Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                                      Acceptable Outcomes
                                                                            AO7.9
                                                                            Ecologically important areas are formally protected for the long
                                                                            term through environmental covenant or transferal to public
                                                                            ownership or through gazettal of a nature reserve.
  Climate Responsive Design
  PO8                                                                       AO8.1
  The street design and lot orientation facilitates the construction of     The lot design maximises the number of lots where the longest
  energy efficient buildings that respond to the local climate              axis of the lot has a general east­west orientation.
  conditions by:
  (a)    maximising solar access to the north;                              AO8.2
                                                                            The street pattern maximises the number of streets running in a
  (b)    minimising solar access to the west;
                                                                            general north­south direction.
  (c)    proportioning lots and building envelopes to accommodate
         energy efficient building orientation;                             AO8.3
  (d)    maximising access to any prevailing summer breezes; and            For development within the Low density residential zone each lot
                                                                            contains a rectangular house site area where the long axis faces
  (e)    minimising exposure to prevailing winter winds.
                                                                            true north or is no more than 20 degrees off true north and has
                                                                            minimum dimensions of 10 metres x 15 metres.
  Neighbourhood Design
  PO9                                                                       AO9.1
  Development provides for a lot layout, land use and infrastructure        Lots are arranged to front streets and public open space.
  configuration that:
  (a)    provides for an efficient land use pattern;                        AO9.2
                                                                            Development maximises opportunities for casual surveillance and
  (b)    creates compact and walkable neighbourhoods that are
                                                                            avoids areas of concealment by ensuring pathways and public
         well connected to centres, employment, education facilities,
                                                                            open space have defined edges and are visually exposed to
         community services, open space and recreation facilities;
                                                                            roadways.
  (c)    creates useable and interconnected movement and open
         space networks;                                                    AO9.3
  (d)    effectively connects and integrates the site with existing or      Neighbourhoods (including roads, pathways and open space) are
         planned development on adjoining sites;                            designed with a high degree of legibility with public spaces and
                                                                            corridors easy to find and recognise.
  (e)    provides for moderate and large size developments to have
         multiple access points;
  (f)    promotes a sense of community identity and belonging;
  (g)    promotes a variety of streetscapes;
  (h)    provides for a high level of amenity, having regard to
         potential noise, dust, odour and lighting nuisance sources;
  (i)    integrates prominent site features including landmarks,
         native vegetation and views into the design;
  (j)    discourages crime or antisocial behaviour by facilitating
         casual surveillance of streets, paths and public open space;
  (k)    avoids the sporadic or out­of­ sequence creation of lots; and
  (l)    protects and enhances ecologically important areas and
         provides for the clustering of lots into cleared areas.

  Infrastructure
  PO10                                                                      No acceptable outcome provided
  Development accommodates and provides for the efficient and
  timely delivery of infrastructure appropriate to the site’s setting and
  intended use.
  PO11
  Roadway and pathway layout are predominantly rectilinear with a           No acceptable outcome provided
  high degree of permeability.
                                                                            Editor’s Note— Further detail on traffic and the road network is
                                                                            addressed in Part 9.4.8 Transport Code


NOOSA PLAN 2020                                                                                                                    Page 142 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.