.         INTEGRATED PEANNING ACT T997——                        Le                      -                                          Part, Version 3:97 F March 2008
                      ~ “QLEAVE NOTIFICATION AND PAYMENT {for completion by assessment manager orgzivate-certifier if applicable)                         oT
‘         ‘                 eS        ee     Coe    Bower       se                   ba     RO]       es | Date reeeipted            pS             Rae
                            qi,    seit oe a aA oD ae Bag an ea                              ed ac          4 | form sighted.by | Name of officer who sighted the
            |                                                                                                        ‘Seer |                   me
                           wr      SS Oe                   ee       OE       ee eB                                     manager us UE                  Pg

           The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
           Your personal details will not be discfosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
          required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

          Advice for completing Part A
          General advice
          .          Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
                     for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
                     Assessment Manger may refuse to receive an application that is not property made.
          °          The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
               __, Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only,
          Applicant details
          .          if the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
                     under the IPA.                                                                                                                    .
           Details of the premises
          e          The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
                     structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
  ©       °          Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
                     Table A.
           °         The premises may be identified in a number of ways --
                     e Street address and lot on plan are most common and will apply to most applications.
                     e Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
                        development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
                        premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
                        (specified) datum such as Zone Reference or GS84 may be provided.
           e         The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
           .         StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
                     StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 114 (Development on
                     strategic port land) and the Queensland Transport (Ports) website.
           °         “Tidal water’ is defined in the Coastat Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
                     port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
                    _mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
                     ‘provided for under the Loca! Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below     :
                     high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmentat Protection
                     Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
                     deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that
                     assessment (to the extent provided for in the code for prescribed tidal work).
 ©         Resource entitlement
           .         Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for apptications if they involve taking or interfering with a
                     prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
                     owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
                     Reaquiation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence.
           °         For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
                     time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
           °         For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment {identified by
                     gazette notice under the Transport Infrestructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
           *         Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
                     Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
                     above high water mark.

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A7F18.001.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.