7. Appendix D - SPP SDAP Checklists and Assessment Benchmarks

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Performance outcomes                    Acceptable outcomes            Response
                                        2015, provides guidance on
                                        how to comply with this
                                        acceptable outcome.

                                        AND
                                        AO7.5 On-site vehicle          AO7.2 Not applicable
                                        circulation is designed to     The proposed development
                                        give priority to entering      complies with AO7.1.
                                        vehicles at all times.
PO8 Development does not result in      No acceptable outcome is       AO8.0 Complies
a worsening of the infrastructure       prescribed.                    The proposed development
condition of a railway or rail                                         will not result in a
transport infrastructure.                                              worsening of the
                                                                       infrastructure condition of a
                                                                       railway or rail transport
                                                                       infrastructure.

PO9 Development does not result in      No acceptable outcome is
a worsening of operating conditions     prescribed.
of a railway
Stormwater and drainage
PO10 Development does not result        No acceptable outcome is       PO10 Complies
in an actionable                        prescribed.                    An integrated water
nuisance, or worsening of,                                             management plan has
stormwater, flooding or                                                been prepared by Cardno.
drainage impacts in a state transport                                  This demonstrates how
corridor.                                                              stormwater will be
                                                                       managed in a way that will
                                                                       avoid causing drainage
                                                                       impacts or actionable
                                                                       nuisance to a state
                                                                       transport corridor.
PO11 Run-off from the development       AO11.1 Development does        AO11.1 Complies
site is not                             not create any new             An integrated water
unlawfully discharged to a state        points of discharge to a       management plan has
transport corridor.                     state transport corridor.      been prepared by Cardno.
                                        AND                            There is no discharge to a
                                                                       state transport corridor.
                                        AO11.2 Stormwater run-off      AO11.2 Complies
                                        is discharged to a lawful      An integrated water
                                        point of discharge.            management plan has
                                                                       been prepared by Cardno
                                        Note: Section 3.49 of the      This demonstrates that the
                                        Queensland Urban               development is able to
                                        Drainage Manual,               achieve stormwater run-off
                                        Institute of Public Works      discharged to a lawful point
                                        Engineering Australasia        of discharge.
                                        (Queensland Division)
                                        Fourth Edition, 2016,
                                        provides further information
                                        on lawful points of
                                        discharge.

                                                                                                   19
Log in to download the original file

7. Appendix D - SPP SDAP Checklists and Assessment Benchmarks.pdf · 223 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.