, Hazard 5, rough sawn pine. Timber edge - to 150mm depth
- All timber edges to be arissed to comply
with council standards.
- All timber ends to have one coat of Stakes
Cuprinol or equal prior to installation.
- Stakes to be 400mm into ground at max.
1200mm centres, or as required to obtain Existing/compacted
smooth curves. Top of stake to finish /subgrade/subase
20mm below top of timber edge. Where
timber edges meet at corners provide 6 GARDEN BED TYPE 1 7 GARDEN BED TYPE 2
double stakes. CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3
- All fixings to be hot dipped galv.
- Leading edge is to be free of burrs and
splinters. Turf as specified
Street trees must be set back
Topsoil
TIMBER EDGE STAKES (X) = Height above - to 100mm depth
38 50 finished surface level FIXINGS
Cultivate subgrade
1.0m behind back of kerb.
50mm Bugle Headed - to 150mm depth
FLUSH
Batten Screws.
100
20mm 75mm Bugle Headed Existing subgrade
Refer to approval conditions.
Batten Screws.
100mm
100mm Bugle Headed
150mm Batten screws.
100x38mm
50x50mm
8 TURF PROFILE
5 EDGE TYPE 1- STREET TREES
CD-200 1:5@A1, 1:10@A3
Turf profile scale 1:5
CD-200 1:5@A1, 1:10@A3
Timber garden edge
NOOSA COUNCIL
APPROVED PLANS
Revision Date Amendment Drawn Checked
OPW21/0212 24 AUG 2021 APPROVAL ONLY
CONSTRUCTION DETAILS
A 2021.07.14 For Approval XL CS
NOT FOR CONSTRUCTION B 2021.07.14 For Approval XL CS
As annotated by Council C 2021.07.20 For Approval XL CS
CD-200 scale as noted D 2021.08.10 RFI Response - For Approval CS CS
31 BOTTLEBRUSH AVENUE, NOOSA HEADS
20281 COLE PROJECTS QLD PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Approved Plans OPW21-0212.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.