Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
        (i)   Stormwater is collected and used on site for non­potable purposes of gardening, toilet flushing, laundry and hot water
              supply uses.
        (j)   Healthy indoor environments are provided by incorporating the use of low toxic materials, natural light and cross
              ventilation.


 Table 9.4.6.3        Criteria for assessable development

 Energy efficiency          Table 9.4.6.3 Criteria for assessment (part)
  Performance outcomes                                              Acceptable outcomes

  Energy efficiency
  PO1
  Development minimises energy consumption and the production       No acceptable outcome provided
  of greenhouse gas emissions.



 Water efficiency and stormwater management                         Table 9.4.6.3 Criteria for assessment (part)
  Performance outcomes                                              Acceptable outcomes

  Water efficiency and stormwater management
  PO2                                                               AO2.1
  Development maximises water efficiency on site by incorporating   If for accommodation activities, a minimum 3,000 litres of rain
  rainwater collection and reuse measures for non­potable           water storage is provided per dwelling and reused for non­potable
  purposes such as irrigation.                                      purposes and incorporated into a stormwater management plan
                                                                    for the development.

                                                                    AO2.2
                                                                    With the exception of accommodation activities, rain water storage
                                                                    sufficient for the intended use is captured and used on­site for
                                                                    non­potable purposes and incorporated into a stormwater
                                                                    management plan for the development.

                                                                    Editor’s note—The Queensland Development Code includes
                                                                    provisions for the installation of rain water tanks and the reuse of
                                                                    stormwater.
  PO3                                                             AO3.1
  Development reduces stormwater run­off by minimising            Development incorporates water sensitive urban design
  impervious areas and maximising site vegetation to absorb water measures to manage stormwater.
  on site.
                                                                  AO3.2
                                                                  Development incorporates porous pavements on low trafficked
                                                                  areas such as footpaths and car parks.

                                                                    Note: Porous pavements are not considered landscaping and do
                                                                    not form part of the minimum landscape requirements.
  PO4
  Development limits changes and disturbances to the site           No acceptable outcome provided
  topography to preserve existing drainage channels as much as
  possible.


 Landscaping          Table 9.4.6.3 Criteria for assessment (part)
  Performance outcomes                                              Acceptable outcomes



NOOSA PLAN 2020                                                                                                               Page 104 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.