Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
AO6.2
Gates are not installed in fences as direct access to the
beachfront does not occur.
AO6.3
Only beach access points for use by the community are
constructed.
Figure 8.2.4.4 Coastal Building Lines
8.2.5 Extractive Resources Overlay Code
8.2.5.1 Application
(1) This code applies to assessable development:
(a) subject to the Extractive Resource Areas Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
(b) identified as requiring assessment against the Extractive Resources overlay code by the tables of assessment in Part 5
(Tables of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
8.2.5.2 Purpose and overall outcomes
(1) The purpose of the Extractive Resources overlay code is to protect extractive resource areas and transport routes from
development that is not compatible with extractive industry operations and to minimise land use conflicts between the extractive
industry operation and other activities in the vicinity of extractive resource areas.
(2) The overall outcomes sought for the Extractive Resources overlay code are:
(a) Development does not adversely affect or impede extraction of resources from extractive resource areas.
(b) Development ensures that extractive resource separation areas and transport route separation areas are not encroached
upon by incompatible development that could affect or impede extraction or haulage of resources.
(c) Development, other than for an extractive industry, is buffered from and is able to mitigate impacts likely to occur as a result
of an extraction of resources from an extractive resource area.
(d) A high level of amenity for residents and land uses in the vicinity of extractive industry operations and transport routes is
NOOSA PLAN 2020 Page 15 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.