Original source · versioned page text
2ND RFI - (RECEIVED 30.6.25) 37 Bottlebrush Rev-L
Very large file (22.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
4,390
4,680
2º DEG PITCH
9
04
9,
90 4,410+40.520 90 3,520
+40.520 90 0
1,578 54
5,
4,235
4,235
ROOF TERRACE ROOF TERRACE
FF: ET01 FF: ET01
A: 14.60 m2 A: 17.87 m2
RAISED PLANTER 2º DEG PITCH
825
825
2º DEG PITCH
4,923
4,502
0 0.5 1 2.5 5
SCALE 1: 100
B L A C K Bottlebrush Noosa
ROOF PLAN
W O O D
DA2.04
Scale Project No. Date Revision For Traction Property Co.
1:100 @ A3 202424 19/05/2025 L 37 Bottlebrush Ave, Noosa Heads, QLD, 4567
a r c h i t e c t u r e & d e s i g n
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.