Council archive · source document
001A7F18.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
. _.__ INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 22
soe 5 ECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
a a a a Tt in nti |
, HERITAGE J
1.1A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
No-Goto1.18 [_] Yes
IP4, schedule 8, pat i fabe 5 ven 2 oP Reguaton schedule 2 table 2 fem 18
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
No-Gotoat2 [_] Yes
IPA. scnegule & part t table 5 tem 24 ' Qequation scheduie | oat 2 tabe 5 tem Z
IREMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoar.3 [_] Yes
IPA. schedule 8, part 1, table 5, item 1: 1P Regulation, schedule 2, table 2, item 11: 'P Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000,
section S66C, Wild Rivers Act 2005, section 43A
‘ENVIRONMENTALLY. RELEVANT ACTIVITY; WILD RIVER AREA _ | [email protected] Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotoai4 ((] Yes
IPA, schedule & part 1, lable 2. tam 1: IPA schedule 8, part 1. table 5, dems 3 and 4; IP Regulation. schedule 2, table 2. items | and 23; Environmental Protection Act 1994, section
73AA {wild nver area): Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code.
‘WITHIN THE LIMITS OF A PORT - oo :
14 {s any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No - Goto 01.5
[_] Yes
IP Regulation, schedule 2. table 2, items 15 and 16
DECLARED FISH HABITAT AREA .
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No - Goto 01.6
{| Yes - If answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
© IP Regulation, schedule 2. table 2, item 26
a a eh een ell a i
COMMUNITY INFRASTRUCTURE
1.6 Is any part of the premises designated for community infrastructure?
No - GotoQ1.7
[_] Yes
IP Reguiation, schedule 2, table 3, item 7
‘WASTE WATER MANAGEMENT
1.7 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -End of Section? [_] Yes
IP Regulation schedule 2, table 3, item $See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F18.001.pdfRelated documentPublic source context ↗
09/0514 - Operational Works - Access, Stormwater & Water & Sewerage Reticulation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.