Log in to see the plans as drawn Safety and protection of infrastructure when demolishing or removing buildings Table 9.4.10.3
Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
Assessable development
Safety and protection of infrastructure when demolishing or removing buildings
PO7 AO7.1
Demolition, removal, relocation or associated works do not result Infrastructure including reticulated water, sewerage, stormwater,
in: and electricity are protected from damage and made safe to the
(a) 'live' or 'active' infrastructure that may present risk to people standard required by the regulatory authority.
using the site or surrounding areas; or
AO7.2
(b) damage to infrastructure or other works.
Infrastructure is disconnected, capped or sealed including:
(a) electricity meters are removed and electrical wires
Editor's note— An approval will be required from Council's
disconnected;
Building and Plumbing Services for decommissioning plumbing
apparatus including: (b) telephone lines are disconnected; and
(a) sanitary drains or reticulated water supply; and (c) data cables are disconnected and removed.
(b) septic tanks, holding tanks or onsite treatment systems.
AO7.3
A temporary crossing is provided to protect road reserve
infrastructure including kerb and channel.
AO7.4
Any damage to footpaths, street plantings, natural vegetation, kerb
and channel, bridges or roadways at the removal site, the new site
or between the sites is repaired or reinstated to at least pre
existing conditions.
PO8 AO8.1
Waste materials are removed from the site to avoid causing Waste materials are removed from the site.
unhealthy conditions including:
(a) potential fire hazard; AO8.2
If a development permit has not been issued for the future use of
(b) ponding of water; and
the site:
(c) breeding of vermin. hard surfaced areas including concrete slabs are removed
(a)
or covered with a minimum of 300 millimetres of soil; and
(b) disturbed areas are revegetated.
PO9
The potential for movement from the site, of soils or similar No acceptable outcome provided
materials is minimised.
PO10
Vacant sites do not have an adverse impact upon the amenity of No acceptable outcome provided
the surrounding areas.
PO11 AO11.1
The demolition or removal of a building does not cause a health All building materials containing asbestos, including asbestos
risk. cement sheeting or roofing and lagging, are removed from the
building prior to demolition or relocation.
Editor's note— Council may require a report identifying any
asbestos products and how they may be managed to avoid health AO11.2
risks. All building materials containing asbestos products are disposed
of in accordance with industry best practice.
NOOSA PLAN 2020 Page 137 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.