Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix

of 389

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (19.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
  Column 1        Column 2                            Column 3           Column 4
  Map reference   Trunk infrastructure                Estimated timing   Establishment cost5
                  Widen / renew the boardwalk to
                  4.0 metres wide 375m
  PW26             Sunshine Beach, David Low          2020­2021          $313,683
                  Way– Hill St. to Vernon St – new
                  path adjacent to east side of
                  road 1032m
  PW27            Peregian, David Low Way             2021 ­2026         $89,419
                  (eastern side)– Service Road to
                  lane 275m
  PW28            Cooroy, Myall St. – Ferrells Rd to 2026­2031           $351,175
                  town – widen, replace 1035m
  PW29            Peregian, Plover St.– Piper St to   2016­2021          $18,237
                  David Low Way 60m
  PW30            Peregian, Podargus Parade–          2021 ­ 2026        $219,484
                  Parakeet Cres. To Persimmon
                  Drive – new path link 675m
  PW31            Castaways Beach, Driftwood          2016 ­ 2021        $21,276
                  Drive – David Low Way to
                  Wavecrest Dr. – new 2.0 m
                  pathway on north side to link
                  new bus stop 70m
  PW32            Sunrise Beach, Wollomia Way ­ 2021­2026                $252,001
                  Orient Drive to Dame Pattie Drive
                  – new 2.0m pathway 775
  PW33            Sunshine Beach, Pacific Avenue      2021­2026          $221,111
                  – Edward St. to Hill St – new
                  path east side 680m


  PW34            Sunshine Beach, Ferguson St.–       2021 ­ 2026        $61,780
                  Pacific Av. to Duke St. upgrade
                  and widen existing 190m
  PW35            Sunshine Beach, Duke St.–       2021 ­ 2026            $27,639
                  Ferguson St. to Douglas St. 85m
  PW36            Boreen Point, Laguna St.–           2021 ­ 2026        $76,413
                  Hector St. to Vista St. new
                  path 235m
  PW37            Boreen Point, Vista St.– Laguna     2021­2026          $78,039
                  St. to shops 240m
  PW38            Tewantin, Furness Drive –           2021­2026          $149,575
                  Blackheath Dr to St Andrews Dr
                  Completes missing link around
                  Furness Dr – 460m
  PW39            Noosa Heads, The Parade ­           2017­2018          $651,945
                  Main Beach trunk pathway –
                  upgrade and widening link from
                  Surf Club to Park Road 90m
  PW40            Tewantin, Griffith Av – Cooroy      2021­2026          $270,135
                  Noosa to No 64 – new
                  pathway, 890m
  PW41            Noosaville, Goodchap St ­ Juron 2021­2022              $55,277


NOOSA PLAN 2020                                                                                Page 16 of 73
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix.pdf · 19.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.