Council archive · source document
Information Request Response Lot 22 · MCU22/0038
Council Item 9 – B99 turn around in Basement 02
From the provided documentation it is not clear that a B99 vehicle will be able to turn around at the
proposed Turn Around Bay located on the NE corner of Basement 02 using a maximum 3 point turn
manoeuvre.
INFORMATION REQUIRED
Provide travel paths for a B99 vehicle, demonstrating how it will turn around at the proposed Turn
Around Bay located on the NE corner of Basement 02, without having to use more than a 3 point turn
to do so.
Our Response
SLR have prepared an attached letter responding to this specific RFI item, refer Appendix C, with the
relevant commentary extracted below.
To inform NSC’s assessment of the application, the following clarifications are provided:
· Please refer to Attachment B Figure 6 which shows a modification to the Storage/Plant area to
accommodate a B99 three-point turn within Basement 02.
3. CONCLUSION
Thank you for your attention to this matter. Should you have any further queries regarding this
application, please contact the undersigned on (07) 3666 5200.
Yours sincerely,
Brad Jones
Director of Planning
Wolter Consulting Group
| 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Request Response Lot 22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 127 KB (small file)
- File type
No other editions are linked here.