Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

7. Appendix D - SPP SDAP Checklists and Assessment Benchmarks

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Matters of State Planning         Type    Relevant to Development /                  Assessment
Interest         Scheme                   Trigger                                    Required
                 Reflects State
                 Interest*
Energy and       No               No Assessment Benchmarks
Water Supply
Infrastructure    No              No Assessment Benchmarks
Integration
Transport         No              No Assessment Benchmarks
Infrastructure
Strategic Airports No             MCU     Where:                                     No
and Aviation
                                         a) A premises that will result in a
Facilities
                                            building, structure or associated
                                            activity intruding into the
                                            operational airspace of a
                                            strategic airport; or
                                         b) any part of the premises is
                                            within the light restriction zone
                                            or lighting area buffer of a
                                            strategic airport; or
                                         c) any part of the premises is
                                            within a wildlife hazard buffer
                                            zone of a strategic airport; or
                                         d) any part of the premises is
                                            within a public safety area of a
                                            strategic airport; or
                                         e) any part of the premises is
                                            within the 20 ANEF contour or
                                            greater for a strategic airport; or
                                         f)   A premises that will result in a
                                              building, structure or associated
                                              activity intruding into the building
                                              restricted area of an aviation
                                              facility.


                  No              ROL     Where:                                     N/A
                                         a) any part of the premises is
                                            within a public safety area of a
                                            strategic airport; or




                                                                                                  5
Log in to download the original file

7. Appendix D - SPP SDAP Checklists and Assessment Benchmarks.pdf · 223 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.