Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                                 Acceptable Outcomes
  manner that is consistent with the overall outcomes for the zone
  and Local plan area in which the site is located.


 Stormwater Management                  Table 9.5.1.3 Criteria for assessable development (part)
  Performance Outcomes                                                 Acceptable Outcomes
  Growth management
  Stormwater Management
  PO24
  Development provides for the effective drainage of lots and roads    No acceptable outcome provided
  in a manner that:­
  (a)    maintains the natural flow regime;                            Editor’s Note— Requirements for the design and construction of
                                                                       stormwater management infrastructure are addressed in Part
  (b)    effectively manages stormwater quality and quantity; and
                                                                       9.4.9 Water Quality and Drainage code
  (c)    ensures no adverse impacts on receiving waters and
         surrounding land.


 Conflicting land uses            Table 9.5.1.3 Criteria for assessable development (part)
  Performance Outcomes                                                 Acceptable Outcomes
  Growth management
  Conflicting land uses
  PO25
  New lots for residential development do not adjoin land located in   No acceptable outcome provided
  the Medium impact industry zone or the Low impact industry zone.


 Rearrangement of Lot Boundaries                    Table 9.5.1.3 Criteria for assessable development (part)
  Performance Outcomes                                                 Acceptable Outcomes

  Growth management
  Rearrangement of Lot Boundaries
  PO26                                                                 AO26
  Development provides that the rearrangement of lot boundaries is     The rearrangement of lot boundaries results is an improvement to
  an improvement on the existing situation.                            the existing situation whereby the size and dimensions of
                                                                       proposed lots comply more fully with Table 9.5.1.4 Minimum lot
                                                                       size and dimensions. and at least one of the following is achieved:
                                                                       (a)   the rearrangement of lots remedies an existing boundary
                                                                             encroachment by a building or structure;
                                                                       (b)   the rearranged lots will be made more regular in shape;
                                                                       (c)   access is provided to a lot that previously had no access or
                                                                             an unsuitable access;
                                                                       (d)   the rearranged lots better meet the overall outcomes for the
                                                                             zone and the local plan area in which the site is situated;
                                                                       (e)   the rearrangement of lots provides for a significant
                                                                             improvement in rural productivity; or
                                                                       (f)   the rearrangement of lots results in a significant
                                                                             improvement in the protection of environmental values.

  If involving a standard format lot with common property such as requiring a community management scheme under the Body
  Corporate and Community Management Act 1997
  PO27


NOOSA PLAN 2020                                                                                                               Page 148 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.