Skip to the record
Accept no imitations.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Column 1                                                            Column 2
  Activity group                                                      Uses
                                                                      Substation
                                                                      Telecommunications facility
                                                                      Utility installation
  Recreation activities                                               Environment facility
                                                                      Indoor sport and recreation
                                                                      Major sport, recreation and entertainment facility
                                                                      Outdoor sport and recreation
                                                                      Park
  Rural activities                                                    Animal husbandry
                                                                      Animal keeping
                                                                      Aquaculture
                                                                      Cropping
                                                                      Intensive animal industry
                                                                      Intensive horticulture
                                                                      Permanent plantation
                                                                      Roadside stall
                                                                      Rural industry
                                                                      Wholesale nursery
                                                                      Winery


 SC1.1.2             Industry thresholds
 The industry thresholds listed in Table SC1.1.2 are to be used in conjunction with the defined uses listed in SC1.1.B.

  Table SC1.1.2 ­ Industry thresholds
  Use                                     Additional examples include
  Low impact industry                     (1)    Repairing and servicing motor vehicles, including mechanical components, radiators,
                                                 electrical components, wheel alignments, exhausts, tyres, suspension or air
                                                 conditioning, not including spray painting.
                                          (2)    Repairing and servicing lawn mowers and outboard engines.
                                          (3)    Fitting and turning workshop.
                                          (4)    Assembling or fabricating products from sheet metal or welding steel, producing less
                                                 than 10 tonnes per year and not including spray painting.
                                          (5)    Assembling wood products not involving cutting, routing, sanding or spray painting.
                                          (6)    Dismantling automotive or mechanical equipment, not including debonding brake or
                                                 clutch components.

   Medium impact industry                 (1)    Metal foundry producing less than 10 tonnes of metal castings per annum.
                                          (2)    Boiler making or engineering works producing less than 10,000 tonnes of metal
                                                 product per annum.
                                          (3)    Facility, goods yard or warehouse for the storage and distribution of dangerous goods
                                                 not involving manufacturing processes and not a major hazard facility under the Work
                                                 Health and Safety Act 2011.
                                          (4)    Abrasive blasting facility using less than 10 tonnes of abrasive material per annum.
                                          (5)    Enamelling workshop using less than 15,000 litres of enamel per annum.
                                          (6)    Galvanising works using less than 100 tonnes of zinc per annum.
                                          (7)    Anodising or electroplating workshop where tank area is less than 400 square metres.
                                          (8)    Powder coating workshop using less than 500 tonnes of coating per annum.
                                          (9)    Spray painting workshop (including spray painting vehicles, plant, equipment or boats)
                                                 using less than 20,000 litres of paint per annum.
                                          (10)   Scrap metal yard (not including a fragmentiser), dismantling automotive or mechanical


NOOSA PLAN 2020                                                                                                                Page 18 of 39
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.