Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn (d) Industry activities ensure—
(i) service areas and waste management processes and systems are efficient and maximise opportunities for
reuse and recycling;
(ii) the safety and security of property tenants, operators, employees and patrons; and
(iii) the establishment of safe, comfortable pedestrian environments with high levels of accessibility and
functionality.
(e) Industry activities—
(i) protect Noosa’s natural resources and environmental values and are energy and water efficient and resilient
to future impacts of climate change; and
(ii) are located where there is an appropriate level of infrastructure services to support the use.
(f) Extractive industries –
(i) occur in a safe, environmentally sound manner protecting water quality and ecologically important areas
from environmental degradation;
(ii) are located, designed, constructed and operated to avoid and mitigate adverse impacts on sensitive land
uses;
(iii) are located with access to appropriate transport networks and avoid impacts on the efficient functioning of
the network; and
(iv) rehabilitate land to an appropriate standard.
FOR ACCEPTED DEVELOPMENT
The requirements for Acceptable Development are the acceptable outcomes listed in the Table of Assessment. Accepted
development that complies with all the acceptable solutions is considered to satisfy the requirements. If development complies
with some, but not all, acceptable outcomes, an application for Code Assessment will be necessary and the application will be
assessed against the relevant Performance Outcome(s).
FOR ASSESSABLE DEVELOPMENT
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
considered as one way to satisfy the corresponding performance outcome.
Table 9.3.10.3 Criteria for assessment
Location 9.3.10.3 Criteria for assessable development assessment (part)
Performance outcomes Acceptable outcomes
All industry activities
PO1
Industry activities are located on a site suitable for their No acceptable outcome provided
intended purpose and are supported by adequate infrastructure
and services.
Effects of use 9.3.10.3 Criteria for assessable development assessment (part)
Performance outcomes Acceptable outcomes
Effects of use
PO2
Industry activities are of a type, scale and intensity that is No acceptable outcome provided
consistent with the zone, locality and character of the area in which
it is located.
PO3
Industry activities contribute to the local economy and employment No acceptable outcome provided
in the area in which it is located.
Amenity and Safety 9.3.10.3 Criteria for assessable development assessment (part)
NOOSA PLAN 2020 Page 58 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.