Original source · versioned page text
2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix
Plans and drawings: the text below has words only, no drawings.
Very large file (19.9 MB): may take a few minutes to open.
(b) Walter Hay Drive intersection provides direct access to the transit hub. This gateway experience will be reinforced through
the protection of Character ‘Noosa style’ landscape buffer and enhanced by the development of adjacent sites (particularly
the Transit Hub) ensuring the built form positively addresses corners.
Appendix 1 SC6.8 Photos of key contextual and localised views
COOROY
POMONA
NOOSA PLAN 2020 Page 79 of 99
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.