Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix

of 389

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (19.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
  Column 1        Column 2                           Column 3           Column 4
  Map reference   Trunk infrastructure               Estimated timing   Establishment cost5
                  Pathway, Kerb and Tactile
                  Ground Surface Indicators
  301736          Noosa Heads, Noosa Parade /        2019­2020          $15,204
                  Ravenwood Drive
                  Concrete Boarding point, Seat,
                  Pathway, Kerb and Tactile
                  Ground Surface Indicators
  301745          Noosaville, Eumundi­Noosa          2018­2019          $48,968
                  Road / Rene Street
                  Type C1­H shelter, Kerb, Tactile
                  Ground Surface Indicators, slab
                  and pathway connections
  301746          Noosaville, Eumundi­Noosa      2018­2019              $166,491
                  Road / Rene Street
                  Lower existing 3.5m wide path
                  by 1m.
                  Lower existing OPTIC FIBRE X2
                  Lower existing High Voltage
                  underground Power x 2
                  Lower existing Water Main
                  New boarding platform and seat
  301748          Gibson Road, Noosaville            2016­2017          $50,226
                  Type C1­H Shelter, Slab, Tactile
                  Ground Surface Indicators,
                  Pathway connection
  301749          Noosaville, Robert Street          2016­2017          $8,371
                  Concrete boarding platform,
                  Tactile Ground Surface
                  Indicators, Pathway connection
                  and Seat
  301750          Noosaville, The Cockleshell      2016­2017            $20,928
                  Raised concrete boarding
                  platform, Tactile Ground Surface
                  Indicators, Pathway connection,
                  Landscaping and Seat
  301762          Tewantin, Hilton Tce / Hilton      2018­2019          $7,835
                  Esplanade
                  Type C1­H shelter, Kerb, Tactile
                  Ground Surface Indicators, slab
                  and pathway connections
  301790          Peregian Beach, Woodland           2016­2017          $15,696
                  Drive
                  Concrete boarding platform,
                  Tactile Ground Surface
                  Indicators, Pathway connection
                  and Seat
  301799          Sunrise Beach (Northbound)         2016­2017          $83,711
                  Type C1­H Shelter, Slab, Tactile
                  Ground Surface Indicators,
                  Pathway connection, Kerb, and
                  Concrete indent bay
  301801          Sunrise Beach, Vernon Street       2016­2017          $68,015
                  (Northbound)


NOOSA PLAN 2020                                                                               Page 18 of 73
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix.pdf · 19.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.