Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Safety and protection of infrastructure when demolishing or removing buildings                                            Table 9.4.10.3 ­
 Criteria for assessable development (part)
  Performance outcomes                                                       Acceptable Outcomes

  Assessable development
  Safety and protection of infrastructure when demolishing or removing buildings
  PO7                                                                        AO7.1
  Demolition, removal, relocation or associated works do not result          Infrastructure including reticulated water, sewerage, stormwater,
  in:                                                                        and electricity are protected from damage and made safe to the
  (a)    'live' or 'active' infrastructure that may present risk to people   standard required by the regulatory authority.
         using the site or surrounding areas; or
                                                                             AO7.2
  (b)    damage to infrastructure or other works.
                                                                             Infrastructure is disconnected, capped or sealed including:
                                                                             (a)   electricity meters are removed and electrical wires
  Editor's note— An approval will be required from Council's
                                                                                   disconnected;
  Building and Plumbing Services for decommissioning plumbing
  apparatus including:                                                       (b)   telephone lines are disconnected; and
  (a)    sanitary drains or reticulated water supply; and                    (c)   data cables are disconnected and removed.
  (b)    septic tanks, holding tanks or on­site treatment systems.
                                                                             AO7.3
                                                                             A temporary crossing is provided to protect road reserve
                                                                             infrastructure including kerb and channel.

                                                                             AO7.4
                                                                             Any damage to footpaths, street plantings, natural vegetation, kerb
                                                                             and channel, bridges or roadways at the removal site, the new site
                                                                             or between the sites is repaired or reinstated to at least pre­
                                                                             existing conditions.
  PO8                                                                        AO8.1
  Waste materials are removed from the site to avoid causing                 Waste materials are removed from the site.
  unhealthy conditions including:
  (a)    potential fire hazard;                                              AO8.2
                                                                             If a development permit has not been issued for the future use of
  (b)    ponding of water; and
                                                                             the site:
  (c)    breeding of vermin.                                                       hard surfaced areas including concrete slabs are removed
                                                                             (a)
                                                                                   or covered with a minimum of 300 millimetres of soil; and
                                                                             (b)   disturbed areas are revegetated.

  PO9
  The potential for movement from the site, of soils or similar              No acceptable outcome provided
  materials is minimised.
  PO10
  Vacant sites do not have an adverse impact upon the amenity of             No acceptable outcome provided
  the surrounding areas.
  PO11                                                                       AO11.1
  The demolition or removal of a building does not cause a health            All building materials containing asbestos, including asbestos
  risk.                                                                      cement sheeting or roofing and lagging, are removed from the
                                                                             building prior to demolition or relocation.
  Editor's note— Council may require a report identifying any
  asbestos products and how they may be managed to avoid health AO11.2
  risks.                                                        All building materials containing asbestos products are disposed
                                                                of in accordance with industry best practice.


NOOSA PLAN 2020                                                                                                                     Page 137 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.