Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix

of 389

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (19.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
  Column 1                        Column 2                          Column 3                      Column 4
  Map reference                   Trunk infrastructure              Estimated timing              Establishment cost6
  R3                              Peregian Beach, Peregian          2022/2023                     $132,250
                                  Beach Park – upgrades to toilet
                                  block, skate park and
                                  playground
  R5                              Sunrise Beach, Sunrise Beach      2021­2026                      $202,339
                                  Foreshore Reserve – picnic
                                  shelters and BBQ
  R7                              Sunshine Beach, Ed Webb Park      2021­2026                     $671,277
                                  –upgrade works
  R8                              Noosa Heads, Lions Park           2021­2026                     $589,376
                                  Noosa Heads – upgrade toilet
                                  block and playground facilities
  R9                              Noosa Heads, Pinaroo Park         2020/2021                     $161,250
                                  upgrade
  R10                             Noosa Heads, Noosa Woods          2021­2026                     $182,995
                                  Park – upgrade toilet blocks
  R27                             Noosaville, Lions Park –          2021­2026                     $360,205
                                  Upgrade Pirate park playground
  R28                             Noosaville, Noosa River           2021­2026                     $294,938
                                  Foreshore – new toilet block
                                  between Thomas Street and
                                  Robert Street
  R28                             Noosaville, Apex Park – upgrade 2021­2026                       $235,204
                                  to facilities and fitness
                                  equipment
  R29                             Noosaville, Chaplain Park         2021­2026                     $578,933
                                  upgrades
  R41                             Cooroy, Noosa Botanic Gardens 2021­2026                         $619,623
                                  – masterplan upgrade works
  R46                             Cooroy, Marara Street Park –      2019/2020                     $2,761,675
                                  new hinterland playground and
                                  toilet block
  R49                             Cooran, Straker Park – upgrade    2021­2026                     $85,277
                                  works
  R50                             Pomona, Stan Topper Park –        2021­2026                     $174,176
                                  toilet upgrade
  R53                             Pomona, Joe Bazzo Park – BBQ      2019/2020                     $32,250
                                  and pathways
  R55                             Pomona, Cooroora Creek Park – 2021­2026                         $124,546
                                  upgrade fitness equipment
  RF1                             Peregian Beach, Future Rufous     2021­2023                     $1,380,000
                                  Street Park –landscaping,
                                  embellishments and toilets
   TOTAL                                                                                           $34,287,871

 6Note­Table SC3.2.3 Column 4 the establishment cost is expressed in current cost terms as at the base date.


 SC3.3            Local government infrastructure plan maps
 SC3.3.1 Priority Infrastructure Area and Service Catchments

NOOSA PLAN 2020                                                                                                         Page 27 of 73
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix.pdf · 19.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.