Original source · versioned page text
2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Column 1 Column 2
Activity group Uses
PMST PMST probable maximum storm tide means the maximum storm tide level that may be
expected from the combination of meteorological and hydrological conditions that are
reasonably possible in a particular locality, including the predicted impacts of climate
change.
Projection area projection area means a part of the local government area for which the local
government has carried out demand growth projection.
Property maintenance activity property maintenance activity means clearing protected vegetation which is reasonably
necessary for property maintenance including the following—
(a) maintenance of an existing farm track and existing farm shed
(b) construction of a farm track and farm shed on site for agricultural purposes, where
located outside the riparian buffer area
(c) construction of a new fence for a width of 5 metres either side the fence line, where
outside a riparian buffer area
(d) maintenance of crops
(e) slashing of grass
(f) harvesting of crops
(g) maintenance of pasture and cleared land areas
(h) pruning, felling and clearing of orchard vegetation species
(i) surveying purposes
(j) collection of firewood for noncommercial purposes
(k) removal of an pest plant species
(l) any other maintenance activity specified in a property vegetation management plan.
Property vegetation management plan property vegetation management plan is a specific program of vegetation management for
a category 4 lot approved under the former Local Law No. 10 (Vegetation Management).
Protected vegetation protected vegetation means vegetation protected from clearing in the Protected Vegetation
Overlay Area as follows—
(a) Category 1, 2 and 3 lots – all vegetation
(b) Category 4 lots – vegetation to be retained as part of a property vegetation
management plan
Protected vegetation overlay area protected vegetation overlay area applies to the whole of the planning scheme area of the
Noosa Plan
Pruning pruning has the meaning given in the AS 43732007 Pruning of Amenity Trees.
Public open space public open space means outdoor areas of land under the ownership of the Federal, State
or Local Government, to which the public may or may not have access. The term includes
lands reserved for parks or beach protection purposes but does not include land used for
Business activities or Infrastructure activities.
Rear lot rear lot means a lot where access is provided only by means of—
(a) an access strip which forms part of the lot; or
(b) an easement over contiguous land.
Reasonably necessary reasonably necessary means vegetation clearing for a particular purpose where there is no
alternative way of achieving the purpose that is prudent and feasible and that would avoid
clearing or significantly reduce the extent of vegetation clearing.
Reconfiguring a lot reconfiguring a lot means—
(a) creating lots by subdividing another lot; or
NOOSA PLAN 2020 Page 33 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.