2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Column 1 Column 2
Activity group Uses
Complementary use complementary use means any defined use excluding those listed as Accommodation
activities; Entertainment activities or Infrastructure activities in Table SC1.1.1.B Defined
activity groups or a brothel.
Constrained land constrained land means land defined by an overlay map
Deck deck means an external constructed floor which is not higher than 1m above the ground
level.
Defined flood event (DFE) defined flood event (DFE) means the event, measured in terms of the likelihood of
occurrence, adopted by the Council to manage development as identified in Table
8.2.6.5 Flood Levels and Flood Immunity Requirements of the Flood hazard overlay code.
The DFE incorporates an allowance for future climate change over the design life of the
development, through increased rainfall intensities and mean sea level rise.
DFE DFE Defined flood event means the event, measured in terms of the likelihood of
occurrence, adopted by the Council to manage development as identified in Table
8.2.6.5 Flood Levels and Flood Immunity Requirements of the Flood hazard overlay
code. The DFE incorporates an allowance for future climate change over the design life
of the development, through increased rainfall intensities and mean sea level rise.
Defined storm tide event (DSTE) defined storm tide event (DSTE), means the event, measured in terms of the likelihood of
occurrence, adopted by the Council to manage development as identified in Table
8.2.6.5 Flood Levels and Flood Immunity Requirements of the Flood hazard overlay code.
The DSTE incorporates an allowance for future climate change over the design life of the
development, through increased rainfall intensities and mean sea level rise.
DSTE DSTE defined storm tide event means the event, measured in terms of the likelihood of
occurrence, adopted by the Council to manage development as identified in Table
8.2.6.5 Flood Levels and Flood Immunity Requirements of the Flood hazard overlay code.
The DSTE incorporates an allowance for future climate change over the design life of the
development, through increased rainfall intensities and mean sea level rise.
DFE/DSTE defined flood event means the event, measured in terms of the likelihood of occurrence,
adopted by the Council to manage development as identified in Table 8.2.6.5 Flood Levels
and Flood Immunity Requirements of the Flood hazard overlay code. The DFE incorporates
an allowance for future climate change over the design life of the development, through
increased rainfall intensities and mean sea level rise.
defined storm tide event means the event, measured in terms of the likelihood of
occurrence, adopted by the Council to manage development as identified in Table
8.2.6.5 Flood Levels and Flood Immunity Requirements of the Flood hazard overlay code.
The DSTE incorporates an allowance for future climate change over the design life of the
development, through increased rainfall intensities and mean sea level rise.
Demand unit demand unit means a unit of measurement for measuring the level of demand for
infrastructure.
Development footprint development footprint for development, means a part of the premises that the development
relates to, including, for example, any part of the premises that, after the development is
carried out, will be covered by—
(a) buildings or structures, measured to their outermost projection; or
(b) landscaping or open space; or
(c) facilities relating to the development; or
(d) onsite stormwater drainage or wastewater treatment; or
(e) a car park, road, access track or area used for vehicle movement; or
NOOSA PLAN 2020 Page 25 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.