Original source · versioned page text
Engineering Plans
Plans and drawings: the text below has words only, no drawings.
200 Water Levet | e D VERTICAL BARS Sg L~_| —_ ° I 4-S12 in 1500 MAX | S12 @ 300 crs b ring beam 1800 MAX | S12 Bars @ 300 crs l THIS DRAWING REMAINS/THE PROPERTY OF le LINDSAY CONSULTING PTY LTD AND IS FOR S12 Intermediates @ 300 crs THE SOLE USE OF THE CLIENT. NO PART ° MAY BE USED IN PART OR WHOLE WITHOUT PRIOR EXPRESS WRITTEN CONSENT OF % i LINDSAY CONSULTING PTY LTD 2 Vertical bars refer table, ———T™|P CLIENT AND PROJECT DESCRIPTION € S12 Horizontals @ 125 crs . E 75mm cover to inside of pool ! 100 Max POOLS BY DESIGN gS l PROPOSED POOL 7 r c NO.5 SEAMIST CRT a r o SUNSHINE BEACH L = a I, 400 Radius min & DRAWING TITLE S12 @ 150 CRS each 3 way in base N12 starters @ 400 y x veers REINFORCEMENT CRS to pool base. l DETAIL 2 450 min. lap. |, = a L E \ S SCALES st > > > 7 = > 7 7 > oF > > > oF > > > oF > > oO | ° ° ! cons taucriq JOINT x 190mm core filled blockwork with N12 @ = 400 crs eachjway r UNCONTROLLED GRAVEL BACKFILL 8 ble SURVEY DATUM r r N12 starters |@ 400 CRS 450mm min. lap. ASSOCIATED CONSULTANTS NATURAL SURFACE RYYXRY RYO | TTT RPYAY AY AY AY AY AY DY] lt 600 x 600 footing _ — with 4-N12 top and bottom ff. nh. R10 ligs at 200 CRS $12 bar through top of screw pile (1000 mm long) REVISION LIST A | ORIGINAL ISSUE 16/11/23 Screw Piles (120 kN SWwL)) | Screw Piles (120 kN SWL)) ponevter Fe 231061PL.DWG SECTION THROUGH ABOVE GROUND POOL awe — 23-1061-PL3 3)A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original