Information Request Response Lot 22 · MCU22/0038

of 13

Text shows just the words. Original shows the document exactly as it was published.

Our Response

MPN Consulting have prepared an attached letter responding to this specific RFI item, refer Appendix
B, with the relevant commentary extracted below.


      All earthworks have been revised to be fully contained within the development site and do not
      extend over the boundary. Any works completed within the vicinity of existing trees to be retained
      will be completed under the supervision of the project arborist as required.




Council Item 7 – Footpath

The submitted documentation (drawing “Stormwater Treatment Plan”, CP.1.01, Rev A, prepared by MPN
Consulting) indicates that the existing footpath, to the frontage of the subject property, is to be removed
and replaced with a new 1.8m wide one. The existing footpath is 2m wide.


INFORMATION REQUIRED


Submit amended plans showing all proposed footpaths to be 2m wide.


Our Response

All plans have been amended to show paths to be 2m wide.




                                                                                                      | 11

Used in these records

About this file

File size
127 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Request Response Lot 22.pdf · 127 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.