Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn (i) Stormwater is collected and used on site for nonpotable purposes of gardening, toilet flushing, laundry and hot water
supply uses.
(j) Healthy indoor environments are provided by incorporating the use of low toxic materials, natural light and cross
ventilation.
Table 9.4.6.3 Criteria for assessable development
Energy efficiency Table 9.4.6.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Energy efficiency
PO1
Development minimises energy consumption and the production No acceptable outcome provided
of greenhouse gas emissions.
Water efficiency and stormwater management Table 9.4.6.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Water efficiency and stormwater management
PO2 AO2.1
Development maximises water efficiency on site by incorporating If for accommodation activities, a minimum 3,000 litres of rain
rainwater collection and reuse measures for nonpotable water storage is provided per dwelling and reused for nonpotable
purposes such as irrigation. purposes and incorporated into a stormwater management plan
for the development.
AO2.2
With the exception of accommodation activities, rain water storage
sufficient for the intended use is captured and used onsite for
nonpotable purposes and incorporated into a stormwater
management plan for the development.
Editor’s note—The Queensland Development Code includes
provisions for the installation of rain water tanks and the reuse of
stormwater.
PO3 AO3.1
Development reduces stormwater runoff by minimising Development incorporates water sensitive urban design
impervious areas and maximising site vegetation to absorb water measures to manage stormwater.
on site.
AO3.2
Development incorporates porous pavements on low trafficked
areas such as footpaths and car parks.
Note: Porous pavements are not considered landscaping and do
not form part of the minimum landscape requirements.
PO4
Development limits changes and disturbances to the site No acceptable outcome provided
topography to preserve existing drainage channels as much as
possible.
Landscaping Table 9.4.6.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
NOOSA PLAN 2020 Page 104 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.