APPENDIX D – SPP AND SDAP CHECKLIST AND
ASSESSMENT BENCHMARKS




                                          1


[OCR of page images]
—
URBIS
De

 

APPENDIX D - SPP AND SDAP CHECKLIST AND
ASSESSMENT BENCHMARKS
Log in to download the original file

7. Appendix D - SPP SDAP Checklists and Assessment Benchmarks.pdf · 223 KB (small file)

Full text of the other 26 pages

Page 2

SPP CHECKLIST
Matters of State Planning         Type   Relevant to Development /              Assessment
Interest         Scheme                  Trigger                                Required
                 Reflects State
                 Interest*
Housing Supply No                 No Assessment Benchmarks
and Diversity
Liveable         No               MCU    A development application in an    No
Communities                              urban area involving premises that
                                  ROL    is, or will be, accessed by common N/A
                                         private title, for:
                                         Application involving buildings –
                                         either attached or detached – that
                                         are not covered by other legislation
                                         or planning provisions mandating
                                         fire hydrants.
Agriculture      No               No Assessment Benchmarks

Development and No                No Assessment Benchmarks
Construction
Mining and       No               ROL    Within a Key Resource Area (KRA) N/A
Extractive
Resources                         MCU    Within the resource/ processing        No
                                         area of a KRA or the separation
                                         area for the resource/processing
                                         area of a KRA, unless for:
                                         (a) dwelling house on an existing
                                         lot, or
                                         (b) home-based business (where
                                         not employing more than two non-
                                         resident people on a full-time
                                         equivalent basis), or
                                         (c) caretaker’s accommodation
                                         (associated with an extractive
                                         industry), or
                                         (d) animal husbandry, or
                                         (e) cropping.
                                  MCU    Within the transport routes          No
                                         separation area of a KRA that will
                                         result in an increase in the number
                                         of people working or residing in the


                                                                                             2

Page 3

Matters of State Planning         Type    Relevant to Development /             Assessment
Interest         Scheme                   Trigger                               Required
                 Reflects State
                 Interest*
                                          transport route separation area,
                                          unless for:
                                          (a) dwelling house on an existing
                                          lot, or
                                          (b) home-based business (where
                                          not employing more than two non-
                                          resident people on a full-time
                                          equivalent basis), or
                                          (c) caretaker’s accommodation
                                          (associated with an extractive
                                          industry), or
                                          (d) animal husbandry, or
                                          (e) cropping.
Tourism          No               No Assessment Benchmarks

Biodiversity     No               No Assessment Benchmarks

Coastal          No               No Assessment Benchmarks
Environment
Cultural Heritage No              No Assessment Benchmarks

Water Quality    No               MCU     for an urban purpose that involves    No
                                          premises 2,500m² or greater and;
                                          (a) will result in 6 or more
                                          dwellings; or
                                          (b) will result in an impervious
                                          area greater than 25%
                                          of the net developable area
                 No               MCU     Where located wholly outside an       No
                                          urban area and relating to
                                          premises that is within, or partly
                                          within, a water supply buffer area,
                                          that involves:
                                         a) intensive animal industry,
                                         b) medium and high-impact
                                            industry,



                                                                                             3

Page 4

Matters of State Planning         Type    Relevant to Development /                   Assessment
Interest         Scheme                   Trigger                                     Required
                 Reflects State
                 Interest*
                                         c) noxious and hazardous industry,
                                         d) extractive industry,
                                         e) utility installation that involves
                                            sewerage services, drainage or
                                            stormwater services,
                                         f)   waste management facilities, or
                                         g) motor sport facility
                 No               ROL     For an urban purpose that involves N/A
                                          premises 2,500m² or and will result
                                          in 6 or more lots.
                 No               ROL     Where located wholly outside an             N/A
                                          urban area and relating to
                                          premises that is within, or partly
                                          within, a water supply buffer area,
                                          that involves:
                                          Creating 5 or more additional lots if
                                          any resultant lot is less than 16Ha,
                                          and any of the lots created will rely
                                          on on-site wastewater treatment.
                 No               OPW     for an urban purpose that involves          N/A
                                          disturbing a land area 2,500m² or
                                          greater.
Emissions and    No               No Assessment Benchmarks
Hazardous
Activities
Natural Hazards, No               MCU     Where in any of the following:              No
Risk and         No               ROL     (1) bushfire prone areas                    N/A
Resilience
                                          (2) flood hazard areas
                 No               OPW                                                 N/A
                                          (3) landslide hazard areas
                                          (4) storm tide inundation areas
                                          (5) erosion prone area
                                          Note: There are specific assessment
                                          benchmarks which apply for erosion prone
                                          areas in the coastal management district,
                                          separate to other natural hazards.




                                                                                                   4

Page 5

Matters of State Planning         Type    Relevant to Development /                  Assessment
Interest         Scheme                   Trigger                                    Required
                 Reflects State
                 Interest*
Energy and       No               No Assessment Benchmarks
Water Supply
Infrastructure    No              No Assessment Benchmarks
Integration
Transport         No              No Assessment Benchmarks
Infrastructure
Strategic Airports No             MCU     Where:                                     No
and Aviation
                                         a) A premises that will result in a
Facilities
                                            building, structure or associated
                                            activity intruding into the
                                            operational airspace of a
                                            strategic airport; or
                                         b) any part of the premises is
                                            within the light restriction zone
                                            or lighting area buffer of a
                                            strategic airport; or
                                         c) any part of the premises is
                                            within a wildlife hazard buffer
                                            zone of a strategic airport; or
                                         d) any part of the premises is
                                            within a public safety area of a
                                            strategic airport; or
                                         e) any part of the premises is
                                            within the 20 ANEF contour or
                                            greater for a strategic airport; or
                                         f)   A premises that will result in a
                                              building, structure or associated
                                              activity intruding into the building
                                              restricted area of an aviation
                                              facility.


                  No              ROL     Where:                                     N/A
                                         a) any part of the premises is
                                            within a public safety area of a
                                            strategic airport; or




                                                                                                  5

Page 6

Matters of State Planning         Type    Relevant to Development /              Assessment
Interest         Scheme                   Trigger                                Required
                 Reflects State
                 Interest*
                                         b) any part of the premises is
                                            within the 20 ANEF contour or
                                            greater for a strategic airport
                  No              BW      Where not associated with an           N/A
                                          MCU and:
                                          a) will result in a building,
                                             structure or associated activity
                                             intruding into the building
                                             restricted area of an aviation
                                             facility.
                                          b) any part of the premises is
                                             within the light restriction zone
                                             or lighting area buffer of a
                                             strategic airport; or
                                          c) A premises that will result in a
                                             building, structure or
                                             associated activity intruding
                                             into the building restricted area
                                             of an aviation facility.
                  No              OPW     Where not associated with an           N/A
                                          MCU and:
                                          a) the work or associated activity
                                             will intrude into the operational
                                             airspace of a strategic airport;
                                             or
                                          b) any part of the premises is
                                             within the light restriction zone
                                             or lighting area buffer of a
                                             strategic airport; or
                                          c) the work or associated activity
                                             will intrude into the building
                                             restricted area of an aviation
                                             facility.
Strategic Ports   No              No Assessment Benchmarks




                                                                                              6

Page 7

SDAP CHECKLIST
Matters of       Type             Referral   Relevant            Relevant State Codes
State Interest                    Required   Provisions of the
                                             Regulation
Aquaculture      MCU              No         Schedule 10,        State code 17: Aquaculture
                                             Part 6, Division 1,
                                             Subdivision 3,
                                             Table 1
Environmentally MCU               No         Schedule 10,        State code 22: Environmentally
relevant                                     Part 5, Division 4, relevant activities
activities                                   Table 1
Fish habitat    Build. Works      N/A        Schedule 9, Part      State code 12: Development in
area – works or                              3, Table 2            a declared fish habitat area
other
                Op. Works         N/A        Schedule 10,
development
                                             Part 6, Division 2,
                                             Subdivision 3,
                                             Table 1
Marine Plants – Op. Works         N/A        Schedule 10,        State code 11: Removal,
removal,                                     Part 6, Division 3, destruction or damage of
destruction or                               Subdivision 3,      marine plants
damage                                       Table 1
                 RoL where        N/A        Schedule 10,
                 involving Op.               Part 6, Division 3,
                 Works for the               Subdivision 3,
                 removal,                    Table 2
                 destruction or
                 damage to
                 marine plants
                 MCU where        N/A        Schedule 10,
                 involving Op.               Part 6, Division 3,
                 Works for the               Subdivision 3,
                 removal,                    Table 2
                 destruction or
                 damage to
                 marine plants
Native           RoL              N/A        Schedule 10,        State code 16: Native
vegetation                                   Part 3, Division 4, vegetation clearing
clearing                                     Table 2
                 Op. Works        N/A        Schedule 10,
                                             Part 3, Division 4,
                                             Table 1




                                                                                                   7

Page 8

Matters of       Type           Referral   Relevant            Relevant State Codes
State Interest                  Required   Provisions of the
                                           Regulation
                 MCU            No         Schedule 10,
                                           Part 3, Division 4,
                                           Table 3
Queensland       Build. Works   No         Part 8, Division 1, State code 14: Queensland
heritage                                   Subdivision 1       heritage
                 Various aspects No        Schedule 10,
                 of Dev.                   Part 8, Division 2,
                                           Subdivision 3
Tidal works or   MCU            No         Schedule 10,          State code 8: Coastal
development in                             Part 17, Division     development and tidal works
a coastal                                  3, Table 6
management
district
                 RoL            N/A        Schedule 10,
                                           Part 17, Division
                                           3, Table 5
                 Op. Works      N/A        Schedule 10,
                                           Part 17, Division
                                           3, Table 1
                                           Schedule 10,
                                           Part 17, Division
                                           3, Table 2
                                           Schedule 10,
                                           Part 17, Division
                                           3, Table 3
                                           Schedule 10,
                                           Part 17, Division
                                           3, Table 4
                 Build. Works   N/A        Schedule 9, Part
                                           3, Division 1,
                                           Table 1
Water – taking   Op. Works      N/A        Schedule 10,          State code 10: Taking or
or interfering                             Part 19, Division     interfering with water
with                                       1, Subdivision 3,
                                           Table 1
Watercourse or All aspects of   No         Schedule 10,          State code 15: Removal of
lake – removal Dev.                        Part 19, Division     quarry material from a
of quarry                                  2, Subdivision 3,     watercourse, lake or estuary
material                                   Table 1



                                                                                                8

Page 9

Matters of        Type        Referral   Relevant          Relevant State Codes
State Interest                Required   Provisions of the
                                         Regulation
Category 3        Op. Works   N/A        Schedule 10,      State code 19: Category 3
levees                                   Part 19, Division levees
                                         4, Subdivision 3,
                                         Table 1
Waterway          Op. Works   N/A        Schedule 10,        State code 18: Construction or
barrier works –                          Part 6, Division 4, raising waterway barrier works
constructing or                          Subdivision 3,      in fish habitats
raising                                  Table 1
Wetland – land    RoL         N/A        Schedule 10,          State code 9: Great Barrier
in or near                               Part 20, Division     Reef wetland protection areas
                                         4, Table 2
                  MCU         No         Schedule 10,
                                         Part 20, Division
                                         4, Table 3
                  Op. Works   N/A        Schedule 10,
                                         Part 20, Division
                                         4, Table 1
Unexploded        RoL         N/A        Schedule 10,        State code 13: Unexploded
ordnance                                 Part 4, Division 2, ordnance
(UXO)                                    Table 1
                  MCU                    Schedule 10,
                                         Part 4, Division 2,
                                         Table 1
Referable dams Op. Works      N/A        Schedule 10,          State code 20: Referable dams
                                         Part 19, Division
                                         3, Subdivision 3,
                                         Table 1
Maritime safety Op. Works     N/A        Schedule 10,          State code 7: Maritime safety
                                         Part 17, Division
                                         3, Table 2




                                                                                               9

Page 10

Matters of        Type           Referral   Relevant           Relevant State Codes
State Interest                   Required   Provisions of the
                                            Regulation
State transport   Build. Works   N/A        Schedule 9, Part If near a state controlled road
corridors                                   3, Division 1,     or future state controlled
                                            Table 3 – State    road:
                                            transport corridor
                                                               State code 1: Development in a
                                                               state-controlled road
                                                               environment
                                                               In near a railway corridor or
                                                               future railway corridor:
                                                               State code 2: Development in a
                                                               railway environment

                                            Schedule 9, Part   If near a busway corridor or
                                            3, Division 1,     future busway corridor:
                                            Table 4 – Future   State code 3: Development in a
                                            state transport    busway environment
                                            corridor
                                                               If near a light rail corridor or
                                                               future light rail corridor:
                                                               State code 4: Development in a
                                                               light rail environment




                  RoL            N/A        Schedule 10,        If near a state controlled road
                                            Part 9, Division 4, or future state controlled
                                            Subdivision 2,      road:
                                            Table 1 (STC)
                                                                State code 1: Development in a
                                            Schedule 10,        state-controlled road
                                            Part 9, Division 4, environment
                                            Subdivision 2,
                                                                In near a railway corridor or
                                            Table 2 (future
                                                                future railway corridor:
                                            STC)
                                                                State code 2: Development in a
                                            Schedule 10,
                                                                railway environment
                                            Part 9, Division 4,
                                            Subdivision 2,      If near a busway corridor or
                                            Table 3 (SCR        future busway corridor:
                                            Intersection)       State code 3: Development in a
                                                               busway environment
                                                               If near a light rail corridor or
                                                               future light rail corridor:
                                                               State code 4: Development in a
                                                               light rail environment


                                                                                               10

Page 11

Matters of       Type         Referral   Relevant            Relevant State Codes
State Interest                Required   Provisions of the
                                         Regulation
                 MCU or Op.   No         Schedule 10,        If near a state controlled road
                 Works                   Part 9, Division 4, or future state controlled
                                         Subdivision 2,      road:
                                         Table 4 (STC and
                                                             State code 1: Development in a
                                         future STC)
                                                             state-controlled road
                                                             environment
                                                            In near a railway corridor or
                                                            future railway corridor:
                                                            State code 2: Development in a
                                                            railway environment
                                                            If near a busway corridor or
                                                            future busway corridor:
                                                            State code 3: Development in a
                                                            busway environment
                                                            If near a light rail corridor or
                                                            future light rail corridor:
                                                            State code 4: Development in a
                                                            light rail environment
                 Op. Works    No         Schedule 10,        If near a state controlled road
                                         Part 9, Division 4, or future state controlled
                                         Subdivision 2,      road:
                                         Table 5 (STC)
                                                             State code 1: Development in a
                                         Schedule 10,        state-controlled road
                                         Part 9, Division 4, environment
                                         Subdivision 2,
                                                             In near a railway corridor or
                                         Table 6 (Future
                                                             future railway corridor:
                                         STC)
                                                             State code 2: Development in a
                                                             railway environment
                                                            If near a busway corridor or
                                                            future busway corridor:
                                                            State code 3: Development in a
                                                            busway environment
                                                            If near a light rail corridor or
                                                            future light rail corridor:
                                                            State code 4: Development in a
                                                            light rail environment




                                                                                            11

Page 12

Matters of       Type           Referral   Relevant          Relevant State Codes
State Interest                  Required   Provisions of the
                                           Regulation
State transport Various         Yes        Schedule 10,      State code 6: Protection of
infrastructure aspects of                  Part 9, Division state transport networks
(thresholds)    Dev.                       4, Subdivision 1,
                                           Table 1
State-controlled RoL            N/A        Schedule 10,        State code 5: Development in a
transport                                  Part 9, Division 4, state-controlled transport tunnel
tunnels                                    Subdivision 3,      environment
                                           Table 1 (STT and
                                           future STT)
                 MCU            No         Schedule 10,
                                           Part 9, Division 4,
                                           Subdivision 3,
                                           Table 2 (STT and
                                           future STT)
                 Op. Works      N/A        Schedule 10,
                                           Part 9, Division 4,
                                           Subdivision 3,
                                           Table 3 (STT and
                                           future STT)
Brisbane core    Op. Works –    N/A        Schedule 10,          If near a state controlled road
port land        near a state              Part 13, Division     or future state controlled
                 transport                 1, Subdivision 2,     road:
                 corridor                  Table 2
                                                                 State code 1: Development in a
                                                                 state-controlled road
                                                                 environment
                                                                 In near a railway corridor or
                                                                 future railway corridor:
                                                                 State code 2: Development in a
                                                                 railway environment
                                                                 If near a busway corridor or
                                                                 future busway corridor:
                                                                 State code 3: Development in a
                                                                 busway environment
                                                                 If near a light rail corridor or
                                                                 future light rail corridor:
                                                                 State code 4: Development in a
                                                                 light rail environment




                                                                                                 12

Page 13

Matters of       Type              Referral   Relevant          Relevant State Codes
State Interest                     Required   Provisions of the
                                              Regulation
                 Op. Works –       N/A        Schedule 10,      If near a state controlled road
                 near a future                Part 13, Division or future state controlled
                 state transport              1, Subdivision 2, road:
                 corridor                     Table 3
                                                                State code 1: Development in a
                                                                state-controlled road
                                                                environment
                                                                  In near a railway corridor or
                                                                  future railway corridor:
                                                                  State code 2: Development in a
                                                                  railway environment
                                                                  If near a busway corridor or
                                                                  future busway corridor:
                                                                  State code 3: Development in a
                                                                  busway environment
                                                                  If near a light rail corridor or
                                                                  future light rail corridor:
                                                                  State code 4: Development in a
                                                                  light rail environment
                 MCU – near a      No         Schedule 10,        If near a state controlled road
                 state transport              Part 13, Division   or future state controlled
                 corridor or that             1, Subdivision 2,   road:
                 is a future state            Table 4
                                                                  State code 1: Development in a
                 transport
                                                                  state-controlled road
                 corridor
                                                                  environment
                                                                  In near a railway corridor or
                                                                  future railway corridor:
                                                                  State code 2: Development in a
                                                                  railway environment
                                                                  If near a busway corridor or
                                                                  future busway corridor:
                                                                  State code 3: Development in a
                                                                  busway environment
                                                                  If near a light rail corridor or
                                                                  future light rail corridor:
                                                                  State code 4: Development in a
                                                                  light rail environment
                 MCU of          No           Schedule 10,        State code 22: Environmentally
                 premises for an              Part 13, Division   relevant activities


                                                                                                  13

Page 14

Matters of       Type                Referral   Relevant          Relevant State Codes
State Interest                       Required   Provisions of the
                                                Regulation
                 environmentally                1, Subdivision 2,
                 relevant activity              Table 6
                 MCU or Op.          No         Schedule 10,        State code 7: Maritime safety
                 Works – tidal                  Part 13, Division
                                                                    AND
                 works or works                 1, Subdivision 2,
                 in a coastal                   Table 7             State code 8: Coastal
                 management                                         development and tidal works
                 district

                 MCU –             No           Schedule 10,        State code 21: Hazardous
                 hazardous                      Part 13, Division   chemical facilities
                 chemical facility              1, Subdivision 2,
                                                Table 8
                 Op. Works –         N/A        Schedule 10,        State code 10: Taking or
                 taking or                      Part 13, Division   interfering with water
                 interfering with               1, Subdivision 2,
                 water                          Table 9
                 Op. Works –     N/A            Schedule 10,        State code 20: Referable dams
                 particular dams                Part 13, Division
                                                1, Subdivision 2,
                                                Table 10
                 MCU or Op.          No         Schedule 10,        State code 12: Development in
                 Works –                        Part 13, Division   a declared fish habitat area
                 relating to                    1, Subdivision 2,
                                                                    OR
                 fisheries                      Table 11
                                                                    State code 11: Removal,
                                                                    destruction or damage of
                                                                    marine plants
                                                                    OR
                                                                    State code 17: Aquaculture
                                                                    OR
                                                                    State code 18: Constructing or
                                                                    raising waterway barrier works
                                                                    in fish habitats
Urban design     MCU                 No         Schedule 10,        State code 24: Urban design
                                                Part 18, Table 1




                                                                                                    14

Page 15

15


[OCR of page images]
uRBIS |

Page 16

STATE CODE 6: PROTECTION OF STATE TRANSPORT
NETWORKS
Table 6.2.2: All development

  Performance outcomes                    Acceptable outcomes        Response
  Network impacts
  PO1 Development does not result in      No acceptable outcome is   PO1 Complies
  a worsening of the safety of a state-   prescribed.                The proposed development
  controlled road.                                                   is not located in close
                                                                     proximity to a state-
  Note: To demonstrate compliance                                    controlled road.
  with this performance outcome, it is
  recommended that a Registered
  Professional Engineer of
  Queensland (RPEQ) certified road
  safety audit or road safety
  assessment (as applicable) is
  provided.

  Further information on determining
  whether a road safety audit or road
  safety assessment is required is
  provided in section 9 of the Guide to
  Traffic Impact Assessment,
  Department of Transport and Main
  Roads, 2017.
  PO2 Development does not result in      No acceptable outcome is   PO2 Complies
  a worsening of the infrastructure       prescribed.                The proposed development
  condition of a state-controlled road                               is not located in close
  or road transport infrastructure.                                  proximity to a state-
                                                                     controlled road.
  Note: To demonstrate compliance
  with this performance outcome, it is
  recommended that a RPEQ certified
  traffic impact assessment and
  pavement impact assessment are
  provided.

  Further information on how to
  prepare a traffic impact assessment
  and pavement impact assessment is
  provided in the Guide to Traffic
  Impact Assessment, Department of
  Transport and Main Roads, 2017.
  PO3 Development does not result in      No acceptable outcome is   PO3 Complies
  a worsening of operating conditions     prescribed.                The proposed development
  on a state-controlled road or the                                  is not located in close
  surrounding road network.                                          proximity to a state-
                                                                     controlled road.
  Note: To demonstrate compliance
  with this performance outcome,

                                                                                            16

Page 17

Performance outcomes                     Acceptable outcomes             Response
it is recommended that an RPEQ
certified traffic impact assessment is
provided.

Further information on how to
prepare a traffic impact assessment
is provided in the Guide to Traffic
Impact Assessment,
Department of Transport and Main
Roads, 2017.
PO4 Development does not impose          AO4.1 The layout and            PO4 Complies
traffic loadings on a state-controlled   design of the development       The proposed development
road which could be accommodated         directs traffic generated by    is not located in close
on the local road network.               the development to the          proximity to a state-
                                         local road network.             controlled road.
PO5 Upgrade works on, or                 AO5.1 Upgrade works on a        PO5.1 Not Applicable
associated with, a state-controlled      state-controlled road are       Proposed upgrade works
road are built in accordance with        designed and constructed        are not proposed.
relevant design standards.               in accordance with the
                                         Road Planning and Design
                                         Manual, 2nd edition,
                                         Department of Transport
                                         and Main Roads, 2016.
PO6 Development involving the            AO6.1 Fill, extracted           AO6.1 Complies
haulage of fill, extracted material or   material and spoil material     Any fill, extracted material
excavated spoil material exceeding       is not transported to or from   and spoil material will not
10,000 tonnes per year does not          the development site on a       be transported to or from
damage the pavement of a state-          state-controlled road.          the development site on a
controlled road.                                                         state-controlled road.

Note: It is recommended that a
transport infrastructure impact
assessment and pavement impact
assessment are provided.

Further information on how to
prepare a traffic impact assessment
is provided in the Guide to Traffic
Impact Assessment, Department of
Transport and Main Roads, 2017.
PO7 Development does not                 AO7.1 Development does          AO7.1 Complies
adversely impact on the safety of a      not require a new railway       The proposed development
railway crossing.                        crossing.                       does not require a new
                                                                         railway crossing.
Note: It is recommended that a           OR
traffic impact assessment be
prepared to demonstrate                  AO7.2 A new railway             AO7.2 Not applicable
compliance with this performance         crossing is grade               The proposed development
outcome. An impact on a level            separated.                      complies with AO7.1.
crossing may require an Australian
Level Crossing Assessment Model          OR all of the following         AO7.3 Not applicable
(ALCAM) assessment to be                 acceptable outcomes             The proposed development
undertaken. Section 2.2 – Railway        apply:                          complies with AO7.1.



                                                                                                        17

Page 18

Performance outcomes                 Acceptable outcomes            Response
crossing safety of the Guide to      AO7.3 Upgrades to a level
Development in a Transport           crossing are designed and
Environment: Rail, Department of     constructed in accordance
Transport and Main Roads, 2015,      with AS1742.7 – Manual of
provides guidance on how to comply   uniform traffic control
with this performance outcome.       devices, Part 7: Railway
                                     crossings and applicable
                                     rail manager standard
                                     drawings.

                                     Note: It is recommended a
                                     traffic impact assessment
                                     be prepared to
                                     demonstrate compliance
                                     with this acceptable
                                     outcome. An impact on a
                                     level crossing may require
                                     an Australian Level
                                     Crossing Assessment
                                     Model (ALCAM)
                                     assessment to be
                                     undertaken. Section 2.2 –
                                     Railway crossing safety of
                                     the Guide to Development
                                     in a Transport
                                     Environment: Rail,
                                     Department of Transport
                                     and Main Roads, 2015,
                                     provides guidance on how
                                     to comply with this
                                     acceptable outcome


                                     AND
                                     AO7.4 Access points            AO7.4 Not applicable
                                     achieve sufficient clearance   The proposed development
                                     from a level crossing in       complies with AO7.1.
                                     accordance with AS1742.7
                                     – Manual of uniform traffic
                                     control devices, Part 7:
                                     Railway crossings by
                                     providing a minimum
                                     clearance of 5 metres from
                                     the edge running rail (outer
                                     rail) plus the length of the
                                     largest vehicle anticipated
                                     on-site.

                                     Note: Section 2.2 of the
                                     Guide to Development in a
                                     Transport Environment:
                                     Rail, Department of
                                     Transport and Main Roads,


                                                                                           18

Page 19

Performance outcomes                    Acceptable outcomes            Response
                                        2015, provides guidance on
                                        how to comply with this
                                        acceptable outcome.

                                        AND
                                        AO7.5 On-site vehicle          AO7.2 Not applicable
                                        circulation is designed to     The proposed development
                                        give priority to entering      complies with AO7.1.
                                        vehicles at all times.
PO8 Development does not result in      No acceptable outcome is       AO8.0 Complies
a worsening of the infrastructure       prescribed.                    The proposed development
condition of a railway or rail                                         will not result in a
transport infrastructure.                                              worsening of the
                                                                       infrastructure condition of a
                                                                       railway or rail transport
                                                                       infrastructure.

PO9 Development does not result in      No acceptable outcome is
a worsening of operating conditions     prescribed.
of a railway
Stormwater and drainage
PO10 Development does not result        No acceptable outcome is       PO10 Complies
in an actionable                        prescribed.                    An integrated water
nuisance, or worsening of,                                             management plan has
stormwater, flooding or                                                been prepared by Cardno.
drainage impacts in a state transport                                  This demonstrates how
corridor.                                                              stormwater will be
                                                                       managed in a way that will
                                                                       avoid causing drainage
                                                                       impacts or actionable
                                                                       nuisance to a state
                                                                       transport corridor.
PO11 Run-off from the development       AO11.1 Development does        AO11.1 Complies
site is not                             not create any new             An integrated water
unlawfully discharged to a state        points of discharge to a       management plan has
transport corridor.                     state transport corridor.      been prepared by Cardno.
                                        AND                            There is no discharge to a
                                                                       state transport corridor.
                                        AO11.2 Stormwater run-off      AO11.2 Complies
                                        is discharged to a lawful      An integrated water
                                        point of discharge.            management plan has
                                                                       been prepared by Cardno
                                        Note: Section 3.49 of the      This demonstrates that the
                                        Queensland Urban               development is able to
                                        Drainage Manual,               achieve stormwater run-off
                                        Institute of Public Works      discharged to a lawful point
                                        Engineering Australasia        of discharge.
                                        (Queensland Division)
                                        Fourth Edition, 2016,
                                        provides further information
                                        on lawful points of
                                        discharge.

                                                                                                   19

Page 20

Performance outcomes                Acceptable outcomes               Response
                                    AND
                                    AO11.3 Development does           AO11.3 Not Applicable
                                    not worsen the condition          No stormwater discharge is
                                    of an existing lawful point of    proposed to a state
                                    discharge to a state              transport corridor.
                                    transport corridor.
PO12 Run-off from the development   AO12.1 Run-off from the           AO12.1 Complies
site does not                       development site is not           Run-off from the
cause siltation of stormwater       discharged to stormwater          development will not be
infrastructure affecting a state    infrastructure for a state        discharged to stormwater
transport corridor.                 transport corridor.               infrastructure for a state
                                                                      transport corridor. This is
                                                                      demonstrated within the
                                                                      integrated water
                                                                      management plan has
                                                                      been prepared by Cardno
Planned upgrades
PO13 Development does not           AO13.1 Development is not         AO13.1 Complies
impede delivery of planned          located on land                   SARA mapping does not
upgrades of state transport         identified by the                 indicate any planned
infrastructure.                     Department of Transport           upgrades to state transport
                                    and Main                          infrastructure at or adjoining
                                    Roads as land required for        the site.
                                    the planned upgrade of
                                    state transport
                                    infrastructure.

                                    Note: Land required for the
                                    planned upgrade of state
                                    transport
                                    infrastructure is identified in
                                    the DA mapping system.

                                    OR
                                    AO13.2 Development is             AO13.2 Not Applicable
                                    sited and designed so that        The proposed development
                                    permanent buildings,              complies with AO13.1.
                                    structures, infrastructure,
                                    services or utilities are not
                                    located on land identified
                                    by the Department of
                                    Transport and Main Roads
                                    as land required for the
                                    planned upgrade of state
                                    transport infrastructure.
                                    OR all of the following           AO13.3 Not Applicable
                                    acceptable outcomes               The proposed development
                                    apply:                            complies with AO13.1.

                                    AO13.3 Structures and
                                    infrastructure located on
                                    land identified by the
                                    Department of Transport


                                                                                                    20

Page 21

  Performance outcomes                    Acceptable outcomes              Response
                                          and Main Roads as land
                                          required for the planned
                                          upgrade of state transport
                                          infrastructure are able
                                          to be readily relocated or
                                          removed without materially
                                          affecting the viability or
                                          functionality of the
                                          development.

                                          AND
                                          AO13.4 Vehicular access          AO13.4 Not Applicable
                                          for the development is           The proposed development
                                          consistent with the function     complies with AO13.1.
                                          and design of the
                                          planned upgrade of state
                                          transport infrastructure.

                                          AND
                                          AO13.5 Development does          AO13.5 Not Applicable
                                          not involve filling and          The proposed development
                                          excavation of, or material       complies with AO13.1.
                                          changes to, land required
                                          for a planned upgrade to a
                                          state transport
                                          infrastructure.

                                          AND
                                          AO13.6 Land is able to be        AO13.6 Not Applicable
                                          reinstated to the                The proposed development
                                          predevelopment condition         complies with AO13.1.
                                          at the completion of the
                                          use.



Table 6.2.3: Public passenger transport infrastructure
 Performance outcomes                      Acceptable outcomes             Response
 Public passenger transport infrastructure
 PO14 Development does not damage          AO14.1 Vehicular access         AO14.1 Complies
 or interfere                              and associated road             No vehicular access or
 with public passenger transport           access works are not            associated road access
 infrastructure, public passenger          located within 5 metres of      works area proposed
 services or pedestrian or cycle access    public passenger transport      within five meters of public
 to public passenger transport             infrastructure.                 passenger transport
 infrastructure and public passenger                                       infrastructure.
 services.                                 AND
                                           AO14.2 Development does         AO14.2 Complies
                                           not necessitate the             The proposed
                                           relocation of existing public   development does not
                                           passenger transport             necessitate the relocation
                                           infrastructure.                 of existing public
                                                                           passenger transport
                                           AND                             infrastructure.

                                                                                                        21

Page 22

Performance outcomes                      Acceptable outcomes           Response
                                          AO14.3 Development does       AO14.3 Complies
                                          not obstruct pedestrian       The proposed
                                          or cyclist access to public   development does not
                                          passenger transport           obstruct pedestrian or
                                          infrastructure or public      cyclist access to public
                                          passenger services.           passenger transport
                                                                        infrastructure or public
                                          AND                           passenger services.
                                          AO14.4 The normal             AO14.4 Complies
                                          operation of public           The proposed
                                          passenger                     development is not located
                                          transport infrastructure or   in close proximity to public
                                          public passenger services     passenger transport
                                          is not interrupted during     infrastructure and
                                          construction of the           passenger services will not
                                          development.                  be interrupted during
                                                                        construction.
PO15 Upgraded or new public               No acceptable outcome is      PO15 Complies
passenger                                 prescribed.                   The development site is
transport infrastructure is provided to                                 located within proximity to
accommodate the demand for public                                       the existing public
passenger                                                               transport facilities and
transport generated by the                                              networks along Eenie
development.                                                            Creek Road.

Note: To demonstrate compliance
with this performance outcome,
it is recommended a public transport
impact assessment be
prepared in accordance with appendix
1 of the State
Development Assessment Provisions
Supporting Information –
Public Passenger Transport
Infrastructure, Department of
Transport and Main Roads, 2017.

New or upgraded public passenger
transport infrastructure
provided should be in accordance
with the Public Transport
Infrastructure Manual, Department of
Transport and Main Roads,
2015.

Refer to the SDAP Supporting
Information: Public passenger
transport infrastructure, Department of
Transport and Main
Roads, 2017, for further guidance on
how to comply with the
performance outcome.
PO16 Development is designed to           No acceptable outcome is      PO16 Not Applicable
ensure the                                prescribed.                   The proposed


                                                                                                   22

Page 23

Performance outcomes                        Acceptable outcomes             Response
location of public passenger transport                                      development does not
infrastructure prioritises and enables                                      include public passenger
efficient public passenger services.                                        transport infrastructure.

Note: Chapters 2 and 5 of the Public
Transport Infrastructure
Manual, Department of Transport and
Main Roads, 2015 provides
guidance on how to comply with this
performance outcome.

Refer to the SDAP Supporting
Information: Public passenger
transport infrastructure, Department of
Transport and Main
Roads, 2017, for further guidance on
how to comply with the
performance outcome.
PO17 Development enables the                No acceptable outcome is        PO17 Not Applicable
provision or extension of public            prescribed.                     The proposed
passenger services to the                                                   development does not
development and avoids creating                                             include public passenger
indirect or inefficient routes for public                                   transport infrastructure.
passenger services.

Note: Refer to the SDAP Supporting
Information: Public
passenger transport infrastructure,
Department of Transport and
Main Roads, 2017, for further
guidance on how to comply with the
performance outcome.
PO18 New or modified road networks          AO18.1 Roads catering for       AO18.1 Not Applicable
are designed                                buses are arterial or           The proposed
to enable development to be serviced        sub-arterial roads, collector   development does not
by public                                   or their equivalent.            include public passenger
passenger services.                                                         transport infrastructure.
                                            AND
Note: Refer to the SDAP Supporting          AO18.2 Roads intended to        AO18.2 Not Applicable
Information: Public                         accommodate buses are           The development will not
passenger transport infrastructure,         designed and constructed        propose for public
Department of Transport and                 in accordance with Road         passenger transport to
Main Roads, 2017, for further               Planning and Design             access or manoeuvre on
guidance on how to comply with the          Manual 2nd edition, Volume      the site
performance outcome.                        3:
                                            Guide to Road Design,
                                            Department of Transport
                                            and
                                            Main Roads, 2016.

                                            Note: Guidance on how to
                                            meet the acceptable
                                            outcome is



                                                                                                        23

Page 24

Performance outcomes   Acceptable outcomes            Response
                       available in the Road
                       Planning and Design
                       Manual 2nd edition,
                       Volume 3: Guide to Road
                       Design, Department of
                       Transport and
                       Main Roads, 2016:
                       1. Part 3:
                       a. 4.2 Traffic lanes
                       b. 4.8 Bicycle lanes
                       c. 4.9 High occupancy
                       vehicle (HOV) lanes
                       d. 4.12 Bus stops
                       e. 7 Horizontal alignment
                       f. 7.7 Super elevation
                       g. 7.9 Curve widening
                       2. Part 4:
                       a. 6.3 Bus Facilities
                       b. 5.6 Design vehicle swept
                       path
                       3. Part 4A:
                       a. 5 Auxiliary lanes
                       4. Part 4B: Roundabouts:
                       a. 4 Geometric design
                       b. 4.6 Circulating
                       carriageway.

                       AND
                       AO18.3 Traffic calming         AO18.3 Not Applicable
                       devices are not installed on   The development will not
                       roads used for buses.          propose for public
                                                      passenger transport to
                       Note: Chapter 2 of the         access or manoeuvre on
                       Public Transport               the site.
                       Infrastructure Manual,
                       Department of Transport
                       and Main Roads, 2015
                       provides
                       guidance on how to comply
                       with this acceptable
                       outcome.

                       AND
                       AO18.4 Where road humps        AO18.4 Not Applicable
                       are installed on roads         The development will not
                       used for buses, the road       propose for public
                       humps are designed in          passenger transport to
                       accordance with the            access or manoeuvre on
                       Manual of Uniform Traffic      the site.
                       Control Devices,
                       Department of Transport
                       and Main
                       Roads, 2018.



                                                                                 24

Page 25

Performance outcomes                      Acceptable outcomes           Response
                                          Note: Guidance on how to
                                          meet the acceptable
                                          outcome is
                                          available in the Manual of
                                          Uniform Traffic Control
                                          Devices, Part
                                          13:
                                          1. Section 2, clause 2.4,
                                          Road humps
                                          2. Section 2, clause 2.1.2-
                                          1, Hump profiles for bus
                                          routes.
PO19 Development provides safe,           No acceptable outcome is      PO19 Complies
direct and                                prescribed.                   The proposed
convenient pedestrian access to                                         development will provide
existing and future                                                     enhanced pedestrian
public passenger transport                                              connectivity around the
infrastructure.                                                         site, improving the safety
                                                                        of pedestrians to nearby
Note: Chapter 3 of the Public                                           public transport
Transport Infrastructure Manual,                                        connections.
Department of Transport and Main
Roads, 2015 provides
guidance on how to comply with this
performance outcome. In particular, it
is recommended that a pedestrian
demand analysis
be provided to demonstrate
compliance with the performance
outcome.

Refer to the SDAP Supporting
Information: Public passenger
transport infrastructure, Department of
Transport and Main
Roads, 2017, for further guidance on
how to comply with the
performance outcome.
PO20 On-site vehicular circulation        AO20.1 The location of on-    AO20.1 Not Applicable
ensures the                               site pedestrian crossings     The proposed
safety of both public passenger           ensures safe sight            development does not
transport services                        distances for pedestrians     propose on-site pedestrian
and pedestrians.                          and                           crossings
                                          public passenger services.
Note: Refer to the SDAP Supporting
Information: Public passenger             AND
transport infrastructure, Department of   AO20.2 On-site circulation    AO20.2 Not Applicable
Transport and Main Roads, 2017, for       is designed and               The proposed
further guidance on how to comply         constructed so that public    development does not
with the performance outcome.             passenger services can        propose for public
                                          enter and leave in a          passenger transport to
                                          forward gear at all times.    access or manoeuvre on
                                                                        the site.
                                          AND


                                                                                                     25

Page 26

Performance outcomes                      Acceptable outcomes              Response
                                          AO20.3 Development does          AO20.3 Not Applicable
                                          not result in public             The proposed
                                          passenger services               development does not
                                          movements through car            propose for public
                                          parking aisles.                  passenger transport to
                                                                           access or manoeuvre on
                                                                           the site.

PO21 Taxi facilities are provided to      No acceptable outcome is         PO21 Will Comply
accommodate                               prescribed.                      Taxi ranks can be provided
the demand generated by the                                                within the Noosa
development.                                                               Marketplace where
                                                                           necessary.
Note: Guidance on how to meet the
performance outcome are
available in chapter 7 of the Public
Transport Infrastructure
Manual, Department of Transport and
Main Roads, 2015.

Refer to the SDAP Supporting
Information: Public passenger
transport infrastructure, Department of
Transport and Main
Roads, 2017, for further guidance on
how to comply with the
performance outcome.
PO22 Taxi facilities are located and      AO22.1 A taxi facility is        AO22.1 Not Applicable
designed to                               provided parallel to the         Taxi ranks can be provided
provide convenient, safe and              kerb and adjacent to the         within the Noosa
equitable access for                      main entrance.                   Marketplace where
passengers.                                                                necessary.
                                          AND
Note: Refer to the SDAP Supporting        AO22.2 Taxi facilities are       AO22.2 Not Applicable
Information: Public                       designed in accordance           Taxi ranks can be provided
passenger transport infrastructure,       with:                            within the Noosa
Department of Transport and                                                Marketplace where
Main Roads, 2017, for further             1. AS2890.5–1993 Parking         necessary.
guidance on how to comply with the        facilities – on-street
performance outcome.                         parking and AS1428.1–
                                          2009 Design for access
                                             and mobility – general
                                          requirements for access –
                                             new building work
                                          2. AS1742.11–1999
                                          Parking controls – manual
                                          of
                                             uniform traffic control
                                          devices
                                          3. AS/NZS 2890.6–2009
                                          Parking facilities – offstreet
                                             parking for people with
                                          disabilities



                                                                                                    26

Page 27

Performance outcomes                      Acceptable outcomes            Response
                                          4. Disability standards for
                                          accessible public
                                             transport 2002 made
                                          under section 31(1) of the
                                             Disability Discrimination
                                          Act 1992
                                          5. AS/NZS 1158.3.1 –
                                          Lighting for roads and
                                          public
                                             spaces, Part 3.1:
                                          Pedestrian area (category
                                          P)
                                             lighting – Performance
                                          and design requirements.
PO23 Educational establishments are       AO23.1 Educational             AO23.1 Not Applicable
designed to                               establishments are             The proposed
ensure the safe and efficient             designed                       development does not
operation of public                       in accordance with the         include an educational
passenger services and pedestrian         provisions of the Planning     establishment.
access.                                   for
                                          Safe Transport
Note: Refer to the SDAP Supporting        Infrastructure at Schools,
Information: Public passenger             Department of Transport
transport infrastructure, Department of   and Main Roads, 2011.
Transport and Main Roads, 2017, for
further guidance on how to comply
with the performance outcome.




                                                                                                  27

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.